MONTHYEARNRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 ML22119A1732022-04-11011 April 2022 DTE Electric Company Submittal of Fermi 3 Periodic Reports NRC-21-0044, Annual Report for Period Ending June 30, 20212021-08-30030 August 2021 Annual Report for Period Ending June 30, 2021 NRC-21-0028, 2020 Annual Non-Radiological Environmental Operating Report2021-04-29029 April 2021 2020 Annual Non-Radiological Environmental Operating Report NRC-21-0026, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-21-0014, Submittal of 2020 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2021-04-23023 April 2021 Submittal of 2020 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-19-0056, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20192019-08-28028 August 2019 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2019 NRC-19-0033, Annual Non-Radiological Environmental Operating Report2019-04-30030 April 2019 Annual Non-Radiological Environmental Operating Report NRC-16-0053, Annual Report for Period Ending June 30, 20162016-08-18018 August 2016 Annual Report for Period Ending June 30, 2016 NRC-15-0088, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20152015-08-27027 August 2015 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2015 NRC-15-0054, Annual Non-Radiological Environmental Operating Report for 20142015-04-29029 April 2015 Annual Non-Radiological Environmental Operating Report for 2014 NRC-14-0064, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20142014-08-28028 August 2014 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2014 NRC-14-0033, Annual Non-Radiological Environmental Operating Report for 20132014-04-28028 April 2014 Annual Non-Radiological Environmental Operating Report for 2013 NRC-13-0048, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20132013-08-26026 August 2013 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2013 NRC-13-0025, Annual Non-Radiological Environmental Operating Report2013-04-24024 April 2013 Annual Non-Radiological Environmental Operating Report NRC-12-0029, Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report2012-04-27027 April 2012 Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report NRC-12-0031, Annual Non-Radiological Environmental Operating Report for 20112012-04-25025 April 2012 Annual Non-Radiological Environmental Operating Report for 2011 NRC-11-0043, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 20112011-08-30030 August 2011 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 2011 NRC-11-0016, Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual2011-04-28028 April 2011 Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report and Revised Offsite Dose Calculation Manual NRC-10-0064, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20102010-08-31031 August 2010 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2010 NRC-10-0038, Annual Non-Radiological Environmental Operating Report for 20092010-04-28028 April 2010 Annual Non-Radiological Environmental Operating Report for 2009 NRC-10-0036, Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report2010-04-28028 April 2010 Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report NRC-09-0051, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 20092009-08-27027 August 2009 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report Period Ending June 30, 2009 NRC-08-0057, Enrico Fermi, Unit 1, Annual Report for the 2nd Quarter of 20082008-08-28028 August 2008 Enrico Fermi, Unit 1, Annual Report for the 2nd Quarter of 2008 ML0812202332008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 NRC-08-0031, Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 20072008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 NRC-08-0026, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2008-03-31031 March 2008 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-07-0020, Annual Radiological Effluent Release and Radiological Environmental Operating Reports2007-04-27027 April 2007 Annual Radiological Effluent Release and Radiological Environmental Operating Reports NRC-05-0036, Annual Non-Radiological Environmental Operating Report for 20042005-04-29029 April 2005 Annual Non-Radiological Environmental Operating Report for 2004 NRC-04-0026, 2003 Annual Non Radiological Environmental Operating Report for Fermi 22004-04-30030 April 2004 2003 Annual Non Radiological Environmental Operating Report for Fermi 2 NRC-04-0025, 2003 Annual Reports for Fermi 22004-04-29029 April 2004 2003 Annual Reports for Fermi 2 NRC-03-0042, 2002 Annual Reports for Fermi 22003-04-28028 April 2003 2002 Annual Reports for Fermi 2 NRC-03-0041, Annual Non Radiological Environmental Operating Report2003-04-28028 April 2003 Annual Non Radiological Environmental Operating Report NRC-02-0031, 2001 Annual Non-Radiological Environmental Operating Report for Fermi 22002-04-24024 April 2002 2001 Annual Non-Radiological Environmental Operating Report for Fermi 2 2023-08-31
[Table view] Category:Letter type:NRC
MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12
[Table view] |
Text
Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Fax: 734.586,4172 August 30, 2011 NRC-11-0043 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555
References:
- 1) Enrico Fermi Atomic Power Plant, Unit 1 NRC Docket No. 50-16 NRC License No. DPR-9
- 2) Detroit Edison Letter to USNRC, "Enrico Fermi Atomic Power Plant Unit 1 Fermi 1 Decommissioning Project Schedule and Cost Changes", NRC-11-0040 dated August 16, 2011
Subject:
Enrico Fermi Atomic Power Plant, Unit 1 Annual Report Period Ending June 30, 2011 Pursuant to Section F.7 (Reporting Requirements) of the Technical Specifications for Provisional Operating License No. DPR-9, the annual report for the period ending June 30, 2011 for the SAFSTOR Fermi 1 facility is enclosed.
