NLS2003021, January 2003 Monthly Operating Report for Cooper Nuclear Station
| ML030510222 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/13/2003 |
| From: | Hutton J Nebraska Public Power District (NPPD) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NLS2003021 | |
| Download: ML030510222 (5) | |
Text
N Nebraska Public Power District Nebraska's Energy Leader NLS2003021 February 13, 2003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for January 2003, Docket No. 50-298 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Report for January 2003. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of January. In accordance with Technical Specification 5.6.4, this report also includes documentation ofchallenges to the safety/relief valves.
Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.
Sincerely, MJmesA.Hutton flant Manager
/cb Enclosure cc: NRC Regional Administrator W. J. Fehrman NRC Senior Resident Inspector W. D. Shanks ANI Library C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. W. Griffith J. W. Dutton D. T. McNeil R. L. Gumm INPO Records Center Records Cooper Nuclear Station P.O Box 98/ Brownvdle, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //www nppd corn -ýo
APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 2114/2003 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 Reporting Period: Januari 2003 This Month Yr -to-Date Cumulative Design Electrical Rating (Net MWe) 7780 N/A N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design 2 Maximum Dependable Capacity (Net MWe) 7640 N/A N/A The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads 3 Number of [fours the Reactor Was Critical 744 0 744 0 193267.1 The total number of hours dunng the gross hours of the reporting penod that the reactor was crtical 4 Number of flours the Generator Was On Line 7440 7440 1906146 (Also called Service flours) The total number of hours dunng the gross hours of the reporting penod that the unit operated with the breakers closed to the station bus The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting penod 5 Unit Reserve Shutdo%%n Ilours 00 00 00 The total number of hours dunng the gross hours of the reporting period that the unit %%asremoed from service for economic or similar reasons but was available for operation 6 Net Electrical Energy (MWII) 5708580 5708580 1292325300 The gross electncal output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads dunng the gross hours of the repormng penod. expressed in mega watt hours Negative quantities should not be used 2/f/2003 9.01 MIt
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 2/14/2003 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH January 2003 Type Method Of Shutting CAUSE/CORRECTIVE ACTIONS No. Date F: FORCED Duration (Hours) Reason (1) Down (2) COMMENTS S: SCHEDULED None 4 4 1 A L .1. J. L
SUMMARY
- None (1) Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
Ii - Other (Explain)
(2) Method:
I -Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 -Other (Explain) 2/6/2003 9:02 AM
APPENDIX C SAFETY/RELIEF VALVE CHALLENGES JANUARY 2003 There were no challenges to the safety/relief valves during the month of January.
I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2003021 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None I
I PROCEDURE 0.42 1 REVISION 12 1 PAGE 14 OF 16
Text
N Nebraska Public Power District Nebraska's Energy Leader NLS2003021 February 13, 2003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for January 2003, Docket No. 50-298 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Report for January 2003. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of January. In accordance with Technical Specification 5.6.4, this report also includes documentation ofchallenges to the safety/relief valves.
Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.
Sincerely, MJmesA.Hutton flant Manager
/cb Enclosure cc: NRC Regional Administrator W. J. Fehrman NRC Senior Resident Inspector W. D. Shanks ANI Library C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. W. Griffith J. W. Dutton D. T. McNeil R. L. Gumm INPO Records Center Records Cooper Nuclear Station P.O Box 98/ Brownvdle, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http //www nppd corn -ýo
APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 2114/2003 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 Reporting Period: Januari 2003 This Month Yr -to-Date Cumulative Design Electrical Rating (Net MWe) 7780 N/A N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design 2 Maximum Dependable Capacity (Net MWe) 7640 N/A N/A The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads 3 Number of [fours the Reactor Was Critical 744 0 744 0 193267.1 The total number of hours dunng the gross hours of the reporting penod that the reactor was crtical 4 Number of flours the Generator Was On Line 7440 7440 1906146 (Also called Service flours) The total number of hours dunng the gross hours of the reporting penod that the unit operated with the breakers closed to the station bus The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting penod 5 Unit Reserve Shutdo%%n Ilours 00 00 00 The total number of hours dunng the gross hours of the reporting period that the unit %%asremoed from service for economic or similar reasons but was available for operation 6 Net Electrical Energy (MWII) 5708580 5708580 1292325300 The gross electncal output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads dunng the gross hours of the repormng penod. expressed in mega watt hours Negative quantities should not be used 2/f/2003 9.01 MIt
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 2/14/2003 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH January 2003 Type Method Of Shutting CAUSE/CORRECTIVE ACTIONS No. Date F: FORCED Duration (Hours) Reason (1) Down (2) COMMENTS S: SCHEDULED None 4 4 1 A L .1. J. L
SUMMARY
- None (1) Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
Ii - Other (Explain)
(2) Method:
I -Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 -Other (Explain) 2/6/2003 9:02 AM
APPENDIX C SAFETY/RELIEF VALVE CHALLENGES JANUARY 2003 There were no challenges to the safety/relief valves during the month of January.
I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2003021 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None I