Letter Sequence Response to RAI |
---|
EPID:L-2019-LLA-0212, Submittal of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage. (Approved, Closed) |
|
MONTHYEARML19275E3932019-09-30030 September 2019 Submittal of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage. Project stage: Request NL-19-0796, WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version)2019-09-30030 September 2019 WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version) Project stage: Request ML19280A0142019-10-16016 October 2019 Request for Withholding from Public Disclosure WCAP-18414-P - Spent Fuel Pool Criticality Safety Analysis Project stage: Other ML19302F6052019-10-29029 October 2019 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis Project stage: Acceptance Review ML20055E9752020-02-28028 February 2020 Request for Additional Information Update the Spent Fuel Pool Criticality Safety Analysis (EPID L-2019-LLA-0212) Non-Proprietary Version Project stage: RAI NL-20-0403, Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage2020-04-13013 April 2020 Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage Project stage: Response to RAI ML20125A2102020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power, Chapter 9, Auxiliary Systems, and Chapter 10, Steam and Power Conversion System Project stage: Request ML20115E6182020-05-0404 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis Project stage: Approval ML20280A6852020-10-26026 October 2020 Request for Withholding Information from Public Disclosure for Joseph M. Farley, Units 1 and 2 Project stage: Withholding Request Acceptance 2020-10-06
[Table View] |
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0213, Inservice Inspection Program Owner'S Activity Report for Outage 1R312023-03-21021 March 2023 Inservice Inspection Program Owner'S Activity Report for Outage 1R31 NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0080, Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02023-02-0202 February 2023 Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-23-0008, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting.2023-01-17017 January 2023 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting. NL-23-0011, Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only2023-01-0505 January 2023 Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, NL-22-0887, Cycle 32 Core Operating Limits Report2022-11-21021 November 2022 Cycle 32 Core Operating Limits Report NL-22-0884, Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-1012022-11-17017 November 2022 Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101 NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0756, Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02022-09-30030 September 2022 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0608, Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers2022-08-17017 August 2022 Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers NL-22-0552, Inservice Inspection Program Owner'S Activity Report for Outage 2R282022-07-28028 July 2022 Inservice Inspection Program Owner'S Activity Report for Outage 2R28 NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value NL-22-0361, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak.2022-06-20020 June 2022 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak. NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0388, Cycle 29 Core Operating Limits Report2022-05-31031 May 2022 Cycle 29 Core Operating Limits Report NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0340, Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical2022-05-10010 May 2022 Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations 2024-01-11
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARNL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0080, Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02023-02-0202 February 2023 Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-23-0008, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting.2023-01-17017 January 2023 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting. NL-22-0361, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak.2022-06-20020 June 2022 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak. NL-21-1060, Units 1 and 2, Response to Request for Additional Information Related to License Amendment Request to Allow Elimination of the Encapsulation Vessels Around the First Containment Spray (CS) and Residual Heat Removal .2021-12-13013 December 2021 Units 1 and 2, Response to Request for Additional Information Related to License Amendment Request to Allow Elimination of the Encapsulation Vessels Around the First Containment Spray (CS) and Residual Heat Removal . NL-21-0020, Final Supplemental Response to NRC Generic Letter 2004-022021-03-23023 March 2021 Final Supplemental Response to NRC Generic Letter 2004-02 NL-21-0019, Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-03-0202 March 2021 Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors NL-20-1273, Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for2020-11-20020 November 2020 Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for NL-20-0816, Response to Request