MONTHYEARNL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-23-0213, Inservice Inspection Program Owner'S Activity Report for Outage 1R312023-03-21021 March 2023 Inservice Inspection Program Owner'S Activity Report for Outage 1R31 NL-22-0756, Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02022-09-30030 September 2022 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-22-0552, Inservice Inspection Program Owner'S Activity Report for Outage 2R282022-07-28028 July 2022 Inservice Inspection Program Owner'S Activity Report for Outage 2R28 NL-22-0147, Updated Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2022-03-0707 March 2022 Updated Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements NL-21-0646, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302021-07-16016 July 2021 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-21-0061, Inservice Inspection Program Owner'S Activity Report for Outage 2R272021-02-12012 February 2021 Inservice Inspection Program Owner'S Activity Report for Outage 2R27 NL-20-0417, Refueling Outage 1R29 Steam Generator Tube Inspection Report2020-04-17017 April 2020 Refueling Outage 1R29 Steam Generator Tube Inspection Report NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-19-1296, Refueling Outage 2R26 Steam Generator Tube Inspection Report2019-10-24024 October 2019 Refueling Outage 2R26 Steam Generator Tube Inspection Report NL-19-0872, Inservice Inspection Program Owner'S Activity Report for Outage 2R262019-07-26026 July 2019 Inservice Inspection Program Owner'S Activity Report for Outage 2R26 NL-19-0347, Snubber Program Plan for the Fifth Ten Year Inservice Testing Interval2019-04-10010 April 2019 Snubber Program Plan for the Fifth Ten Year Inservice Testing Interval NL-17-2005, Fifth Ten-Year Interval Inservice Testing Program Update2019-03-11011 March 2019 Fifth Ten-Year Interval Inservice Testing Program Update NL-18-1041, Proposed Alternative for the Fifth Interval Inservice Inspection FNP-ISI-AL T-05-04, Version 1.02019-03-0808 March 2019 Proposed Alternative for the Fifth Interval Inservice Inspection FNP-ISI-AL T-05-04, Version 1.0 NL-18-1384, Fourth 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements2018-11-30030 November 2018 Fourth 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements NL-18-1000, Lnservice Inspection Program Owner'S Activity Report for Outage 1R282018-07-31031 July 2018 Lnservice Inspection Program Owner'S Activity Report for Outage 1R28 NL-18-0192, Submittal of Refueling Outage 2R25 Lnservice Inspection Report2018-02-12012 February 2018 Submittal of Refueling Outage 2R25 Lnservice Inspection Report ML17180A4392017-07-18018 July 2017 Inservice Testing Alternative for Pumps Per Code Case OMN-20 (RR-VR-01) NL-17-0167, Refueling Outage 1R27 Inservice Inspection Report2017-02-0606 February 2017 Refueling Outage 1R27 Inservice Inspection Report NL-17-0082, Submittal of the Lnservice Testing Program Alternatives for the Fifth Ten-Year Interval2017-02-0606 February 2017 Submittal of the Lnservice Testing Program Alternatives for the Fifth Ten-Year Interval NL-16-1277, 2R24 Lnservice Inspection Report Summary2016-08-0909 August 2016 2R24 Lnservice Inspection Report Summary NL-16-1329, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.02016-08-0404 August 2016 Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.0 NL-16-0723, Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 1.02016-06-30030 June 2016 Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 1.0 NL-15-2130, Responds to Request for Additional Information for Proposed Inservice Inspection Alternative FNP-ISI-ALT-18, Version 1.02015-11-25025 November 2015 Responds to Request for Additional Information for Proposed Inservice Inspection Alternative FNP-ISI-ALT-18, Version 1.0 NL-15-1483, Refueling Outage 1R26 Inservice Inspection Report2015-08-0404 August 2015 Refueling Outage 1R26 Inservice Inspection Report NL-15-0850, Refueling Outage 2R23 Steam Generator Tube Inspection Report2015-05-11011 May 2015 Refueling Outage 2R23 Steam Generator Tube Inspection Report NL-15-0718, Proposed Inservice Inspection Alternative FNP-ISI-ALT-17, Version 2.02015-04-21021 April 2015 Proposed Inservice Inspection Alternative FNP-ISI-ALT-17, Version 2.0 NL-15-0317, Refueling Outage 2R23 Inservice Inspection Report2015-02-16016 February 2015 Refueling Outage 2R23 Inservice Inspection Report NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code ML14148A4922014-05-28028 May 2014 ISI Program Alternative FNP-ISI-ALT-16. Version 1 NL-14-0295, Proposed Lnservice Inspection Alternative FNP-ISI-ALT-15, Version 1.02014-03-24024 March 2014 Proposed Lnservice Inspection Alternative FNP-ISI-ALT-15, Version 1.0 NL-14-0143, Refueling Outage 