NLS2002116, August 2002 Monthly Operating Report for Cooper

From kanterella
Jump to navigation Jump to search
August 2002 Monthly Operating Report for Cooper
ML022600318
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/13/2002
From: Hutton J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NLS2002116
Download: ML022600318 (6)


Text

I ,

H Nebraska Public Power District Nebraska's Energy Leader September 13, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Status Report for August 2002, Docket No. 50-298 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for August 2002. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of August. In accordance with Technical Specification 5.6.4, this report also includes documentation ofchallenges to the safety/relief valves.

Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.

Sincerely, pameskA.'Hutton Plant Managgerr

/cb Enclosure cc: NRC Regional Administrator NRC Senior Resident Inspector ANI Library J. M. Cline A. L. Dostal J. W. Dutton D. T. McNeil R. L. Gumm INPO Records Center D. Bantam G. W. Griffith Cooper Nuclear Station P.O. Box 98 /Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //www nppd corn

NLS2002116 Page 2 B. Lewis W. R. Mayben W. D. Shanks D. L. Wilson Records

APPENDIX A OPERATING DATA REPORT DOCKET NO 050-0298 UNIT NAME Cooper Nuclear Station DATE 9/1312002 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 Reporting Period: August 2002 This Month Yr -to-Date Cumulative Design Electrical Rating (Net MWe) 7780 N/A N/A The nominal net electncal output of the unit specified by the utility and used for the purpose of plant design 2 Maximum Dependable Capacity (Net MWe) 7640 N/A N/A The gross electncal output as measured at the output terminals of the turbine generator during the most restnctive seasonal conditions minus the normal station service loads 3 Number of I lours the Reactor Was Critical 744 0 5705 0 189594 1 The total number of hours during the gross hours of the reporting period that the reactor was cntical 4 Number of flours the Generator Was On Line 7440 55655 1869203 (Also called Service flours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period 5 Urut Reserve Shutdown flours 00 00 00 The total number of hours dunng the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation 6 Net Electrical Energy (MWII) 5560800 41421290 1264856500 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours Negative quantities should not be used 9/4/2002 9:01 AM

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 9/13/2002 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH August 2002 Type Method Of Shutting CAUSE/CORRECTIVE ACTIONS No. Date F: FORCED Duration (flours) Reason (I) Down Reactor (2) COMMENTS S: SCHEDULED None

SUMMARY

None (i) Reason:

A - Equipment Failure (Explain)

If - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

I1 - Other (Explain)

(2) Method:

I -Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 9/4/2002 9:01 AM

APPENDIX C SAFETY/RELIEF VALVE CHALLENGES AUGUST 2002 There were no challenges to the safety/relief valves during the month of August.

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002116 I The following table identifies those actions committed to by Nebraska Public Power District I (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None PROCEDURE 0.42 REVISION 11 PAGE 13 OF 16

Text

I ,

H Nebraska Public Power District Nebraska's Energy Leader September 13, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Status Report for August 2002, Docket No. 50-298 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for August 2002. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of August. In accordance with Technical Specification 5.6.4, this report also includes documentation ofchallenges to the safety/relief valves.

Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.

Sincerely, pameskA.'Hutton Plant Managgerr

/cb Enclosure cc: NRC Regional Administrator NRC Senior Resident Inspector ANI Library J. M. Cline A. L. Dostal J. W. Dutton D. T. McNeil R. L. Gumm INPO Records Center D. Bantam G. W. Griffith Cooper Nuclear Station P.O. Box 98 /Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //www nppd corn

NLS2002116 Page 2 B. Lewis W. R. Mayben W. D. Shanks D. L. Wilson Records

APPENDIX A OPERATING DATA REPORT DOCKET NO 050-0298 UNIT NAME Cooper Nuclear Station DATE 9/1312002 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 Reporting Period: August 2002 This Month Yr -to-Date Cumulative Design Electrical Rating (Net MWe) 7780 N/A N/A The nominal net electncal output of the unit specified by the utility and used for the purpose of plant design 2 Maximum Dependable Capacity (Net MWe) 7640 N/A N/A The gross electncal output as measured at the output terminals of the turbine generator during the most restnctive seasonal conditions minus the normal station service loads 3 Number of I lours the Reactor Was Critical 744 0 5705 0 189594 1 The total number of hours during the gross hours of the reporting period that the reactor was cntical 4 Number of flours the Generator Was On Line 7440 55655 1869203 (Also called Service flours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period 5 Urut Reserve Shutdown flours 00 00 00 The total number of hours dunng the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation 6 Net Electrical Energy (MWII) 5560800 41421290 1264856500 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours Negative quantities should not be used 9/4/2002 9:01 AM

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 9/13/2002 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH August 2002 Type Method Of Shutting CAUSE/CORRECTIVE ACTIONS No. Date F: FORCED Duration (flours) Reason (I) Down Reactor (2) COMMENTS S: SCHEDULED None

SUMMARY

None (i) Reason:

A - Equipment Failure (Explain)

If - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

I1 - Other (Explain)

(2) Method:

I -Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 9/4/2002 9:01 AM

APPENDIX C SAFETY/RELIEF VALVE CHALLENGES AUGUST 2002 There were no challenges to the safety/relief valves during the month of August.

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002116 I The following table identifies those actions committed to by Nebraska Public Power District I (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None PROCEDURE 0.42 REVISION 11 PAGE 13 OF 16