Should you have any questions, please contact Lynne S. Goodman, Manager, Fermi 1 at 734-586-1205.
Sincerely, Enclosure cc: NRC Regional Administrator, Region III T. Smith, NRC (Washington, D.C.)
NRC Resident Inspector- Fermi 2 P. Lee, NRC Region III Michigan Department of Natural Resources & Environment (yalek@michigan.gov)
Enclosure to NRC-11-0043 Page 1 DETROIT EDISON COMPANY ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 Docket No. 50-16 License No. DPR-9 Annual Report for Period July 1, 2010 through June 30, 2011 Approved by: __ Date: /**&3 /
Lynne S. Goodman Custodian
Enclosure to NRC-11-0043 Page 2 ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 ANNUAL REPORT JULY 1, 2010 THROUGH JUNE 30, 2011 1.0 PREFACE This report provides a summary of the activities performed and the results of the facility surveillance program of the Enrico Fermi Atomic Power Plant, Unit 1 Decommissioning Project, during the past twelve (12) months ending June 30, 2011.
In summary, required activities were conducted in accordance with the Operating License and Technical Specifications. Fermi 1 continued decommissioning activities with the removal of contaminated components and commencement of final status surveys to achieve license termination. Based on a review performed during this period, Detroit Edison has decided to return the project to a passive monitoring SAFSTOR status late in 2011.
2.0 SAFSTOR STATUS 2.1 Health Physics 2.1.1 Personnel Exposure From July 1, 2010 through June 30, 2011, all monitored Fermi 1 personnel wore Thermoluminescent Dosimeters (TLDs) as dosimetry of record. Electronic Dosimeters (EDs) were worn from July 1, 2010 through June 30, 2011 as secondary dosimetry at Fermi 1. All visitors were appropriately escorted and wore EDs as a minimum when entering all Radiologically Restricted Areas (RRA).
The cumulative whole body dose from activities associated with Fermi 1 was 21,889 millirem for this reporting period. This is based on TLD readings for the whole period except for July 2010, which is based on ED readings. Electronic dosimeter readings were used for July 2010, since TLD readings for the second quarter of 2010 overlapped through July.
2.2 Surveillance Program 2.2.1 Environmental Surveys No liquid radiological releases occurred during this period; therefore, environmental monitoring samples were not required.
2.2.2 Weekly Tests and Inspections SGeneral area - The Fermi 1 staff performed walk through and visual inspections as required by Technical Specifications. No issues were identified during the inspections.
Enclosure to NRC-11-0043 Page 3 2.2.3 Monthly Inspections
- Controlled Area Inspections - During the specified interval, Fermi 1 staff conducted visual inspections of the fences, gates, and doors and surveyed the sump water levels from the top access points of all active sumps. Only minor issues requiring replacement of sump pumps and a door seal were identified during the inspections.
2.2.4 Ouarterly Surveillances Radiological Surveys - The Radiation Protection technicians checked the Reactor Building and the Fuel and Repair Building (FARB) for presence of gamma radiation, as well as beta, gamma, and alpha contamination. There were no unexpected radiation readings detected. The results of the quarterly contamination surveys indicated general area walkways remain <500-dpm/100 cm2 beta/gamma and <20-dpm/100-cm2 alpha.
3.0 DECOMMISSIONING PROJECT The Fermi 1 Decommissioning Project continued during this period including equipment removal, decontamination, and commencement of final status surveys. Details are discussed below.
Based on a review performed this year, Detroit Edison has decided to return the project to a passive monitoring SAFSTOR status from the active final decontamination phase of SAFSTOR. Selected activities will be completed later this year prior to returning to passive SAFSTOR. Details are discussed in Reference 2.
The Fermi 1 staff collected groundwater monitoring well samples and installed five (5) new wells to obtain information for license termination planning. No radioactive isotopes were detected above background levels, with the exception of Radium (226 and 228) levels in one bedrock well that was slightly above background bedrock radium levels. Radium is a naturally-occurring radioactive metal and while included in the groundwater monitoring program, it is not included in the final suite of isotopes for the License Termination Plan.
