Paul Fessler Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4153 Fax: 734.586.1431 Email: paul.fessler@dteenergy.com DTE September 30, 2019 10 CFR 55.40 NRC-19-0073 Mr. Robert Orlikowski Chief, Operations Branch Division of Reactor Safety Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Request for Retake Written Examination Outline Due to examination failures on the most recent Initial Exam (Reference the September 4, 2019, Final Denial Letters), DTE Electric Company requests a Written Examination Outline for one Reactor Operator (RO) and two Senior Reactor Operators (SRO) in accordance with NUREG-1021, Rev. 11, Section ES-201, C.l.a, Operator Licensing Examination Standards for Power Reactors.

On September 9, 2019, a telephone conversation between Mr. Bryan Bergeon, Operator Licensing Examiner, NRC Region III, and Mr. Michael Donigian, Supervisor Exam Development Team, DTE, was conducted to request a Written Examination Outline with the following tentative timeline:

January 6, 2020 Submit Written Exam Material January 17, 2020 Region III Exam Approval January 28, 2020 Written Exam Administration (1 day)

There are no regulatory commitments contained in this letter.

If there are any questions or if additional information is required, please contact Andrew Pullum, Director - Nuclear Training, at (734) 586-4055.

USNRC NRC-19-0073 Page 2 Sincerely, Paul Fessler Senior Vice President and Chief Nuclear Officer cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)