NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis
ML24072A512 | |
Person / Time | |
---|---|
Site: | Hatch, 07200036 |
Issue date: | 03/12/2024 |
From: | Coleman J Southern Nuclear Operating Co |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
NL-24-0062 | |
Download: ML24072A512 (1) | |
Category:Emergency Preparedness-Emergency Plan
MONTHYEARNL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024
[Table view]Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-21-1104, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2021-12-20020 December 2021 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions NL-20-1369, & Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2021-01-12012 January 2021 & Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML20192A1402020-06-30030 June 2020 Southern Nuclear Operating Co., Inc. - License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML18226A0952018-04-10010 April 2018 Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis NL-17-1089, Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis2018-04-10010 April 2018 Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis NL-17-1089, Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis2018-04-10010 April 2018 Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis NL-18-0033, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2018-01-12012 January 2018 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-17-1808, Report of Changes to Emergency Plan and Summary of 50.54(g) Analysis2017-11-0909 November 2017 Report of Changes to Emergency Plan and Summary of 50.54(g) Analysis NL-16-1028, E.I. Hatch and Vogtle - Report of Changes to Emergency Plan2016-06-30030 June 2016 E.I. Hatch and Vogtle - Report of Changes to Emergency Plan NL-16-0739, Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan2016-05-26026 May 2016 Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan NL-16-0397, Report of Changes to Emergency Plan2016-03-15015 March 2016 Report of Changes to Emergency Plan ML16060A3342016-02-17017 February 2016 Enclosure 8: Hatch Standard Emergency Plan Annex NL-16-0169, Enclosures 15, 16, 17, 18 & 19: Vogtle (Units 3 & 4) - Justification Matrix, Evaluation of Proposed Changes LAR for Revision for Emergency Planning ITAAC, Rev to Units 3 & 4 COL Appendix C - Proposed Changes, and Off-Site Response Organiz2016-02-17017 February 2016 Enclosures 15, 16, 17, 18 & 19: Vogtle (Units 3 & 4) - Justification Matrix, Evaluation of Proposed Changes LAR for Revision for Emergency Planning ITAAC, Rev to Units 3 & 4 COL Appendix C - Proposed Changes, and Off-Site Response Organizat NL-16-0169, Enclosures 10, 11, 12, 13 & 14: Vogtle (Units 1 & 2) Staffing - Detailed Description and Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Staffing-Detailed Description and Technical Evaluation and Standard Emerge2016-02-17017 February 2016 Enclosures 10, 11, 12, 13 & 14: Vogtle (Units 1 & 2) Staffing - Detailed Description and Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Staffing-Detailed Description and Technical Evaluation and Standard Emergenc NL-16-0169, Enclosure 8: Hatch Standard Emergency Plan Annex2016-02-17017 February 2016 Enclosure 8: Hatch Standard Emergency Plan Annex NL-16-0169, Enclosure 6: Farley Justification Matrix2016-02-17017 February 2016 Enclosure 6: Farley Justification Matrix NL-16-0169, Enclosure 20: SNC Standard Emergency Plan LAR - Updated Clean Version of Enclosures 1-192016-02-17017 February 2016 Enclosure 20: SNC Standard Emergency Plan LAR - Updated Clean Version of Enclosures 1-19 NL-16-0169, Enclosures 13, 14, 15, 16, 17, 18, 19 Re Vogtle Units 3 & 4 Detailed Description & Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Evaluation of Proposed Changes, Revision to Units 3 & 4 COL Appendix C & Off-Sit2016-02-17017 February 2016 Enclosures 13, 14, 15, 16, 17, 18, 19 Re Vogtle Units 3 & 4 Detailed Description & Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Evaluation of Proposed Changes, Revision to Units 3 & 4 COL Appendix C & Off-Site NL-16-0169, Enclosures 2 to 12: SNC Standard Emergency Plan (Marked-Up Pages), Farley