ML20125A210
From kanterella
Jump to navigation
Jump to search
Letter Sequence Request | |
---|---|
EPID:L-2019-LLA-0212, Submittal of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage. (Approved, Closed) | |
Initiation Administration | |
MONTHYEARML19275E3932019-09-30030 September 2019
[Table View]Submittal of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage and TS 4.3 Fuel Storage. Project stage: Request NL-19-0796, WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version)2019-09-30030 September 2019 WCAP-18414-NP, Rev 0, J.M. Farley Units 1 and 2 Spent Fuel Pool Criticality Safety Analysis (Non-Proprietary Version) Project stage: Request ML19280A0142019-10-16016 October 2019 Request for Withholding from Public Disclosure WCAP-18414-P - Spent Fuel Pool Criticality Safety Analysis Project stage: Other ML19302F6052019-10-29029 October 2019 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis Project stage: Acceptance Review ML20055E9752020-02-28028 February 2020 Request for Additional Information Update the Spent Fuel Pool Criticality Safety Analysis (EPID L-2019-LLA-0212) Non-Proprietary Version Project stage: RAI NL-20-0403, Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage2020-04-13013 April 2020 Response to Request for Additional Information Regarding License Amendment Request to Update the Spent Fuel Pool Criticality Safety Analysis and Revise Technical Specification (TS) 3.7.15 Spent Fuel Assembly Storage Project stage: Response to RAI ML20125A2102020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power, Chapter 9, Auxiliary Systems, and Chapter 10, Steam and Power Conversion System Project stage: Request ML20115E6182020-05-0404 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis Project stage: Approval ML20280A6852020-10-26026 October 2020 Request for Withholding Information from Public Disclosure for Joseph M. Farley, Units 1 and 2 Project stage: Withholding Request Acceptance 2020-10-06 |
ML20125A210 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 04/28/2020 |
From: | Southern Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20125A201 | List: |
References | |
NL-20-0442 | |
Download: ML20125A210 (776) | |
Similar Documents at Farley | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23319A0682023-10-31031 October 2023
[Table view]1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23318A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, ML23319A0622023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Effective Page Listing ML23319A0752023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23319A0712023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML23319A0782023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23319A0832023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23319A0822023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23319A0792023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML23319A0692023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML23319A0652023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23319A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected System ML23319A0772023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23319A0802023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23319A0642023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML23319A0662023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23319A0842023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 18, License Renewal - Aging Management Programs and Activities ML23319A0732023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23319A0762023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23319A0632023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant NL-21-0912, 0 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features2021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML21313A3382021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML21313A3372021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML21313A3362021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML21313A3212021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Effective Page Listing, Table of Contents ML21313A3392021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, ML21313A3352021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Redacted) ML21313A3332021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML21313A3322021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML21313A3312021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML21313A3302021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML21313A3282021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected System ML21313A3262021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21313A3252021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML21313A3242021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML21313A3232021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21313A3222021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant (Redacted) ML21313A3172021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 18, License Renewal - Aging Management Programs and Activities ML21313A3202021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML21313A3182021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20132A2072020-05-0808 May 2020 9 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant and Chapter 2 (Part 1 of 3); Redacted Version ML20125A2102020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power, Chapter 9, Auxiliary Systems, and Chapter 10, Steam and Power Conversion System ML20125A2042020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 2, Geography and Demography - Part 2 of 3 ML20125A2082020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 4 ,Reactor, and Chapter 5, Reactor Coolant System and Connected System ML20125A2092020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, and Chapter 7, Instrumentation and Control ML20125A2052020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 2, Geography and Demography - Part 3 of 3 ML20125A2062020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems - Part 1 of 2 ML20125A2072020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems - Part 2 of 2 ML20125A2022020-04-28028 April 2020 9 to the Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary ML18331A1232018-10-30030 October 2018 UFSAR Rev, 28, Chapter 1 and 2 Redacted Version 2023-10-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20125A210&oldid=4281164"