Letter Sequence Other |
---|
EPID:L-2022-LLA-0028, HI-STORM 100 Multipurpose Canister Storage System Amendment 19 Rsi Responses (Approved, Closed) |
Results
Other: ML23069A229, ML23069A230, ML23069A231, ML23069A232, ML23069A233, ML23069A234, ML23069A235, ML23069A236, ML23069A237, ML23069A238, ML23069A239, ML23069A240, ML23069A241, ML23363A031, ML24100A719, ML24100A720, ML24100A721, ML24100A722, ML24100A723, ML24100A724, ML24100A725, ML24100A726, ML24100A727, ML24100A728, ML24100A729
|
MONTHYEARML22073A0332022-03-23023 March 2022 Acknowledgment and Delay Review of Request for Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System Project stage: Approval ML23024A2662023-02-10010 February 2023 Acceptance Review of Request for Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System- Request for Supplemental Info Project stage: Acceptance Review ML23069A2352023-03-10010 March 2023 Attachment 6: HI-STORM 100 Amendment 19 CoC, Appendix A-100U Project stage: Other ML23069A2292023-03-10010 March 2023 HI-STORM 100 Multipurpose Canister Storage System Amendment 19 Rsi Responses Project stage: Other ML23069A2302023-03-10010 March 2023 Attachment 1: HI-STORM 100 Amendment 19 Rsi Responses Project stage: Other ML23069A2312023-03-10010 March 2023 Attachment 2: HI-STORM 100 Amendment 19 CoC Reorganization Matrix Project stage: Other ML23069A2322023-03-10010 March 2023 Attachment 3: HI-STORM 100 Amendment 19 CoC Reorganization Project stage: Other ML23069A2332023-03-10010 March 2023 Attachment 4: HI-STORM 100 Amendment 19 CoC, Appendix B Reorganization Project stage: Other ML23069A2342023-03-10010 March 2023 Attachment 5: HI-STORM 100 Amendment 19 CoC, Appendix D Reorganization Project stage: Other ML23069A2362023-03-10010 March 2023 Attachment 7: HI-STORM 100 Amendment 19 CoC, Appendix B-100U Project stage: Other ML23069A2372023-03-10010 March 2023 Attachment 8: HI-STORM 100 Amendment 19 CoC Reorganization Evaluation Form Project stage: Other ML23069A2382023-03-10010 March 2023 Attachment 9: HI-STORM 100 Amendment 19 CoC, Appendix a Reorganization Evaluation Form Project stage: Other ML23069A2392023-03-10010 March 2023 Attachment 10: HI-STORM 100 Amendment 19 CoC, Appendix B Reorganization Evaluation Form Project stage: Other ML23069A2402023-03-10010 March 2023 Attachment 11: HI-STORM 100 Amendment 19 CoC, Appendix C Reorganization Evaluation Form Project stage: Other ML23069A2272023-03-10010 March 2023 HI-STORM 100 Multipurpose Canister Storage System Amendment 19 Rsi Responses Project stage: Request ML23069A2412023-03-10010 March 2023 Attachment 12: HI-STORM 100 Amendment 19 CoC, Appendix D Reorganization Evaluation Form Project stage: Other ML23163A1402023-06-23023 June 2023 Acceptance Review of Request for Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System Project stage: Acceptance Review ML23324A0952023-12-0606 December 2023 Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multi-purpose Canister Storage System - Request for Additional Information Project stage: RAI ML23324A0932023-12-0606 December 2023 Amendment No. 19 to Certificate of Compliance No. 1014 for HI-STORM 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: Request ML23324A0942023-12-0606 December 2023 Request for Additional Information Project stage: RAI ML23355A0842023-12-21021 December 2023 International, Withdrawal of HI-STORM I00 Multipurpose Canister Storage System Amendment Project stage: Withdrawal ML24100A7292024-01-0303 January 2024 15. Graded Approach Reference Document List Project stage: Other ML24100A7282024-01-0303 January 2024 14. Hs A19 Proposed Appendix B-100U (Compiled 2023-0313) Project stage: Other ML24100A7272024-01-0303 January 2024 13. Hs A19 Proposed Appendix A-100U (Compiled 2023-0313) Project stage: Other ML24100A7262024-01-0303 January 2024 12. Hs A19 Proposed Appendix D (Compiled 2023-0313) Project stage: Other ML24100A7252024-01-0303 January 2024 10. Hs A19 Proposed Appendix B (Compiled 2023-0313) Project stage: Other ML24100A7242024-01-0303 January 2024 08. Hs A19 Proposed CoC (Compiled 2023-0313) Project stage: Other ML24100A7232024-01-0303 January 2024 07. Hs A19 Evaluation Form for Appendix D (Compiled 2023-0313) Project stage: Other ML24100A7222024-01-0303 January 2024 06. Hs A19 Evaluation Form for Appendix C (Compiled 2023-0313) Project stage: Other ML24100A7212024-01-0303 January 2024 05. Hs A19 Evaluation Form for Appendix B (Compiled 2023-0313) Project stage: Other ML24100A7202024-01-0303 January 2024 04. Hs A19 Evaluation Form for Appendix a (Compiled 2023-0313) Project stage: Other ML24100A7192024-01-0303 January 2024 03. Hs A19 Evaluation Form for CoC (Compiled 2023-0313) Project stage: Other ML23363A0312024-01-0404 January 2024 Application for HI-STORM 100 Cask System, Amendment No. 19 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure Project stage: Other 2023-02-10