Staffing - Detailed Description and Technical Evaluation (Marked-up Pages),Standard Emergency Plan Annex (Marked-up Pages), Farley Justification Matrix..2016-02-17017 February 2016 Enclosures 2 to 12: SNC Standard Emergency Plan (Marked-Up Pages), Farley Staffing - Detailed Description and Technical Evaluation (Marked-up Pages),Standard Emergency Plan Annex (Marked-up Pages), Farley Justification Matrix.. NL-16-0169, Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Encl2016-02-17017 February 2016 Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Enclos ML16060A3352016-02-17017 February 2016 Enclosures 10, 11, 12, 13 & 14: Vogtle (Units 1 & 2) Staffing - Detailed Description and Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Staffing-Detailed Description and Technical Evaluation and Standard Emergenc ML16060A3302016-02-17017 February 2016 Enclosures 13, 14, 15, 16, 17, 18, 19 Re Vogtle Units 3 & 4 Detailed Description & Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Evaluation of Proposed Changes, Revision to Units 3 & 4 COL Appendix C & Off-Site ML16060A3322016-02-17017 February 2016 Enclosure 20: SNC Standard Emergency Plan LAR - Updated Clean Version of Enclosures 1-19 ML16060A3362016-02-17017 February 2016 Enclosures 15, 16, 17, 18 & 19: Vogtle (Units 3 & 4) - Justification Matrix, Evaluation of Proposed Changes LAR for Revision for Emergency Planning ITAAC, Rev to Units 3 & 4 COL Appendix C - Proposed Changes, and Off-Site Response Organizat ML16060A3332016-02-17017 February 2016 Enclosure 6: Farley Justification Matrix ML16060A3282016-02-17017 February 2016 Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Enclos ML16060A3292016-02-17017 February 2016 Enclosures 2 to 12: SNC Standard Emergency Plan (Marked-Up Pages), Farley Staffing - Detailed Description and Technical Evaluation (Marked-up Pages),Standard Emergency Plan Annex (Marked-up Pages), Farley Justification Matrix.. NL-15-2262, Report of Changes to Emergency Plan2015-12-22022 December 2015 Report of Changes to Emergency Plan NL-15-1392, Enclosure 9 - Hatch Justification Matrix2015-08-31031 August 2015 Enclosure 9 - Hatch Justification Matrix ML15246A0562015-08-31031 August 2015 Enclosure 11 - Vogtle (Units 1 and 2) Standard Emergency Plan Annex ML15246A0552015-08-31031 August 2015 Enclosure 10 - Vogtle (Units 1 and 2) Staffing - Detailed Description and Technical Evaluation ML15246A0572015-08-31031 August 2015 Enclosure 12 - Vogtle (Units 1 and 2) Justification Matrix ML15246A0542015-08-31031 August 2015 Enclosure 9 - Hatch Justification Matrix ML15246A0532015-08-31031 August 2015 Enclosure 7 - Hatch Staffing - Detailed Description and Technical Evaluation & Enclosure 8 - Hatch Standard Emergency Plan Annex ML15246A0512015-08-31031 August 2015 Enclosure 6 - Farley Justification Matrix ML15246A0582015-08-31031 August 2015 Enclosure 13 - Vogtle (Units 3 and 4) Staffing - Detailed Description and Technical Evaluation NL-15-1392, Joseph M. Farley Nuclear Plant Units 1 and 2; Edwin I. Hatch Nuclear Plant Units 1 and 2; Vogtle Electric Generating Plant Units 1 and 2; Vogtle Electric Generating Plant Units 3 and 4 Standard Emergency Plan2015-08-31031 August 2015 Joseph M. Farley Nuclear Plant Units 1 and 2; Edwin I. Hatch Nuclear Plant Units 1 and 2; Vogtle Electric Generating Plant Units 1 and 2; Vogtle Electric Generating Plant Units 3 and 4 Standard Emergency Plan NL-15-1392, Enclosure 1 - Evaluation of the Proposed Changes - LAR for the Adoption of a Standard Emergency Plan for the SNC Fleet2015-08-31031 August 2015 Enclosure 1 - Evaluation of the Proposed Changes - LAR for the Adoption of a Standard Emergency Plan for the SNC Fleet NL-15-1392, Enclosure 2 - SNC Standard Emergency Plan2015-08-31031 August 2015 Enclosure 2 - SNC Standard Emergency Plan NL-15-1392, Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation2015-08-31031 August 2015 Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation NL-15-1392, Enclosure 4 - Farley Staffing - Detailed Description and Technical Evaluation & Enclosure 5 - Farley Standard Emergency Plan Annex2015-08-31031 August 2015 Enclosure 4 - Farley Staffing - Detailed Description and Technical Evaluation & Enclosure 5 - Farley Standard Emergency Plan Annex NL-15-1392, Enclosure 6 - Farley Justification Matrix2015-08-31031 August 2015 Enclosure 6 - Farley Justification Matrix NL-15-1392, Enclosure 7 - Hatch Staffing - Detailed Description and Technical Evaluation & Enclosure 8 - Hatch Standard Emergency Plan Annex2015-08-31031 August 2015 Enclosure 7 - Hatch Staffing - Detailed Description and Technical Evaluation & Enclosure 8 - Hatch Standard Emergency Plan Annex NL-15-1392, Enclosure 10 - Vogtle (Units 1 and 2) Staffing - Detailed Description and Technical Evaluation2015-08-31031 August 2015 Enclosure 10 - Vogtle (Units 1 and 2) Staffing - Detailed Description and Technical Evaluation NL-15-1392, Enclosure 11 - Vogtle (Units 1 and 2) Standard Emergency Plan Annex2015-08-31031 August 2015 Enclosure 11 - Vogtle (Units 1 and 2) Standard Emergency Plan Annex NL-15-1392, Enclosure 12 - Vogtle (Units 1 and 2) Justification Matrix2015-08-31031 August 2015 Enclosure 12 - Vogtle (Units 1 and 2) Justification Matrix 2024-06-04 Category:Letter type:NL MONTHYEARNL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024
[Table view]Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0199, Request for Specific Exemption2024-06-25025 June 2024 Request for Specific Exemption NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0620, ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use2023-08-0303 August 2023 ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 2024-09-09 |
Text
Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 tel
March 12, 2024
Docket Nos.: 50-321 NL-24-0062 50-366 72-36
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001
Edwin I. Hatch Nuclear Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis
Ladies and Gentlemen:
In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), Southern Nuclear Operating Company (SNC) hereby submits descriptions of changes to the emergency plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The emergency plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). A description of the changes and a summary of the 50.54(q) analysis is enclosed.
This letter contains no regulatory commitments. If you have any questions, please contact Ryan Joyce at (205) 992-6468.
Respectfully submitted,
Jamie M. Coleman Regulatory Affairs Director
JMC/agq/cbg
Enclosure:
Description of Emergency Plan Changes and Summary of 50.54(q) Analysis
cc: NRC Director, Division of Spent Fuel Management, NMSS NRC Regional Administrator, Region II NRC NRR Project Manager - Hatch NRC Senior Resident Inspector - Hatch Georgia - State Director of Environmental Protection Division SNC Records RTYPE: CHA02.004 Edwin I. Hatch Nuclear Plant Units 1 and 2
Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis
Enclosure to NL-24-0062
Description of Emergency Plan Changes and Summary of 50.54(q) Analysis Enclosure to NL-24-0062 SNC 50.54(q) Summary of Analysis
Description of Emergency Plan Changes and Summary of 50.54(q) Analysis
On February 15, 2024, Southern Nuclear Operating Company (SNC) implemented Version 8.0 of the SNC Standard Emergency Plan (EP) Annex for Hatch Nuclear Plant (HNP) Units 1 and 2.
The changes relocated the staff area and remaining equipment of the current Operations Support Center (OSC) to the Outage Control Center (OCC). The section and figure describing the OSC in the SNC Standard EP Annex for HNP were updated to reflect the relocation.
SNC has written a 50.54(q) evaluation for these changes and has concluded that the changes do not result in a reduction in effectiveness. The new OSC location meets all the building criteria for electrical, displays, personnel page announcements, storage areas, and meeting areas.
There are no changes to communication capabilities or response equipment.
These changes were evaluated in accordance with 10 CFR 50.54(q)(3), and SNC determined that the changes do not reduce the effectiveness of the SNC standard emergency plan and site-specific annexes. The SNC emergency plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b).
Page E-1