NRC-16-0053, Annual Report for Period Ending June 30, 2016
| ML16235A125 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/18/2016 |
| From: | Polson K DTE Electric Company, DTE Energy |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| NRC-16-0053 | |
| Download: ML16235A125 (4) | |
Text
Keith I Poison Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4849 Fax: 734.586.4172 Email: polsonk@dteenergy.com q
DTE Energy-August 18, 2016 NRC-16-0053 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Reference:
Enrico Fermi Atomic Power Plant, Unit 1 NRC Docket No. 50-16 NRC License No. DPR-9
Subject:
Enrico Fermi Atomic Power Plant, Unit 1 Annual Report for Period Ending June 30, 2016 Pursuant to Section F.7, Reporting Requirements, of the Technical Specifications for Provisional Operating License No. DPR-9, the Annual Report for the period ending June 30, 2016 for the SAFSTOR Fermi 1 facility is enclosed.
No new commitments are made in this letter.
Should you have any questions, please contact Daniel Breiding, Fermi 1 Custodian, at 734-586-1912.
Sincerely, Keith J. Polson Site Vice President Nuclear Generation
Enclosure:
Fermi 1 Annual Report for Period Ending June 30, 2016 cc:
NRC Regional Administrator, Region III T. Smith, NRC (Washington, DC)
NRC Resident Inspector - Fermi 2 P. Lee, NRC Region III Michigan Public Service Commission Regulated Energy Division (kindschlamichigan.gov)
Enclosure to NRC-16-0053 DTE ELECTRIC COMPANY ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 Docket No. 50-16 License No. DPR-9 Annual Report for Period July 1, 2015 through June 30, 2016 Approved by:
Date:
/
/
Daniel T. Breiding Fermi 1 Custodian
Enclosure to NRC-16-0053 Page 1 ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 ANNUAL REPORT JULY 1, 2015 THROUGH JUNE 30, 2016 1.0 PREFACE This report provides a summary of the activities performed and the results of the facility surveillance program of the Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1), during the past twelve (12) months ending June 30, 2016.
In summary, required activities were conducted in accordance with the Operating License and Technical Specifications. Fermi 1 is in passive monitoring SAFSTOR status.
2.0 SAFSTOR STATUS 2.1 Health Physics 2.1.1 Personnel Exposure From July 1, 2015 through June 30, 2016, all monitored Fermi 1 personnel wore Dosimeters of Legal Record (DLRs). Additionally, Electronic Dosimeters (EDs) were worn throughout the reporting period as secondary dosimetry. All visitors were appropriately escorted and wore EDs, as a minimum, when entering all Fermi 1 Radiologically Restricted Areas (RRA).
The accumulated whole body dose for personnel assigned to Fermi 1 was 0.00 REM for this reporting period. The total dose is based on data from the following:
0.00 REM (DLR-based) 01JUL15 - 30JUN16 2.2 Surveillance Program 2.2.1 Environmental Surveys No liquid radiological releases occurred during this period; therefore, environmental monitoring samples were not required.
2.2.2 Weekly Tests and Inspections General area --- The Fermi 1 staff performed walk throughs and visual inspections as required by Technical Specifications. No significant issues were identified during the inspections.
2.2.3 Monthly Inspections Controlled Area Inspections --- During the specified interval, Fermi 1 staff conducted visual inspections of the fences, gates, doors, and surveyed the sump water
Enclosure to NRC-16-0053 Page 2 levels from the top access of all active sumps. No significant issues were identified during the inspections.
2.2.4 Quarterly Surveillances Radiological Surveys --- The Radiation Protection technicians monitored the Reactor Building and the Fuel and Repair Building (FARB) for presence of gamma radiation, as well as beta, gamma, and alpha contamination. There were no unexpected radiation readings detected. The results of the quarterly contamination surveys indicated general area walkways remain < 500 dpm/100 cm2 beta/gamma and
< 20 dpm/100 cm2 alpha.
3.0 GROUNDWATER MONITORING The Fermi 1 staff collected groundwater monitoring well samples and no plant-related radioactive isotopes were detected above background levels. The results between July 2015 and June 2016 have been reviewed. These samples were analyzed by the contract laboratory and all results were negative for tritium.
4.0 RADIOLOGICAL SHIPMENTS There were no radiological materials shipped offsite from Fermi 1 during the reporting period.
5.0 RADIOLOGICAL EFFLUENTS There were no radiological gaseous effluent releases during the reporting period.
6.0 50.59 EVALUATIONS, DESIGN CHANGES, AND LERs 6.1 10 CFR 50.59 There were no 10 CFR 50.59 evaluations performed during this period. Screenings determined that 50.59 evaluations were not required.
6.2 Design Changes There were no Design Changes during this reporting period.
6.3 Licensee Event Reports There were no Licensee Event Reports (LERs) during this reporting period.
7.0 AUDIT SUBCOMMITTEE The Audit Subcommittee inspected the physical facility and reviewed the Technical Specification surveillance records during the reporting period. No significant problems were identified.
All audit reports are maintained on file.