for Clarification Regarding the Refueling Outage 1R29 Steam Generator Tube Inspection Report2020-07-17017 July 2020 Response to Request for Clarification Regarding the Refueling Outage 1R29 Steam Generator Tube Inspection Report NL-20-0636, Third Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2020-05-29029 May 2020 Third Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request NL-20-0550, Responses to NRC Requests for Additional Information License Amendment Request to Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint2020-05-20020 May 2020 Responses to NRC Requests for Additional Information License Amendment Request to Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint NL-20-0538, Second Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2020-05-0808 May 2020 Second Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate NL-20-0458, Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2020-04-22022 April 2020 Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate NL-20-0403, Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage2020-04-13013 April 2020 Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage NL-19-0676, Proposed Alternative FNP-ISI-ALT-05-04, Response to NRC Request for Additional Information2019-06-11011 June 2019 Proposed Alternative FNP-ISI-ALT-05-04, Response to NRC Request for Additional Information NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)2019-05-0303 May 2019 Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) NL-19-0343, Relief Request FNP-ISI-RR-03: SNC Response to NRC Request for Additional Information2019-04-23023 April 2019 Relief Request FNP-ISI-RR-03: SNC Response to NRC Request for Additional Information NL-19-0307, Response to NRC Request for Additional Information on Relief Request FNP-ISI-RR-022019-03-27027 March 2019 Response to NRC Request for Additional Information on Relief Request FNP-ISI-RR-02 NL-18-1514, Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift.2019-01-31031 January 2019 Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift. NL-17-2135, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program, Response to NRC Request for Additional Information2018-02-0909 February 2018 License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program, Response to NRC Request for Additional Information NL-17-2015, Response to NRC RAIs Regarding Decommissioning Funding Status Reports2018-01-22022 January 2018 Response to NRC RAIs Regarding Decommissioning Funding Status Reports NL-17-1443, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Final Response to NRC Requests for Additional Information2017-10-12012 October 2017 License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Final Response to NRC Requests for Additional Information NL-17-1367, Response to the Second Request for Additional Information Regarding Alternative Source Term License Amendment Request2017-09-0707 September 2017 Response to the Second Request for Additional Information Regarding Alternative Source Term License Amendment Request NL-17-0480, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Responses to NRC Requests for Additional Information2017-06-22022 June 2017 License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Responses to NRC Requests for Additional Information NL-17-1067, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request2017-06-0808 June 2017 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request NL-17-0643, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request2017-05-23023 May 2017 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request NL-17-0774, Response to Request for Information Regarding License Amendment Request to Revise the Actions of Technical Specification 3.8.9, Distribution Systems - Operating2017-05-15015 May 2017 Response to Request for Information Regarding License Amendment Request to Revise the Actions of Technical Specification 3.8.9, Distribution Systems - Operating NL-17-0613, Response to Request for Additional Information Regarding Alternative Request FNP-ISI-ALT-20, Version 1.0, Regarding System Leakage Test2017-04-13013 April 2017 Response to Request for Additional Information Regarding Alternative Request FNP-ISI-ALT-20, Version 1.0, Regarding System Leakage Test NL-17-0512, Response to Request for Additional Information Regarding Alternative Request RR-PR-03 Version 1.0 for the Lnservice Testing Program Fifth 1 0-Year Interval2017-03-28028 March 2017 Response to Request for Additional Information Regarding Alternative Request RR-PR-03 Version 1.0 for the Lnservice Testing Program Fifth 1 0-Year Interval NL-16-2513, Response to Follow-up Request for Information Regarding Reactor Pressure Vessel Threads-in-Flange Examination Requirement2016-11-23023 November 2016 Response to Follow-up Request for Information Regarding Reactor Pressure Vessel Threads-in-Flange Examination Requirement NL-16-1830, Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1B of 1C2016-11-0303 November 2016 Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1B of 1C NL-16-1830, Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1C of 1C2016-11-0303 November 2016 Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1C