1R25 Lnservice Inspection Report2014-01-24024 January 2014 Refueling Outage 1R25 Lnservice Inspection Report NL-13-1729, Refueling Outage 2R22 Inservice Inspection Report2013-08-0707 August 2013 Refueling Outage 2R22 Inservice Inspection Report NL-12-2014, Proposed Inservice Inspection Alternative FNP-ISI-AL T-13 Version 1.02012-10-0101 October 2012 Proposed Inservice Inspection Alternative FNP-ISI-AL T-13 Version 1.0 NL-12-1499, Refueling Outage 1R24 Inservice Inspection Report2012-07-20020 July 2012 Refueling Outage 1R24 Inservice Inspection Report NL-12-0242, NL-12-0242 Part 2, Form NIS-2 Owner'S Report for Repair/Replacement Activity2012-02-0909 February 2012 NL-12-0242 Part 2, Form NIS-2 Owner'S Report for Repair/Replacement Activity NL-12-0242, Joseph M. Farley Nuclear Plant - Unit 2 Refueling Outage 2R21 Inservice Inspection Report2012-02-0909 February 2012 Joseph M. Farley Nuclear Plant - Unit 2 Refueling Outage 2R21 Inservice Inspection Report ML12045A0672012-02-0909 February 2012 Unit 2 Refueling Outage 2R21 Inservice Inspection Report NL-11-0255, Outage Inservice Inspection Summary Report2011-02-15015 February 2011 Outage Inservice Inspection Summary Report NL-10-2355, Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping FNP-ISI-AL T-12, Version 2.02011-01-0505 January 2011 Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping FNP-ISI-AL T-12, Version 2.0 NL-10-1514, 2R20 Inservice Inspection Report2010-08-11011 August 2010 2R20 Inservice Inspection Report NL-08-1007, Withdrawal of Proposed Alternative FNP-ISI-ALT-07-02 Continued Operation with Pinhole Leaks in Class 2 Valve Q2N11V003B2008-06-27027 June 2008 Withdrawal of Proposed Alternative FNP-ISI-ALT-07-02 Continued Operation with Pinhole Leaks in Class 2 Valve Q2N11V003B NL-08-0136, Inservice Inspection Summary Report2008-02-0606 February 2008 Inservice Inspection Summary Report NL-07-1560, Inservice Inspection Summary Report2007-08-14014 August 2007 Inservice Inspection Summary Report NL-07-1418, Fourth Ten-Year Interval Inservice Testing Program Update2007-08-14014 August 2007 Fourth Ten-Year Interval Inservice Testing Program Update 2024-09-04
[Table view] Category:Letter type:NL
MONTHYEARNL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0828, Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpolnt Drift2023-11-30030 November 2023 Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpolnt Drift NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application 2024-09-04
[Table view] |
Text
~ Southern Nuclear Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243
205 992 5000
February 16, 2024
Docket No.: 50-348 NL-24-0003
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001
Joseph M. Farley Nuclear Plant - Unit 1 lnservice Inspection Program Owner's Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31
Ladies and Gentlemen:
This letter supplements SNC letters NL-21-0646 (submitted July 16, 2021) and NL 0213 (submitted March 21, 2023). The attached information in Enclosure 1 supplements the information submitted as Table 1 for Unit 1 outages 1 R30 and 1 R31. Enclosure 2 contains the OAR-1 signature pages for the supplemental information.
This letter contains no NRC commitments. If you have any questions, please contact Ryan Joyce at 205.992.6468.
Respectfully submitted, 95~~
Jamie M. Coleman Director, Regulatory Affairs Southern Nuclear Operating Company
JMC/was/cbg
Enclosure 1: Owner's Activity Report (OAR) Table 1 Supplement Enclosure 2: Supplemental Form OAR-1 Owner's Activity Report Signature Pages
cc: Regional Administrator, Region II NRR Project Manager - Farley Nuclear Plant Senior Resident Inspector - Farley Nuclear Plant RTYPE: CFA04.054 Joseph M. Farley Nuclear Plant - Unit 1 lnservice Inspection Program Owner's Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31
Enclosure 1
Owner's Activity Report (OAR) Table 1 Supplement to NL-24-0003 Owner's Activity Report (OAR) Table 1 Supplement
Table 1 Supplement for Farley 1 R30 and 1 R31
Examination Item Description Evaluation Category and Item Description Number F-A A degraded pipe support, ALA2-CR 10781010 and WO F1.20B 4600-SI-R299, was noted on 16 " SNC1146984 document Chemical Volume Control System the engineering line, 16 " HCB-42. The evaluation. TE 1084317 floor/ground anchorage was found is tracking LT AM F degraded. 0018 to repair/replace pipe support ALA2-4600-SI-R299 to completion.
F-A A degraded pipe support, ALA2-CR 10781010 and WO F1.20E 4600-SI-R298, was noted on 16 " SNC1146984 document Chemical Volume Control System the engineering line, 16 " HCB-42. The evaluation. TE 1084317 floor/ground anchorage was found is tracking LT AM F degraded. 0018 to repair/replace pipe support ALA2-4600-SI-R298 to completion.
