ND-18-0443, Response to Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations
ML18103A214
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/13/2018
From: Yox M
Southern Nuclear Company
To:
Document Control Desk, Office of New Reactors
References
ND-18-0443, RIS-2018-02
Download: ML18103A214 (5)


Text

^ Southern Nuclear Michael J. Yox Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tei 410-474-8587 ceii myox@southernco. com April 13, 2018 Docket Nos.: 52-025 ND-18-0443 52-026 U. S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, D. C. 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Response to Regulatory Issue Summary 2018-02:

Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:

On March 26, 2018, the NRC transmitted Regulatory Issue Summary (RIS) 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," to licensees. RIS 2018-02 requests that addressees voluntarily submit estimates regarding operator licensing examinations. In the enclosure to this letter. Southern Nuclear Operating Company (SNC) provides the requested information on NRC Form 536 for Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

The provided estimates are not commitments and may change. This letter contains no regulatory commitments.

Should you have any questions, please contact Michael McCue at mlmccue@southernco.com or (706) 848-6984.

Respectfully submitted.

Michael J. Yox MJY/LRG/amm

Enclosure:

NRC Form 536 Operator Licensing Examination Data for VEGP Units 3&4

U. S. Nuclear Regulatory Commission ND-18-0443 Page 2 of 3 cc; Southern Nuclear Operating Company / Georgia Power Company Mr. 8. E. Kuczynski (w/o enclosure)

Mr. M. D. Rauckhorst Mr. D. G. Boat (w/o enclosure)

Mr. M. D. Meier (w/o enclosure)

Mr. D. H. Jones (w/o enclosure)

Mr. D. L. McKinney (w/o enclosure)

Mr. T.W. Yelverton (w/o enclosure)

Mr. B. H. Whitley Mr. C. R. Pierce Ms. A. G. Aughtman Mr. W. A. Sparkman Ms. A. C. Chamberlain Mr. O. J. Miller Mr. J. B. Klecha Mr. M. J. Vox Ms. A. Pugh Ms. K. A. Roberts Ms. K. M. Stacy Mr. M. L. McCue Mr. M. K. Washington Mr. W. T. Forehand Ms. A. A. Gibson Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Reoulatorv Commission Mr. W. Jones (w/o enclosure)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. T. C. Brimfield Mr. A. J. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. C.D. Taylor Mr. T. McGinty Mr. F. D. Brown Ms. A. E. Rivera-Varona Ms. C. D. Taylor

U. S. Nuclear Regulatory Commission ND-18-0443 Page 3 of 3 Oalethorpe Power Corporation Mr. M. W. Price (w/o enclosure)

Mr. R.B. Brinkman (w/o enclosure)

Municipal Electric Authority of Georgia Mr. J. E. Fuller (w/o enclosure)

Mr. S. M. Jackson (w/o enclosure)

Dalton Utilities Mr. D. Cope (w/o enclosure)

Westlnahouse Electric Company. LLC Dr. L. OrlanI (w/o enclosure)

Mr. D. C. Durham (w/o enclosure)

Ms. L. G. liter Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Mr. M. M. Corlettl Other Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc. (w/o enclosure)

Mr. S. Roetger, Georgia Public Service Commission (w/o enclosure)

Ms. 8. W. Kernlzan, Georgia Public Service Commission (w/o enclosure)

Mr. K. C. Greene, Troutman Sanders (w/o enclosure)

Mr. S. Blanton, Balch BIngham

Southern Nuclear Operating Company Vogtle Electric Generating Plant (VEGP) Units 3 and 4 ND-18-0443 Enciosure NRG Form 536 Operator Licensing Examination Data for VEGP Units 3&4 (This Enciosure consists of 2 pages, including this cover page)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB; NO.31S0-0131 EXPIRES: 11/30/2020 (11-2017)

Estimated bimlen perresponsetocomply withthisvoluntatyinfoimationcolleclion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information coDection is used to plan budgets and resources for operator examlnatkins. Send comments regarding burden estimate to the Intbrmation Services Branch (7-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commissldn, Washington. 0020555-0001, or by e^nailto lnfbcollects.Resource@nrc.gov, andto the DeskOfficer, Office ofInformation and Regulatory Affairs, NEOB-10202, (31504131), Office of Management and Budget, Washington, DC 20503. if a means used to impose an information collection does notdisplay a currently valid OMB control number, the NRC maynotconduct orsponsor, and aperson is not requii^ to respond to, the information collection.

FACIUTY NRC REGION Vogtle Electric Generating Plant Units 3&4 II 7825 River Road Waynesboro, GA 30830 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 GY2023 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMI NATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR 14 0 9 0 OPERATORS NUMBER OF SENIOR REACTOR 8 0 4 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 03/16/2020 03/21/2022 ALTERNATE DATE 03/02/2020 03/14/2022 NRC FORM 536 (11-2017)