of 1C ML16314A5052016-11-0303 November 2016 Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1B of 1C ML16214A0252016-07-25025 July 2016 Units 1 and 2 - Response to Request for Additional Information for TSTF-312 NL-16-0784, Units 1 and 2 - Response to Request for Additional Information for TSTF-312. Enclosure 2 Excerpts from Calculation SM-96-1064-0012016-07-25025 July 2016 Units 1 and 2 - Response to Request for Additional Information for TSTF-312. Enclosure 2 Excerpts from Calculation SM-96-1064-001 NL-16-0870, Units 1 and 2 Supplement to Response to Request for Additional Information for TS 3.3.5 Loss of Power Diesel Generator Start Instrumentation LAR2016-06-30030 June 2016 Units 1 and 2 Supplement to Response to Request for Additional Information for TS 3.3.5 Loss of Power Diesel Generator Start Instrumentation LAR NL-16-0628, Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Cover Letter, Attachment 1 and Enclosures 1 - 102016-06-0909 June 2016 Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Cover Letter, Attachment 1 and Enclosures 1 - 10 NL-16-0739, Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan2016-05-26026 May 2016 Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan NL-16-0572, Response to Request for Additional Information Regarding TSTF-432-A, Revision 12016-04-13013 April 2016 Response to Request for Additional Information Regarding TSTF-432-A, Revision 1 NL-16-0415, Response to Request for Additional Information for TS 3.3.5 Loss of Power Diesel Generator Start Instrumentation LAR2016-04-11011 April 2016 Response to Request for Additional Information for TS 3.3.5 Loss of Power Diesel Generator Start Instrumentation LAR NL-16-0098, Response to Request for Additional Information for Adoption of Technical Specifications Task Force Traveler 3122016-03-0303 March 2016 Response to Request for Additional Information for Adoption of Technical Specifications Task Force Traveler 312 NL-16-0169, Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Encl2016-02-17017 February 2016 Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Enclos ML16060A3282016-02-17017 February 2016 Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Enclos NL-15-2222, Response to Request for Additional Information for RHR Autoclosure Interlock Function Elimination LAR2016-01-28028 January 2016 Response to Request for Additional Information for RHR Autoclosure Interlock Function Elimination LAR NL-16-0086, Units 1 and 2 - Response to Third Request for Additional Information Regarding SNC License Amendment Request for TSTF-523, Revision 22016-01-28028 January 2016 Units 1 and 2 - Response to Third Request for Additional Information Regarding SNC License Amendment Request for TSTF-523, Revision 2 NL-15-2062, Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 22015-11-25025 November 2015 Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 2 2023-08-23
[Table view] |
Text
3535 Colonnade Parkway Cheryl A. Gayheart Birmingham, AL 35243 Regulatory Affairs Director 205 992 5316 tel 205 992 7601 fax cagayhea@southernco.com contains Proprietary Information. When separated from Enclosure 1, this transmittal document and remaining enclosures are decontrolled.
April 13, 2020 10 CFR 50.90 Docket Nos.: 50-348 NL-20-0403 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding License Amendment Request (LAR) to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage Ladies and Gentlemen:
By letter dated September 30, 2019, Southern Nuclear Operating Company (SNC) submitted a license amendment request (LAR) to update the spent fuel pool criticality safety analysis and revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage for the Joseph M. Farley Nuclear Plant (FNP) Units 1 and 2 (ML19275E310).
By letter dated February 28, 2020 (ML20055E975), the U.S. Nuclear Regulatory Commission (NRC) staff notified SNC that additional information is needed for the staff to complete their review. provides a proprietary version of the SNC response to the NRC request for additional information (RAI). Enclosure 2 provides a non-proprietary version of the SNC response to the RAI. Enclosure 3 provides the Westinghouse Affidavit, CAW-20-5032, for Withholding Proprietary Information from Public Disclosure. The affidavit sets forth the basis upon which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations. Accordingly, it is respectfully requested that the information that is proprietary to Westinghouse be withheld from public disclosure.
Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-20-5032 and should be addressed to Camille T. Zozula, Manager, Regulatory Compliance & Corporate Licensing, Westinghouse Electric Company, 1000 Westinghouse Drive, Suite 165, Cranberry Township, Pennsylvania 16066.
This letter contains no NRC commitments.
U. S. Nuclear Regulatory Commission NL-20-0403 Page 2 In accordance with 10 CFR 50.91, SNC is notifying the state of Alabama of this license amendment RAI response by transmitting a copy of this letter to the designated state official.
If you have any questions, please contact Jamie Coleman at 205.992.6611.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on April 13, 2020.