[Table View] |
|
---|
Category:License-Application for Dry Cask ISFSI DKT 72
MONTHYEARML24100A7242024-01-0303 January 2024 08. Hs A19 Proposed CoC (Compiled 2023-0313) ML22321A2772022-11-17017 November 2022 Renewed Facility License No. DPR-26 NL-22-0718, Registration of Spent Fuel Cask Use2022-09-14014 September 2022 Registration of Spent Fuel Cask Use ML22245A1062022-09-0202 September 2022 Attachment 2: Proposed Certificate of Compliance No. 1014, Appendix a, Technical Specifications for the HI-Storm 100 Cask System ML22028A3832022-01-28028 January 2022 Attachment 11: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form ML22028A3822022-01-28028 January 2022 Attachment 10: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form ML22028A3812022-01-28028 January 2022 Attachment 9: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form ML22028A3802022-01-28028 January 2022 Attachment 8: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form ML22028A3792022-01-28028 January 2022 Attachment 7: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form ML22028A3782022-01-28028 January 2022 Attachment 6: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix ML22028A3762022-01-28028 January 2022 Attachment 4: Holtec International, Appendix C Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3752022-01-28028 January 2022 Attachment 3: Holtec International, Appendix B Technical Specifications for the HI-Storm 100 Cask System ML22028A3742022-01-28028 January 2022 Attachment 2: Holtec International, Appendix a Inspections, Tests, and Evaluations for the HI-Storm 100 Cask System ML22028A3732022-01-28028 January 2022 Attachment 1: Holtec International, Amendment 16 Certificate of Compliance for Spent Fuel Storage Casks ML22028A3772022-01-28028 January 2022 Attachment 5: Holtec International, Appendix D Technical Specifications for the HI-Storm 100 Cask System ML21349B4202021-12-15015 December 2021 Attachment 1: Proposed HI-STORM 100 CoC Amendment 18 (non-proprietary) ML21211A6062021-07-30030 July 2021 Attachment 2: Proposed Coc No. 72-1014 ML21211A6052021-07-30030 July 2021 Attachment 1: HI-STORM 100 Amendment 17 Summary of Proposed Changes ML21211A6072021-07-30030 July 2021 Attachment 3: HI-STORM 100 FSAR Proposed Revision 23 Revised Pages ML21118A8682021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix D, Approved Contents and Design Features for the Hi-Storm 100S Version E Cask and Hi-Trac Ms ML21113A2032021-04-23023 April 2021 Attachment 1 - Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System ML21068A3632021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance ML21068A3972021-03-0909 March 2021 Attachment 35 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization Evaluation Form (Non-Proprietary) ML21068A3962021-03-0909 March 2021 Attachment 34 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form (Non-Proprietary) ML21068A3952021-03-0909 March 2021 Attachment 33 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3942021-03-0909 March 2021 Attachment 32 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization Evaluation Form (Non-Proprietary) ML21068A3932021-03-0909 March 2021 Attachment 31 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization Evaluation Form (Non-Proprietary) ML21068A3922021-03-0909 March 2021 Attachment 30 - HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization Evaluation Form (Non-Proprietary) ML21068A3912021-03-0909 March 2021 Attachment 29 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form (Non-Proprietary) ML21068A3902021-03-0909 March 2021 Attachment 28 - HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Matrix (Non-Proprietary) ML21068A3892021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D Reorganization ML21068A3882021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization ML21068A3872021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U Reorganization ML21068A3862021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U Reorganization ML21068A3852021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B Reorganization ML21068A3842021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a Reorganization ML21068A3832021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization ML21068A3722021-03-0909 March 2021 HI-STORM 100 FSAR Proposed Revision 21 Revised Pages ML21068A3702021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix D ML21068A3692021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C ML21068A3682021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B-100U