The following activities were conducted during this period:
- Cut the reactor vessel into three (3) sections: Conical Section, Cylindrical Section, and Lower Reactor Vessel (LRV).
- The Conical and Cylindrical Sections were segmented into smaller pieces to facilitate packaging. These segmented pieces were packaged and shipped off site.
- Removed the bases and stands from the three (3) Primary Sodium Pumps and three (3) Intermediate Heat Exchangers.
- Removed additional graphite shielding from on and around reactor to facilitate cutting the reactor into sections. Some graphite remains and will be removed only as needed for access to allow for the shielding effect as long as possible.
- Began cutting the Transition Deck free of the LRV at the end of the period.
Enclosure to NRC-11-0043 Page 4
- Removed fuel pool sump pumps 6 and 7 and associated piping.
- Pumped out water from Maintenance Pit Sump, cleaned pit and removed decontamination chamber.
- Removed slightly contaminated silt from the bottoms of Sumps 10, 4, and 1.
- Evaporated plant water using drum dryers.
- Removed abandoned equipment in Reactor Building lower level.
- Cleaned out Fuel and Repair Building (FARB) Dump Tank Room.
- Began neutralizing caustic and removing liquid and sludge in primary sodium 30" lines at the end of the period.
- Removed abandoned hot sump equipment.
- Removed Steam Cleaning Chamber equipment and sealed floor penetrations.
- Removed abandoned pipe and cables in the NaK Room.
- Removed equipment from the Cold Trap Room.
- Removed abandoned pipe and cables from the New Fuel Loading Tunnel.
- Began removal of abandoned pipes and cables in the FARB.
- Removed bottom portion of Sodium Tunnel liner.
- Removed steel shot from FARB Pump Room.
- Decontaminated Dump Tank Room, East Sodium Gallery, Decay Pool, and Waste Tank Room.
- Prepared for Final Status Surveys (FSS).
Some of the removed components have already been shipped offsite. As discussed in Reference 2, the majority of accumulated low level radioactive waste will be shipped offsite for disposal prior to the return to passive monitoring SAFSTOR status.
Radiological Surveys Radiological surveys were conducted in accordance with plant procedures. Unexpected radiological conditions were encountered only in one area during this reporting period.
Sodium Tunnel survey found contamination in concrete joints underneath the steel liner.
The bottom portion of the liner was removed for further survey, and fixed contamination was found in the concrete structure. Remediation is being performed.
3.1 Radiological Shipments The Fermi 1 team shipped the following materials offsite without incident from Fermi 1 during the reporting period. Tools and equipment shipped to Fermi 2 are not included in this table.
Enclosure to NRC-11-0043 Page 5 ActivityS. Volume Vole Weight Shipment Material .Shipment Destination Gross Gross Number Description Category (mCi) (ft3) (lbs)
Cutting Waltz Mill EF1-10-018 qui nt Main, P Exempt 7.03E-02 56.8 790 Equipment Madison, PA EF1-10-019 Contaminated UniTech, Morris LQ 5.26 295 5140 Laundry IL GEL EF1-10-020 Samples Laboratories, LQ 1.20E-02 0.6 4.3 Charleston SC EF EF10-021 021 ontaminated Laundry UniTech, Morris LQ 6.61 354 6485 IL DAW/Metal W/etal Energy Solutions EF1-10-022 aste BWF, LSA 4.78E+01 4830.7 207,760 Asbestos Clive UT Clive UT Waste GEL EF1-10-023 Samples Laboratories, LQ 1.99E-02 0.5 5 Charleston SC Contaminated UniTech, Morris EF-10-024 LaundryLQ 5.28 295 5310 Contaminated UniTech, Morris EF-10-025 Laundry ILLQ 5.17 295 4880 Laundry IL
- 6. 3 EF1-11-001 EF1-11-002 Contaminated UniTech, Morris LQ LQ 6.325 354 354 5740 5700 Laundry IL EF11-003 ontaminated UniTech, Morris LQ 4.94 236 3800 Laundry IL GEL EF1-11-004 Samples Laboratories, LQ 3.21E-02 0.1 2 Charleston SC 1-11-005 EF1-11-005 ontaminated UniTech, Morris LQ 6.17 295 4740 Laundry IL DAW/Metal Energy Solutions EF1-11-006 Wae BWF, LSA 3.66 690 24,000 Waste Clive UT DAW/Metal Waste/Steel Energy Solutions EFI-11-007 Shot & BWF, LSA 3.69E+01 4760 157,560 Asbestos Clive UT Waste