C. A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company CAG/was/scm : SNC Response to Request for Additional Information (RAI) (Proprietary) : SNC Response to Request for Additional Information (RAI) (Non-Proprietary) : Westinghouse Affidavit, CAW-20-5032, for Withholding Proprietary Information from Public Disclosure cc: NRC Regional Administrator NRC NRR Project Manager - Farley 1&2 NRC Senior Resident Inspector - Farley 1 & 2 Alabama - State Health Officer for the Department of Public Health SNC Document Control R-Type: CFA04.054
Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage ENCLOSURE 2 SNC Response to Request for Additional Information (RAI)
(Non-Proprietary)
SNC Response to RAI (Non-Proprietary)
RAI No. 1 Proposed new TS 4.3.1.1.e states the following:
"New or partially spent fuel assemblies that must be stored according to their combination of discharge burnup and nominal enrichment, decay time since operation, required IFBA [integral fuel burnable absorber] (if applicable), and must comply with Figure 4.3-1, Table 4.3-1, and Tables 4.3-3 through 4.3-5 (as applicable). Each assembly should [emphasis added] be stored in an appropriate storage configuration according to its fuel category as specifically described in Table 4.3-1 and geometry based on Figure 4.3-1" Justify each situation that the term should could be used or revise the proposed TS accordingly, for example, use the term shall.
SNC Response:
Southern Nuclear agrees to substitute the word shall in place of the word should as described above. The proposed new TS 4.3.1.1.e would then read as follows:
"New or partially spent fuel assemblies that must be stored according to their combination of discharge burnup and nominal enrichment, decay time since operation, required Integral Fuel Burnable Absorber (IFBA) (if applicable), and must comply with Figure 4.3-1, Table 4.3-1, and Tables 4.3-3 through 4.3-5 (as applicable). Each assembly shall be stored in an appropriate storage configuration according to its fuel category as specifically described in Table 4.3-1 and geometry based on Figure 4.3-1" RAI No. 2 Proposed Note 3.c. for new TS Figure 4.3-1 states the following:
"For assemblies with Initial Enrichment (En) values greater than or equal to the values in Table 4.3-2, the required Minimum Burnup value (in MWd/MTU) for each Fuel Category is calculated based on initial enrichment, decay time, and the appropriate fitting coefficients.
This statement implies the analysis is acceptable for initial enrichments above 5.0 weight percent (wt/%) U-235. However, the licensee did not propose a change to its current TS 4.3.1.1.a, which limits its fuel to a maximum U-235 enrichment of 5.0 weight percent (wt/%).
Since TS 4.3.1.1.a is not being revised, the NRC staff considers U-235 enrichment above 5.0 wt/% out of scope of the license amendment request (LAR). Please confirm the applicability of Note 3.c. relative to TS 4.3.1.1.a.
SNC Response:
Southern Nuclear confirms that applicability of the analysis and LAR to U235 enrichments greater than 5.0 weight percent is out of scope.
RAI No. 3 It is not apparent what fuel assembly power history was used for the depletion analysis.
WCAP-18414-P, Section 4.2.2.4, Maximum Average Assembly Power, states ((
E2-1 SNC Response to RAI (Non-Proprietary)
)) However, the power history used in the analysis is not stated nor is the power history used in the analysis justified as it relates to Farley. With respect to the power history used in the analysis, please provide the following information:
- a. Clearly state the power histories used in the analysis and justify their use for Farley.
- b. Table 4.2 lists a (( )) What is the basis and justification for these values?
- c. Table 4.2 lists a (( )). In what respect are these values (( ))?
- d. Are (( )) and ((
)) referenced below Table 4-2 the same parameter?
- e. Use of the (( )) implies a non-bounding power history was used or may be acceptable. Considering the potential variations and timing of those variations in a fuel assemblys power history, justify the use of a non-bounding power history. Describe any limitations on the use of (( )) and how the licensee will control those limitations.
- f. Describe the effects of a non-bounding power history on Fuel Temperature and Operating History and Specific Power as described in WCAP-18414-P, Sections 4.2.2.2 and 4.2.2.3, respectively.
- g. If the power history is non-bounding, the Axial Moderator Temperature Profile Selection as described in WCAP-18414-P, Section 4.2.3.2, may be adversely affected. Justify the continued use of the selected Axial Moderator Temperature Profiles.