ML21068A3672021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U ML21068A3662021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix B ML21068A3622021-03-0909 March 2021 HI-STORM 100 Amendment 16 Summary of Proposed Changes ML21068A3642021-03-0909 March 2021 HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix a ML20290A8242020-10-16016 October 2020 Certificate of Compliance Renewal Application for the HI-STORM 100 Dry Storage System LR-N19-0029, Spent Fuel Cask Registration2019-02-25025 February 2019 Spent Fuel Cask Registration BVY 18-028, Registration of Spent Fuel Cask Use2018-07-0505 July 2018 Registration of Spent Fuel Cask Use NL-18-0627, Registration of Spent Fuel Casks2018-05-15015 May 2018 Registration of Spent Fuel Casks GO2-18-045, Registration of Spent Fuel Cask Use2018-03-21021 March 2018 Registration of Spent Fuel Cask Use 2024-01-03
[Table view] |
Text
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004) CERTIFICATE OF COMPLIANCE 10 CFR 72 FOR SPENT FUEL STORAGE CASKS Page 1 of 4
The U.S. Nuclear Regulatory Commission is issuing this Certificate of Compliance pursuant to Title 10 of the Code of Federal Regulations, Part 72, "Licensing Requirements for Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste" (10 CFR Part 72). This certificate is issued in accordance with 10 CFR 72.238, certifying that the storage design and contents described below meet the applicable safety standards set forth in 10 CFR Part 72, Subpart L, and on the basis of the Final Safety Analysis Report (FSAR) of the cask design. This certificate is conditional upon fulfilling the requirements of 10 CFR Part 72, as applicable, and the conditions specified below.
Certificate No. Effective Expiration Docket No. Amendment No. Amendment Effective Date Package Identification No.
Date Date 1014 05/31/00 05/31/20 72-1014 16 TBD USA/72-1014 Issued To: (Name/Address)
Holtec International Holtec Technology Campus One Holtec Blvd.
Camden, NJ 08104
Safety Analysis Report Title Holtec International Inc.,
Final Safety Analysis Report for the HI-STORM 100 Cask System
This certificate is conditional upon fulfilling the requirements of 10 CFR Part 72, as applicable, the attached Appendix A (Inspections, Tests and Evaluations) and Appendix B (Technical Specifications) for aboveground systems except Version E, HI-TRAC MS, MPC-32M, and Version 1 of MPC-32 and MPC-68; the attached Appendix C (Inspections, Tests and Evaluations) and Appendix D (Technical Specifications) for the HI-STORM 100S Version E, HI-TRAC MS, MPC-32M, and Version 1 of MPC-32 and MPC-68M; or the attached Appendix A-100U (Inspections, Tests and Evaluations) and Appendix B-100U (Technical Specifications) for underground systems, and the conditions specified below:
I. Technology
- a. Model No.: HI-STORM 100 Cask System
The HI-STORM 100 Cask System (the cask) consists of the following components: (1) interchangeable multi-purpose canisters (MPCs), which contain the fuel; (2) a storage overpack (HI-STORM), which contains the MPC during storage; and (3) a transfer cask (HI-TRAC), which contains the MPC during loading, unloading and transfer operations. The cask stores up to 32 pressurized water reactor fuel assemblies or 68 boiling water reactor fuel assemblies.
The HI-STORM 100 Cask System is certified as described in the Final Safety Analysis Report (FSAR) and in the U.S. Nuclear Regulatory Commissions (NRC) Safety Evaluation Report (SER) accompanying the Certificate of Compliance (CoC).
The MPC is the confinement system for the stored fuel. It is a welded, cylindrical canister with a honeycombed fuel basket, a baseplate, a lid, a closure ring, and the canister shell. All MPC components that may come into contact with spent fuel pool water or the ambient environment are made entirely of stainless steel or passivated aluminum/aluminum alloys such as the neutron absorbers. The canister shell, baseplate, lid, vent and drain port cover plates, and closure ring are the main confinement boundary components. All confinement boundary components are made entirely of stainless steel. The honeycombed basket, which contains neutron absorbing material, provides criticality control.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (3-1999) CERTIFICATE OF COMPLIANCE Certificate No. 1014 10 CFR 72 FOR SPENT FUEL STORAGE CASKS Amendment No. 16 Supplemental Sheet Page 2 of 4
There are twelve types of MPCs: the MPC-24, MPC-24E, MPC-24EF, MPC-32, MPC-32F, MPC-32 Version 1, MPC-32M, MPC-68, MPC-68 Version 1, MPC-68F, MPC-68FF, and MPC-68M. The number suffix indicates the maximum number of fuel assemblies permitted to be loaded in the MPC. All twelve MPC models have the same external diameter.
