NL-15-1080, Registration of Spent Fuel Cask Use
ML15173A416 | |
Person / Time | |
---|---|
Site: | Hatch, 07200036, Holtec |
Issue date: | 06/22/2015 |
From: | Pierce C Southern Co, Southern Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
References | |
NL-15-1080 | |
Download: ML15173A416 (2) | |
Category:Letter type:NL
MONTHYEARNL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024
[Table view]Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines NL-24-0351, – ISFSI - Registration of Spent Fuel Cask Use2024-09-13013 September 2024 – ISFSI - Registration of Spent Fuel Cask Use NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0199, Request for Specific Exemption2024-06-25025 June 2024 Request for Specific Exemption NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0197, Registration of Spent Fuel Cask Use2024-05-20020 May 2024 Registration of Spent Fuel Cask Use NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0620, – ISFSI, and Edwin I. Hatch Nuclear Plant – ISFSI, Registration of Spent Fuel Cask Use2023-08-0303 August 2023 – ISFSI, and Edwin I. Hatch Nuclear Plant – ISFSI, Registration of Spent Fuel Cask Use NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owners Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owners Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding 2024-09-09 Category:License-Application for Dry Cask ISFSI DKT 72 MONTHYEARML24100A7242024-01-0303 January 2024
[Table view]08. Hs A19 Proposed CoC (Compiled 2023-0313) ML22321A2772022-11-17017 November 2022 Renewed Facility License No. DPR-26 NL-22-0718, Registration of Spent Fuel Cask Use2022-09-14014 September 2022 Registration of Spent Fuel Cask Use ML22245A1062022-09-0202 September 2022 Attachment 2: Proposed Certificate of Compliance No. 1014, Appendix a, Technical Specifications for the HI-Storm 100 Cask System ML22028A3832022-01-28028 January 2022 Attachment 11: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form ML22028A3822022-01-28028 January 2022 Attachment 10: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form ML22028A3812022-01-28028 January 2022 Attachment 9: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form ML22028A3802022-01-28028 January 2022 Attachment 8: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form ML22028A3792022-01-28028 January 2022 Attachment 7: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form ML22028A3782022-01-28028 January 2022 Attachment 6: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix ML22028A3772022-01-28028 January 2022 Attachment 5: Holtec International, Appendix D Technical Specifications for the HI-Storm 100 Cask System ML22028A3762022-01-28028 January 2022 Attachment 4: Holtec International, Appendix C Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3752022-01-28028 January 2022 Attachment 3: Holtec International, Appendix B Technical Specifications for the HI-Storm 100 Cask System ML22028A3742022-01-28028 January 2022 Attachment 2: Holtec International, Appendix a Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3732022-01-28028 January 2022 Attachment 1: Holtec International, Amendment 16 Certificate of Compliance for Spent Fuel Storage Casks ML21349B4202021-12-15015 December 2021 Attachment 1: Proposed HI-STORM 100 CoC Amendment 18 (non-proprietary) ML21211A6072021-07-30030 July 2021 Attachment 3: HI-STORM 100 FSAR Proposed Revision 23 Revised Pages ML21211A6052021-07-30030 July 2021 Attachment 1: HI-STORM 100 Amendment 17 Summary of Proposed Changes ML21211A6062021-07-30030 July 2021 Attachment 2: Proposed Coc No. 72-1014 ML21118A8682021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix D, Approved Contents and Design Features for the Hi-Storm 100S Version E Cask and Hi-Trac Ms ML21113A2032021-04-23023 April 2021 Attachment 1 - Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System ML21068A3632021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance ML21068A3972021-03-0909 March 2021 Attachment 35 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form (Non-Proprietary) ML21068A3962021-03-0909 March 2021 Attachment 34 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form (Non-Proprietary) ML21068A3952021-03-0909 March 2021 Attachment 33 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3942021-03-0909 March 2021 Attachment 32 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3932021-03-0909 March 2021 Attachment 31 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form (Non-Proprietary) ML21068A3922021-03-0909 March 2021 Attachment 30 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form (Non-Proprietary) ML21068A3912021-03-0909 March 2021 Attachment 29 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form (Non-Proprietary) ML21068A3902021-03-0909 March 2021 Attachment 28 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix (Non-Proprietary) ML21068A3892021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization ML21068A3882021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization ML21068A3872021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization ML21068A3862021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization ML21068A3852021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization ML21068A3842021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization ML21068A3832021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization ML21068A3722021-03-0909 March 2021 HI-STORM 100 FSAR Proposed Revision 21 Revised Pages ML21068A3702021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D ML21068A3692021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C ML21068A3682021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U ML21068A3672021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U ML21068A3662021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B ML21068A3622021-03-0909 March 2021 HI-STORM 100 Amendment 16 Summary of Proposed Changes ML21068A3642021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a ML20290A8242020-10-16016 October 2020 Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System LR-N19-0029, Spent Fuel Cask Registration2019-02-25025 February 2019 Spent Fuel Cask Registration BVY 18-028, Registration of Spent Fuel Cask Use2018-07-0505 July 2018 Registration of Spent Fuel Cask Use NL-18-0627, Registration of Spent Fuel Casks2018-05-15015 May 2018 Registration of Spent Fuel Casks GO2-18-045, Registration of Spent Fuel Cask Use2018-03-21021 March 2018 Registration of Spent Fuel Cask Use 2024-01-03 |
Text
Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.
40 Inverness Center Parkway A
Post Office Box 1295 Birmingham, AL 35242 Tel 205.992.7872 Fax 205.992.7601 SOUTHERN COMPANY JUN 2 2 201'5 Docket Nos.: 50-321 NL-15-1080 50-366 72-36 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Registration of Spent Fuel Cask Use Ladies and Gentlemen:
Southern Nuclear Operating Company (SNC) operates the Edwin I. Hatch Nuclear Plant (Hatch) Independent Spent Fuel Storage Installation (ISFSI) in accordance with the general license provisions of 10 CFR 72.210. The requirements of 10 CFR 72.212(b)(2) include the registration of a spent fuel cask within 30 days of using a cask for the storage of spent nuclear fuel. Accordingly, SNC provides the following registration information associated with the HI-STORM 100 spent fuel cask systems recently placed into storage.
Cask Certificate: 72-1014, Amendment 9 Cask Model: HI-STORM 1OOS, Version B MPC Serial Number: 469 Overpack Serial Number: 831 Number of Fuel Bundles: 68 Placed in Service: June 12, 2015 The addition of the above cask results in the following totals for the Hatch ISFSI:
3 HI-STAR 100 Cask Systems 60 HI-STORM 100 Cask Systems
U.S. Nuclear Regulatory Commission NL-15-1080 Page 2 This letter contains no NRC commitments. If you have any questions, please contact Greg Johnson at (912) 537-587 4 C. R. Pierce Regulatory Affairs Director CRP/cdp cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Vineyard, Vice President- Hatch Mr. M. D. Meier, Vice President- Regulatory Affairs Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. J. Adams, Vice President- Engineering Mr. G. L. Johnson, Regulatory Affairs Manager- Hatch RTYPE: CHA02.004 U.S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Hatch Mr. D. H. Hardage, Senior Resident Inspector- Hatch