SNC Response:
Each spent fuel pool (SFP) Criticality Fuel Design from Table 3-3 (referenced in Table 4-2) of Reference 1 is analyzed using a bounding power history experienced by actual assemblies operated in Farley Units 1 and 2. The Criticality Fuel Designs were developed to bound previous operation and expected future operation at Farley. [
]a,c
E2-2 SNC Response to RAI (Non-Proprietary)
]a,c e.) The Burnup Averaged Assembly Power (Equation 4-2 of Reference 1) is not a design input used to develop the burnup limits in Reference 1, therefore its use will not be justified for this purpose. The design input values are the values for Burnup Averaged Assembly Thermal Power listed in Table 4-2, which are determined as bounding high thermal powers. See the response to (d) for more information.
f.) As discussed in the response to (e), assembly power histories modeled for each Criticality Fuel Design in Reference 1 (Table 4-2) are not considered non-bounding. The Burnup Averaged Assembly Thermal Power from Table 4-2 of Reference 1 used is bounding and was used to create the SFP depleted isotopics in Reference 1. Therefore, Operating History, Specific Power, and Fuel Temperature as described in Sections 4.2.2.2 and 4.2.2.3 of Reference 1 are conservatively included (or conservatively determined as in the case of Fuel Temperature).
g.) As discussed in the response to (e), assembly power histories modeled for each Criticality Fuel Design in Reference 1 (Table 3-3) are not considered non-bounding. The Burnup E2-3 SNC Response to RAI (Non-Proprietary)
Averaged Assembly Thermal Power from Table 4-2 of Reference 1 is bounding and was used to create the SFP depleted isotopics in Reference 1. The Axial Moderator Temperature Profile is conservatively chosen as described in Section 4.2.3.2 of Reference 1 and is not impacted.
References:
- 1. WCAP-18414-P, J. M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis, September 2019.
- 2. WCAP-9272-P, Westinghouse Reload Safety Evaluation Methodology July 1998.
- 3. NUREG/CR-6665, Review and Prioritization of Technical Issues Related to Burnup Credit for LWR Fuel, U.S. Nuclear Regulatory Commission, February 2000.
- 4. NEI-12-16, Revision 3, Guidance for Performing Criticality Analyses of Fuel Storage a Light Water Reactor Power Plants, March 2018.
RAI No. 4 Section 5.2.3.1.13 of WCAP-18414-NP, Eccentric Fuel Assembly Positioning Bias, states:
The fuel assemblies are assumed to be nominally located in the center of the storage rack cell; however, it is recognized that an assembly could in fact be located eccentrically within its storage cell.
With respect to the Eccentric Fuel Assembly Positioning Bias analysis, please provide the following information.
- a. Describe the models used.
- b. Justify the perturbed cases used.
- c. Compare the perturbed cases to nominal case.
SNC Response:
Model Description The combination of physical geometry represented explicitly by input, combined with boundary conditions, determine the actual modeled spent fuel pool (SFP) system. To clarify the eccentric positioning modeling for Arrays A, B, C and D, the explicitly represented geometry modeling specified by the input is given below for each storage array. Also given are the boundary conditions utilized for each storage array. [
]a,c E2-4 SNC Response to RAI (Non-Proprietary)
Array A:
[
]a,c a,c Figure 1: Array A Schematic of Eccentrically Placed Fuel (shown are the assemblies represented by fuel category, eccentrically placed close together)
Array B:
[
]a,c E2-5 SNC Response to RAI (Non-Proprietary) a,c Figure 2: Array B Schematic of Eccentrically Placed Fuel (shown are the assemblies represented by fuel category, eccentrically placed close together)
[
]a,c Array C:
[
]a,c E2-6 SNC Response to RAI (Non-Proprietary) a,c Figure 3: Array C Schematic of Eccentrically Placed Fuel (shown are the assemblies represented by fuel category, eccentrically placed close together)
[
]a,c Array D:
[
]a,c
[
]a,c a,c Figure 4: Array D Schematic of Eccentrically Placed Fuel (shown are the assemblies represented by fuel category, eccentrically placed close together)
E2-7 SNC Response to RAI (Non-Proprietary)
[
]a,c Justification of the Perturbed Cases Used
[
]a,c Array D is conservatively represented in full, as it is a single area in the spent fuel pool for storage of damaged fuel. All possible assemblies are eccentrically located. A buffer of empty cells is in place around all damaged fuel assemblies (and is part of the array).
Comparisons of the perturbed and nominal cases.
