Response to Regulatory Issue Summary 2021-01: Preparation and Scheduling of Operator Licensing Examinations
ML21113A306
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 04/23/2021
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-21 -0401, RIS-2021-01
Download: ML21113A306 (10)


Text

A Southern Nuclear Choryf A. G11yho11rt Regulgtory Aff!liri Dir etor 353!1 CoiOflfltld@ Jal!lrkw!ly Blrmiflghom, AL 31)243 20!1992 !1316 April 23, 2021 Docket Nos.: 50-321 50-348 50-424 52-025 NL-21 -0401 50-366 50-364 50-425 52-026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 & 2 Edwin I. Hatch Nuclear Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 3 & 4 SNC Response to Regulatory Issue Summary 2021-01 :

Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:

On March 24, 2021, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2021 -01, "Preparation and Scheduling of Operator Licensing Examinations."

RIS 2021 -01 requests that licensees voluntarily submit projections of their site-specific operator licensing examination schedules as well as the estimated number of applicants planning to take operator licensing and generic fundamental examinations for years 2023-2026 .

Southern Nuclear Operating Company (SNC) hereby provides as enclosures to this letter the requested information on NRC form 536 for Joseph M. Farley Nuclear Plant- Units 1 & 2, Edwin I. Hatch Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2, and Vogtle Electric Generating Plant- Units 3 & 4. The estimates provided represent SNC's current understanding but are subject to possible change in the future. These enclosures supersede previous, similar RIS responses.

This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205.992.6611.

CAG/kgl/cg

U. S. Nuclear Regulatory Commission NL-21-0401 Page 2

Enclosures:

1. NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant - Units 1 & 2
2. NRC Form 536 , Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant - Units 1 & 2
3. NRC Form 536 , Operator Licensing Examination Data for Vogtle Electric Generating Plant - Units 1 & 2
4. NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant - Units 3 & 4 cc: Regional Administrator, Region II NRR Project Manager - Farley, Hatch, Vogtle 1 & 2, Vogtle 3 & 4 Senior Resident Inspector - Farley, Hatch, Vogtle 1 & 2, Vogtle 3 & 4 RType: CGA02.001 Vogtle 3 & 4 RType: VND.LI.LOO File AR.01 .02 .06

Joseph M . Farley Nuclear Plant - Units 1 & 2 Edwin I. Hatch Nuclear Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 3 & 4 SNC Response to Regulatory Issue Summary 2020-01:

Preparation and Scheduling of Operator Licensing Examinations Enclosure 1 NRC Form 536, Operator Licensing Examination Data fot Joseph M. Farley Nuclear Plant - Units 1 & 2

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2024 (01,~021) a>>*-~.. f;l!imll!&d byf~fln Pffl' rnPOAM! fQ c<<nply wJ#l lllt~lll!lunta,y 11\(Qf~ Cl!I~ f@RU!l!it 45 fllin~,

!¥.i

\~ ...... j

~

. OPERATOR LICENSING EXAMINATION DATA TIii§ lnflKffi!llion *won ii UM!d to P@II bll!!\lt !i 1!rnl re§Ollm!~ tor OP!lr~ wrnlnlltto!l§, s,rn1

,ommmt; r09111flll!l b\lfd@n ~ m!!!o IO tllv F()f/1, 1.ibril!Y, !llld lnt!!1llllllion CoilmoM llr~mm (T,6 AH!M), U.li, N!ic!w R9\IY@!O,Y CommiHi!lll, W;!ffinp10n, 00 20555-0001, Qr by t,m;,il 19 lntocolem,Rfl§OYrcoflln1'.QOV, 011111110 0MB rr,mw@r 111; OM!! om~ of lntorm,U!!rl an~ Rffll!llptgry Alfl!lf§, (31~0,0131), M1.rr. Om;k 0""1 ror !!loN!iel§i'f f!c9ul~!01Y Commliiion, n, 17111 Si ~ NW, Wi!!!hingl!ln, 00 W503: !J,J!Jl!U: O'i,j_~li~n@om~. Th@ NRC l!!llY nol oorniuot or I POn~or, @ nd ~ J)ff'ln ii not re1wirod tg rnpgnd I!!, ~ g}ffffe!ion of illwrm~lion unl!lM Ill@ dooum!lllt fel!Y!!li~~ or r unu lllQqCllfoeliondi§pfm ~ wrren!!Y *llli~OMii wn~o! num!l!lr, FACILITY NRCREGION Joseph M. Farley Nuclear Plants - Units 1 and 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2023 CY 2024 CY 2025 CY2026 f!STIMATIW NUMBER Of' LICENSEE-PR!;PARED 1 0 I 0 EXAMINATIONS

~STIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2023 CY2024 CY2025 CY2026 PROPOSED NUMBER NUMBER OF REACTOR OPE;RATORS t! 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT ti 0 6 0 NUMBER OF Sl;NIOR Rf!ACTOR OPERATORS-UPGRADE 4 0 4 0 NUMBl;R OF SENIOR Rl;ACTOR OPERATORS

  • LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 0412412023 NIA 04128/2025 NIA ALTERNATE DATE 05/22/2023 NIA 05/26/2025 NIA

~

NRC FORM 536 (01 -2021}

Joseph M. Farley Nuclear Plant - Units 1 & 2 Edwin I. Hatch Nuclear Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 3 & 4 SNC Response to Regulatory Issue Summary 2021-01 :

Preparation and Scheduling of Operator Licensing Examinations Enclosure 2 NRC Form 536, Operator Licensing Examination Data for !=dwin I. Hatch Nuclear Plant - Units 1 & 2

NRC FORM538 U.S. NUCLEAR REQULATORV COMMl8810N APPROVED DV 0MB: NO. 3150*0131 l!XPIRIUI: 01/31i2024 (OH021) l!~lilll!ttfid llurdan Jlijf f§§l)Ofl§§ lo comply with thl volunl/ity llifOffflfiijQfi ooll@CiliON f@qLl§§I; 4S 111/il(Jffi§

_.v~ijMk(

p~ *~~~ Thi§ lliformalion collootion i§ Ysijd to plM bud(l@I§ §lld f§§OUf!l1l§ f;;r op@riilm iiXijfilimltion§ !l@nd OPERATOR LICENSING ~omm@nl§ r~gardif1/l burdon @§cim@I@ IO th@ P'OIA, Librmy, HHd lnformafion Coll§ofione l'lranoh (H IA*

~

~~

~i, e-

~

VI~

EXAMINATION OATA A10M), Uti. Nuol@fif Riigulfiillfy Commis§IOfi, Wfl§hirl!)llln, tlC 2mti4l00 I, Of iJy ii4115il to lnfoogU§Ol§,R@§OYm~@nrn,gov, and th@ OMi! fllvitiWfff lit OMil Oif'lil§ of lfi@fljjijljgfl ~fld ~Ylij(flfY Affmr@, (3Hi04)131), All/1: DMk OffiCiif for ln@ Nllolear R@!lul~tary eommiseion, WMhlng!Qn, DC 20503; @amHil: oira submission@omb.eop.gov, Th@ NI"<<: Illa)' ntll ~und1J6t or m mn tllf@@f NW,

§J)M§Of, §llH § Jlijr§Oft iii not r@quir@d Ill felll'J(lftd (lj, § OOll!i~lion gf iNfOflflHiiOft Ufii§§§ th§ d@tUfiiefit requellong or reqwfing th@ aolleelkm di§play§ ~ c<<l'filntly velid OM!! oonrrnl numlfflr.

FACILITY NRCREGIOt-1 IEdwin I. Hatch Nuclear Plants- Units 1&2 II I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2025 PROPOSED NUMBER ESTIMATED NUMBER OF CY2023 CY 2024 CY 2026 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC=PR!::PARED 0 0 0 0 XAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2023 CY 2024 CY 2025 CY 2026

~

NUMB R OF REACiOR OPERATORS 7 0 7 0 NUMBERO SENIOR R ACTOR OPERATORS= INSTANT 7 0 7 0 NUMBER Ofa SENIOR REACTOR ,.,

OPERATORS - UPGRADE

.) 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS

  • LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1112712023 NIA 1210112025 NIA AI.TERNAT DATE 1210412023 NIA 1210812025 NIA

Joseph M. Farley Nuclear Plant- Units 1 & 2 Edwin I. Hatch Nuclear Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 3 & 4 SNC Response to Regulatory Issue Summary 2021-01:

Preparation and Scheduling of Operator Licensing Examinations Enclosure 3 NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant - Units 1 & 2

NRC FORM538 U. S. NUCLEAR REGULATORY COMMISSION APPROVED llJV OMS: NO. 3110*0131 l?XPIRH: 01/31/2024 (014021) gsUmst#d IJl,rd!in Jl§r r@§IJ(lft§@ to comply With !Iii§ volunfaf\l lttfmmatum ooil§,U!ill ,eqUe§l; 4& m1Mtas.