E1-1 Joseph M. Farley Nuclear Plant - Unit 1 lnservice Inspection Program Owner's Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31
Enclosure 2
Supplemental Form OAR-1 Owner's Activity Report Signature Pages to NL-24-0003 Supplemental Form OAR-1 Owner's Activity Report Signature Pages
FORM OAR-1 OWNER'S ACTIVITY REPORT
Report Number_~ _.1... - s.-.2.. - 2_,... u... n.... it.... 1,..,... s.... th........ lo.... te=rv"""""a...,1,... 2=-n_d.... P... e.... r""'io... d..,,.... 2.... n_d.... R..ae... o.,.o..,rt_.l ____________ _
Plant Joseph M. Farley Nuclear ___ P~la=n~t~--------------------
Un it No *---- ~ --- Commercial service (ii app licable) date December 01, 1977 Refueling outage no.~1.... R ___ 3~1~---
Current inspection interval __.,,5c..th ________________________________ _
(1st, 2nd, 3rd, 4th, other)
Current inspection period __ -=2~nd ________________________________ _
(1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans : The 2007 Edition through 2008 Addenda is a licable to the 5 th Ins ection Interval.
Date and revision of inspection plans : 5 th Inspection Interval Inspection Plans - Volume 1- 08/25/2022 {Version 6.0), Volume 3 - 04/07/2022 /Version 5.0), Volume 4 - 12/27/2022 /Version 4.0), and Volume 5 -
06/09/2022 /Version 4.0). 1 R31 Outage Plan - 05/19/2022 /Version 1.0) with 1 R31 Outage Plan Scope Change SC-001 - 9/19/2022 and 1 R31 Outage Plan Scope Change SC-002 - 10/26/2022
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans : Same
Code Cases used for inspection and evaluation: N-729-6, N-716-1, N-776, N-532-5, and N-805 (ii applicable. including cases modified by Case N-532 and tater revisions)
CERTIFICATE OF CONFORMANCE
I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1 R~31~------
conform lo the requirements of Section XI. (rerueling outage number)
Director Date
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT. have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~ -z/w/j}/
Jeffer Sn der Commission --c'1c:=2.,,8'""4,_.3'::""'-l <Nationa1 Board Number and Endorsement) -'-:-N:,.,'-'R'-c--,--::---:----,,------
Date
E2-1 to NL-24-0003 Supplemental Form OAR-1 Owner's Activity Report Signature Pages
FORM OAR-1 OWNER'S ACTIVITY REPORT
Report Number __..... 1--'-5""*=2'--1-'--'-(U=-'-'n "'""it--'1'"'"1 --=5'-th_ l"-n ;=.te=rv""'""'a ""'l,--=2"-n_d--'-p--=e"'"r""io"""d'-'-1_st___, R""'"e=p.,_ o=rt'"")..__ _____________ _
1 ---'
Plant _____ J=--o=s=e'""p"-h'"""M"""'". -'--F=a ~rl=e.,_y--'-N=u=c~le=a=r--'-P___, l=a ~nt~--------------------
Unit No* -------,~~--c,1 applic able ) Commercial service date December 01, 1977 Refueling outage no. ~ 1--'-R~3~0~---
Current inspection interval __.,.,5c..th ________________________________ _
(1st. 2nd. 3rd. 4th. other)
Current inspection period __ _._ n_ d ________________________________ _
(1st. 2nd. 3rd)
Edition and Addenda of Section XI applicable to the inspection plans : The 2007 Edition through 2008 Addenda is a pp!jcable to the 5th Inspection Interval
Date and revision of inspection plans : 5th Inspection Interval Inspection Plans - Volume 1-10/11/2020 (Version 5.0). Volume 3 - 3/17/2021 (Version 4.0). Volume 4 - 3/18/2021 (Version 3.0). and Volume 5 - 3/2/2021 (Version 3.0). 1 R30 Outage Plan - 3/18/2021 (Version 1.0) with 1 R30 Outage Plan Scope Change SC-001
- 4/8/2021 and 1R30 Outage Plan Scope Change SC-002 - 4/16/2021
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans : Same
Code Cases used for inspection and evaluation : N-716-1, N-722-1, N-776, N-513-4, N-532-5, N-648-2, and N-770-5 (d applicable, includ ing cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE
I certify that (a) the statements made in this report are correct; {b) the examinations and tests meet the Inspection Plan as requ ired by the ASME Code,Section XI ; and (c) the repair/replacement activities and evaluations supporting the completion of ___ --'-1 ~R=3~0~-----
conform to the requirements of Section XI. (refueling outa ge num b er)
Signed J. W. Carroll Director Date 2-113/2.i:>-i.'4,
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT. have inspected the items described in this Owner ' s Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind ar ising from or connected with this inspection.
Jeffery Snyder /)~ )____ ~- Commission _,1""2""8'"'4"""3'---'-1 _,_N-'--'-'R,..___ _________ _
Inspector's S~ ~ (National Board Number and Endorsement)
Date.,), IY.,_,;.
E2-2