Table 1 contains the eccentric positioning results by array. Equation 5-2 from Reference 1 is used to determine the Delta Keff to the nominal, non-eccentrically located fuel model in Table 1 below. [
]a,c E2-8 SNC Response to RAI (Non-Proprietary)
Table 1: Eccentric Positioning Results by Array a,c E2-9 SNC Response to RAI (Non-Proprietary)
Table 1: Eccentric Positioning Results by Array (cont.)
a,c E2-10 SNC Response to RAI (Non-Proprietary)
Table 1: Eccentric Positioning Results by Array (cont.)
a,c
References:
- 1. WCAP-18414-P, J. M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis, September 2019.
- 2. NEI-12-16, Revision 3, Guidance for Performing Criticality Analyses of Fuel Storage at Light Water Reactor Power Plants, March 2018.
RAI No. 5 Section 5.2.3.1.14 of WCAP-18414-P, SFP [Spent Fuel Pool] Temperature Bias, discusses the determination of the most reactive temperature in the Farley SFP. With respect to the SFP Temperature Bias analysis, please provide the SFP keff at each temperature analyzed.
SNC Response:
Reference 1 (WCAP-18414-P), Section 5.2.3.1.14 details the calculation of Temperature Bias on a per-Array/Fuel Type/Enrichment basis. For each storage array (Arrays A through D), [
]a,c Data in Table 1 herein is taken from Reference 1 and the individual storage configuration analyses. Only the maximum reactivity delta is taken as the Temperature Bias and reported in Reference 1.
To reiterate, the Temperature Biases reported in Tables 5-4 through 5-10 of Reference 1 are for the individual fuel storage arrays. Considerations for normal condition and accident condition fuel temperatures are discussed in Sections 5.4 and 5.5.2.2 of Reference 1 respectively.
[
E2-11 SNC Response to RAI (Non-Proprietary)
]a,c Table 1: Temperature Bias Results per Array a,c E2-12 SNC Response to RAI (Non-Proprietary)
Table 1: Temperature Bias Results per Array (cont.)
a,c E2-13 SNC Response to RAI (Non-Proprietary)
Table 1: Temperature Bias Results per Array (cont.)
a,c E2-14 SNC Response to RAI (Non-Proprietary)
Table 1: Temperature Bias Results per Array (cont.)
a,c E2-15 SNC Response to RAI (Non-Proprietary)
Table 1: Temperature Bias Results per Array (cont.)
a,c E2-16 SNC Response to RAI (Non-Proprietary)
Table 2: Updated Table 5-6 from Reference 1 a,c E2-17 SNC Response to RAI (Non-Proprietary)
Table 3: Updated Table 5-7 from Reference 1 a,c E2-18 SNC Response to RAI (Non-Proprietary)
References:
- 1. WCAP-18414-P, J. M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis, September 2019.
RAI No. 6 Section 5.4.2 of WCAP-18414-P, Type 2 Normal Conditions, includes fuel rods with empty lattice locations. The section states:
((
))
With respect to fuel rods with empty lattice locations, please provide the following information.
- a. Will the fuel assemblies be considered as (( ))?
Justify the requirement.
- b. Can (( )) fuel assemblies with empty lattices be more reactive than
(( ))?
SNC Response:
Fuel Category 1 and Fuel Category 2 Designation Differences Fuel assemblies at Farley Units 1 and 2 with empty lattice locations (i.e., an assembly with a removed fuel rod that was not replaced creating a water filled lattice location) are able to be stored as either Fuel Category 1 or Fuel Category 2 as seen in Reference 1. However, the process for these missing-lattice-location (MLL) assemblies to be designated as Fuel Category 1 and Fuel Category 2 are different.
Fuel Category 1 Farley 1 and 2 MLL assemblies can be designated as Fuel Category 1 and stored in Reference 1 Array A without restriction. Table 1 below shows that Array A has more than 0.05600 k of reactivity margin to the regulatory limit (via Target keff comparison) for both OFA and STD fuel.
This margin was calculated by finding the difference between the Target keff from Tables 5-4 and 5-5 of Reference 1 and the nominal design basis assembly (DBA) reactivity in Array A plus twice the Monte Carlo calculational uncertainty of the nominal case.