Ji#"ftMy1.,. Thi§ iflfOFmaUOft toll§l!flOft is U§§d io plail budg§!§ ffljfl f§§(iUFilfi§ for ap@rafilr ~ilffil~!iYilfi§ nnd I . .\ OPERATOR LICENSING oemm@m§ rn~ardm; llYrden @§tirMt# w!lie FOIA, Librmy, Md Information Celleolitm§ t'!rnneh (H a .i A10Mj, Uii Nuol§§f Regulatory Com1tti§§iOft, Wa§hill!JUlft, [)() 201iiifi,0001 , OF by (jaffl§II to

\...

    • ~ 4'! -e"

/ - EXAMINATION DATA lnfoooH@iits,R@§!iUrae@nre,gil\l, Md Iii@ OMii M'illWef ill: OM!! Offiee of lftfQFlflau§fl Hftd !'Wgullltmy Aff~if§, (3150,0131), Atl/1: 0Mk OffiCUlf for !l'i@ Nugl@lif R§{IIJl§Wty Commi§§!Ofi. m 17111 !lite§! NW.

Wnsnmgton, DC 20!03: e,11@1' oira submission.@omb.eop.gov, The flRC ffi!IY ttfil cundtiiJI or

§jfflM§Uf, ilflH Ii Jl@fOOM I§ ml! fequir@d lo f§§iJC}flO Iii, H oolle~tion of infeffftflijfljj Ynle§§ Ille UIJ§Ylflefil requ@§tittg er reqwMnu lh@ ooll@etlcin di§f)lays ;; eurr~ntly valid 0MB centtol numlitlr.

FACILITY J~RC REGION . -

VOGTLE ELECTRIC GENERATION PLANT - UNITS 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY CY 24 CY 25 CY 26 23 ESTIMATED NUMBER OF LICENSEE*PREPAR D 1 1 0 1 EXAMINATIONS ESTIMATED NUMl:lER OF NRC*PREPAReD 0 0 0 0 XAMINATIONS

e. INITIAL OPERATOR LICENSE EXAMINATIONS CY PROPOSED NUMBER CY 23 CY

- 24

- 25 CY

- 26 NUMBER OF REACTOR 8 6 0 6 OPERATORS NUMB R OF S NIOR REACTOR OPERATORS - INSTANT 6 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 0 2

)

NUMBER OF SENIOR REACTOR OPERATORS

  • LIMIT D 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/24/2023 10/2112024 NIA 0511112026 ALTERNATE DAT 0512212023 11/1812024 NIA 0610812026

Joseph M. Farley Nuclear Plant- Units 1 & 2 Edwin I. Hatch Nuclear Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 1 & 2 Vogtle Electric Generating Plant - Units 3 & 4 SNC Response to Regulatory Issue Summary 2021-01 :

Preparation and Scheduling of Operator Licensing Examinations Enclosure 4 NRC Form 536 , Operator Licensing Examination Data for Vogtle Electric Generating Plant - Units 3 & 4

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2024 (01-2021) r-....,. Estimated burden per response to comply with this wlunlaly infonnalion collection request 45 minutes.

~

~w,_'

~.. ~-'/

.'lo 11 OPERATOR LICENSING EXAMINATION DATA This infonnalion oolledion is used lo plan budgels and resouri:es for operator examinations. Send aimments reganling burden eslimate lo lhe FOIA, Libraly, and lnforma!ion Colleclions Branch (T-6 A10M), U.S. Nuclear Regulatory Conmissian. Washington. DC 2055S--0001, or by e-mai to lnfocollecis.Resource@nrc.gov. and the 0MB reviewer at 0MB Office of Information and Regulatory Affaizs, (3150-0131). Attn: Desk Officer for the Nuclear Regulato,y Commission, 725 17th Slteel l<<'J,
          • W85hington, OC 20503; e-mail: oira submission@omb eop gov. The NRC may not conducl or sponsor, and a petSOn is not required lo respond to, a CXlllection of information unle$s the document requesting or requiring the colleclion displays a currently valid 0MB oontrol number.

FACILITY NRCREGION

~OGTLE ELECTRIC GENERATING PLANT- UNITS 3&4 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2023 CY 2024 CY 2025 CY2026 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2023 CY2024 CY2025 CY2026 NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 0311812024 NIA 0411312026 ALTERNATE DATE NIA 04/15/2024 NIA 0311612026 NRC FORM 536 (01-2021)