Enclosure to NRC-11-0043 Page 6 S Volume Weight Shipment Material Shipment Activitye Destination Gross Gross Number Description Category (mCi) (ft3) (lbs Energy Solutions EF1-11-008 Activated Steel BWF, CliveUs LSA 2.81E+03 770.4 253,200 BWF, Clive UT EF-11-009 ontaminated UniTech, Morris LQ 6.96 354 5980 Laundry IL EFI-1C-0 ontaminated UniTech, Morris LQ 8.88 354 7200 Laundry IL EFI-11-011 Contaminated UniTech, Morris LQ 4.45 177 360 Laundry IL BWF - Bulk Waste Facility DAW - Dry Active Waste LQ - Limited Quantity LSA - Low Specific Activity
Enclosure to NRC- 11-0043 Page 7 3.2 License Termination Plan Final Status Surveys were performed in the following areas or survey units:
- Control Building (interior and roof)
- Fission Product Detector Building
- Fuel and Repair Building (FARB) Decay Pool
- Inert Gas Building tunnel and tank room, roof, and exterior (excludes mezzanine and compressor pits)
- Sodium Building roofs and exterior
- Land outside Controlled Area fence
- Portions of the land areas inside the Controlled Area fence
- Ventilation Building exterior walls and roof
- Waste Gas Building 4.0 RADIOLOGICAL EFFLUENTS There were no unplanned radiological gaseous effluent releases during the reporting period. All measurable releases were associated with the decommissioning project. The maximum dose to an offsite member of the public from these releases was 1.0 E-6 mrem Total Effective Dose Equivalent (TEDE) derived from a total of 2.1 mCi of tritium. The gaseous effluent releases were below the Technical Specification air dose limit of 10 mrad of gamma radiation and 20 mrad of beta radiation per year. The individual dose calculated due to gaseous effluent releases was below the Technical Specification dose limit of 5 mrem Total Effective Dose Equivalent.
5.0 50.59 EVALUATIONS, DESIGN CHANGES AND LER's 5.1 10 CFR 50.59 The Fermi 1 team conducted one 10 CFR 50.59 evaluation during this period. Screenings determined that 50.59 evaluations were not required for other activities.
10-008-SE 50.59 Evaluation addresses abandoning the Fuel and Repair Building (FARB) radioactive drain lines and hot sump.
Enclosure to NRC-11-0043 Page 8 Note that the drain lines and hot sump will not be abandoned at this time due to the return of the facility to the monitored passive SAFSTOR status. Detroit Edison will address the drain lines and hot sump during the planning for return to active decommissioning.
Summary:
This 50.59 evaluation supports design change 09-025-DC, Fermi 1 Safety Analysis Report change 09-023-SAR and work request EF1-09-024 for abandoning the radioactive drain lines and hot sump in the FARB as part of decommissioning.
The 50.59 evaluation addressed that the FARB systems containing radioactive water during plant operation have been abandoned and drained. The waste tanks and majority of the fuel pool liners had been removed at the time the evaluation was written. The steam cleaning chamber equipment removal was in progress. Therefore, the main reason a radioactive water drain system was designed and installed for the FARB no longer applies. The evaluation addressed that the work request would have a hold point to ensure that the temporary evaporation of contaminated water in the FARB was completed prior to plugging the drains and removing the sump. Remaining water sources in the FARB would be due to rain, snow or groundwater in leakage.
The 50.59 evaluation concluded that there would not be more than a minimal increase in the frequency or consequences of an accident or malfunction after this change would be implemented. The change would not create a possibility of an accident of a different type or malfunction of a system, structure or component important to safety with a different result. Since no fuel is stored at Fermi 1, there are no fission product barriers with design limits. Based on the evaluation, NRC prior review was not required.
5.2 Design Changes During this reporting period, Design Change 08-045-DC was completed with the removals of the Liquid Waste and Gaseous Waste systems, abandoned hot sump equipment, and control panel in the FARB. No other Design Changes were implemented during this reporting period.
5.3 Licensee Event Reports There were no Licensee Event Reports during this reporting period.
6.0 AUDIT SUBCOMMITTEE The Audit Subcommittee inspected the physical facility and reviewed the Technical Specification surveillance records during the reporting period. No significant problems were identified.
All audit reports are maintained on file.