Table 1: Reference 1 Array A Reactivity Margin to Regulatory Limit Fuel Type Target keff Array A Nominal keff 2* Array A Margin (k)
STD 0.98715 0.91838 0.00020 0.06857 OFA 0.98591 0.92875 0.00022 0.05694 Previously, Westinghouse has [
E2-19 SNC Response to RAI (Non-Proprietary)
]a,c Regardless of the number of missing fuel rods considered, Table 1 shows the conservative calculation methods employed provide sufficient margin to store MLL assembles as Fuel Category 1 in Array A of Reference 1 without additional consideration.
Fuel Category 2 It is possible for Farley Unit 1 and 2 MLL assemblies to be stored as Fuel Category 2 in Array B of Reference 1. However, a specific analysis is required to ensure the incident assembly is less reactive than the Reference 1 fresh design basis assembly (DBA) modeled in Array B. All fuel assemblies that are to be stored as Fuel Category 2 and contain less than 264 fuel rods will be analyzed to confirm that storage in Array B is acceptable. The confirmatory evaluation will be performed using the following equation for Array B Fuel Category 2 storage acceptability.
[
]a,c Conclusions
- 1. Reference 1 states that if a fuel rod(s) is removed from a Farley assembly and a stainless steel or naturally enriched uranium replacement fuel rod is inserted in its place, the incident assembly can be stored as normal; following the SFP burnup vs. enrichment storage requirements. The minimum IFBA requirements for the Fuel Category 2 assembly in Array B must still be followed.
E2-20 SNC Response to RAI (Non-Proprietary)
- 2. If a fuel rod(s) is removed and not replaced, the incident assembly may be stored as a Fuel Category 1 assembly in Array A.
- 3. If a fuel rod(s) is removed and not replaced, the assembly may also be analyzed using the methods described herein and in Reference 1, to determine if the incident assembly meets the requirements of Fuel Category 2 in Array B.
Reactivity of Assemblies with Missing Lattice Locations Fuel assemblies with empty lattice locations can indeed be more reactive in SFP scenarios than their identical assemblies with all fuel rod locations intact. The amount that reactivity will increase, if any depends on factors such as number of missing rods, incident assembly burnup, and SFP boron concentration. However realistic SFP conditions lessen the reactivity effect of missing fuel rods.
Westinghouse fuel assembly studies have shown that [
]a,c For Farley 1 and 2, sufficient margin exists to store assemblies with any number of missing fuel rod locations as Fuel category 1. For Fuel Category 2, the reactivity of an assembly with missing fuel rod locations must be evaluated using the methods detailed herein.
References:
- 1. WCAP-18414-P, J. M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis, September 2019.
RAI No. 7 Section 5.6 of WCAP-18414-P, Rodded Operation, references NUREG/CR-6759, Parametric Study of the Effect of Control Rods for PWR [Pressurized Water Reactor] Burnup Credit, (ADAMS Accession No. ML020810111). WCAP-18414-NP states in part:
Any assemblies incurring significant rodded operation going forward must not credit the rodded burnup.
And also states, Any impact from short term operation at reduced power levels with rods inserted will be negligible.
The significance and negligibility of a reactivity impact needs to be judged against the margin in the analysis. The Recommendations section in NUREG/CR-6759 states, in part:
E2-21 SNC Response to RAI (Non-Proprietary)
Consequently, it is concluded that, based on the assumption that U.S. PWRs do not use CRs [Control Rods] to a significant extent (i.e., CRs are not inserted deeper than the top ~20 cm of the active fuel and CRs are not inserted for extended burnups), the effect of CRs on discharge reactivity is relatively small (less than 0.2% k).
While 0.2% k may be thought of as relatively small, it would be a large portion of the Administrative Margin in the licensees analysis. Please provide the following information:
- a. What the licensee considers significant/non-negligible rodded operation.
- b. How the licensee will identify and control any fuel assembly that experiences significant/non-negligible rodded operation.
SNC Response:
Significant/non-negligible rodded operation Reference 1 seeks to support fuel storage for a historical baseload power operational approach and does not intend to cover Flexible Power Operations (FPO) scenarios. Significant/non-negligible rodded operation is defined as [
]a,c Identification and Control of any fuel assembly that experiences significant/non-negligible rodded operation Rodded burnup in assemblies under rodded locations for any [
]a,c The final burnup of these assemblies will be adjusted to reflect this impact with regards to spent fuel pool storage.
References:
- 1. WCAP-18414-P, J. M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis, September 2019.
RAI No. 8 Section 6.2 of WCAP-18414-NP, Analysis Area of Applicability
- a. States in part, This section details the area of applicability of the analysis concerning assembly characteristics and associated fuel management, including a summary of the data which needs to be confirmed to assure that the results presented here remain valid.
With respect to the area of applicability, please explain how the licensee will verify that the area of applicability is met for all fuel assemblies.
- b. WCAP-18414-P states, in part, E2-22 SNC Response to RAI (Non-Proprietary)
((
))
Please provide the methodology that will be used.
SNC Response:
A.) Reference 1 (WCAP-18414-P), Section 6.2, Table 6-15 lists the spent fuel pool (SFP) area of applicability (AOA) for Farley Units 1 and 2. Confirmation of the fuel assembly mechanical parameters and core operational data via the requirements of Table 6-15 of Reference 1 guarantees assemblies are bounded by the design basis assembly. Without significant changes to the fuel mechanical design or licensing basis of the plant itself, these parameters will remain conservative for the criticality analysis. Any change to the licensing basis will be captured as part of the Reload Safety and Licensing Checklist and evaluated on a cycle-specific basis, as described in Reference 2.
Reference 1 can be consulted with regard to the analysis of record for Max. Cycle Average Soluble Boron concentration and its determination, as well as the bounding Relative Burnup Profile, with cycle-specific checks developed in the reload analysis following the guidance of Reference 2. Rodded operation is described in the response to RAI #7.
All previously operated and discharged assemblies at Farley Units 1 (through the end of Operating Cycle 29) and 2 (through the end of Operating Cycle 26) have been explicitly considered within Reference 1. No further action is needed on the part of the licensee to ensure past assemblies meet the Reference 1, Table 6-15 requirements. Adhering to applicable burnup vs. enrichment storage requirements is all that is necessary for these previously operated and discharged assemblies currently in the SFP and/or explicitly modeled in Reference 1.
B.) The methodology used to [
]a,c require the SFP analysis of record (Reference 1 as-submitted) to be revised.
Test fuel assemblies or single-use fuel assemblies [
]a,c
[
E2-23 SNC Response to RAI (Non-Proprietary)
]a,c
References:
- 1. WCAP-18414-P, J. M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis, September 2019.
- 2. WCAP-9272-P-A, Westinghouse Reload Safety Evaluation Methodology, July 1985.
E2-24
Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage ENCLOSURE 3 Westinghouse Affidavit, CAW-20-5032, for Withholding Proprietary Information from Public Disclosure
Westinghouse Non-Proprietary Class 3 CAW-20-5032 Page 1 of 3 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
COUNTY OF BUTLER:
(1) I, Zachary S. Harper, have been specifically delegated and authorized to apply for withholding and execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse).
(2) I am requesting the proprietary portions of NL-20-0403 be withheld from public disclosure under 10 CFR 2.390.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged, or as confidential commercial or financial information.
(4) Pursuant to 10 CFR 2.390, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse and is not customarily disclosed to the public.
(ii) Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses.
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
E3-1
Westinghouse Non-Proprietary Class 3 CAW-20-5032 Page 2 of 3 AFFIDAVIT (5) Westinghouse has policies in place to identify proprietary information. Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage (e.g., by optimization or improved marketability).
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
(6) The attached documents are bracketed and marked to indicate the bases for withholding. The justification for withholding is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These E3-2
Westinghou~ Non-Proprietary Class 3 CAW-20-5032 Page 3 of 3 AFFIDAVIT lower case letters refer to the types of infom1ation Westinghouse customarily holds in confidence identified in Sections (5)(a) through (f) of this Affidavit.
I declare that the avem1ents of fact set forth in this Affidavit are true and correct to the best of my knowledge, infom1ation and belief.
- s:::;;
I declare under pcnalt) of perjury that the foregoing is true and correct.
Executed on '1/9/i-~ 'zach:; Manager Licensing Engineering E3-3