The HI-TRAC transfer cask provides shielding and structural protection of the MPC during loading, unloading, and movement of the MPC from the spent fuel pool to the storage overpack. The transfer cask is a multi-walled (carbon steel/lead/carbon steel) cylindrical vessel with a neutron shield jacket attached to the exterior. All transfer cask sizes have identical cavity diameters.
Above Ground Systems
The HI-STORM 100 or 100S storage overpack provides shielding and structural protection of the MPC during storage. The overpack is a heavy-walled steel and concrete, cylindrical vessel. Its side wall consists of plain (un-reinforced) concrete that is enclosed between inner and outer carbon steel shells.
The overpack has air vent at the bottom and at the top to allow air to circulate naturally through the cavity to cool the MPC inside. The HI-STORM 100 UVH is an alternative version of the overpack, with a similar design, but no air vents. A loaded MPC is stored within the HI-STORM 100 or 100S storage overpack in a vertical orientation. The HI-STORM 100A and 100SA are variants of the HI-STORM 100 family and are outfitted with an extended baseplate and gussets to enable the overpack to be anchored to the concrete storage pad in high seismic applications. The version E can be arrayed in a free standing or anchored configuration.
Underground Systems
The HI-STORM 100U System is an underground storage system identified with the HI-STORM 100 Cask System. The HI-STORM 100U storage Vertical Ventilated Module (VVM) utilizes a storage design identified as an air-cooled vault or caisson. Air inlets and outlets allow air to circulate naturally through the cavity to cool the MPC inside. The subterranean steel structure is seal welded to prevent ingress of any groundwater from the surrounding subgrade, and it is mounted on a stiff foundation. A loaded MPC is stored within the HI-STORM 100U storage VVM in the vertical orientation.
II. Design Features
- a. Codes and Standards
The American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), 1995 Edition with Addenda through 1997, is the governing Code for the HI-STORM 100 System MPCs, OVERPACKs, and TRANSFER CASKs, as clarified in item i below, except for Code Sections V and IX.
The latest effective editions of ASME Code Sections V and IX, including addenda, may be used for activities governed by those sections, provided a written reconciliation of the later edition against the 1995 Edition, including addenda, is performed by the certificate holder. American Concrete Institute (ACI) 349-85 is the governing Code for plain concrete as clarified in Appendix 1.D of the Final Safety Analysis Report for the HI-STORM 100 Cask System.
- i. Alternatives to Codes, Standards, and Criteria
Appendix A Table 3-1 and Appendix C Table 3-1 list approved alternatives to the ASME Code for the design of the MPCs, OVERPACKs, and TRANSFER CASKs of the HI -STORM 100 and 100U Cask Systems.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (3-1999) CERTIFICATE OF COMPLIANCE Certificate No. 1014 10 CFR 72 FOR SPENT FUEL STORAGE CASKS Amendment No. 16 Supplemental Sheet Page 3 of 4
ii. Construction/Fabrication Alternatives to Codes, Standards, and Criteria
Proposed alternatives to the ASME Code, Sections II and III, 1995 Edition with Addenda through 1997 including modifications to the alternatives allowed by item i may be used on a case-specific basis when authorized by the Director of the Office of Nuclear Material Safety and Safeguards or designee. The request for such alternative should demonstrate that:
- 1. The proposed alternatives would provide an acceptable level of quality and safety, or
- 2. Compliance with the specified requirements of the ASME Code,Section III, 1995 Edition with Addenda through 1997, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
- b. The NRC has approved an exemption request by the CoC applicant from the requirements of 10 CFR 72.236(f), to allow a Supplemental Cooling System to provide for decay heat removal in accordance with Section 3.1.4 of Appendices B and D.
- c. Heavy Loads Requirements
Each lift of an MPC, a HI-TRAC transfer cask, or any HI-STORM overpack must be made in accordance to the existing heavy loads requirements and procedures of the licensed facility at which the lift is made. A plant specific review (under 10 CFR 50.59 or 10 CFR 72.48, if applicable) is required to show operational compliance with existing plant specific heavy loads requirements. Lifting operations outside of structures governed by 10 CFR Part 50 must be in accordance with Section 4.2 and Sections 2.1.6 and 2.3 (if applicable) of Appendix A.
- d. Pre-Operational Testing and Training
- i. Dry Run Training Exercise
- 1. A dry run training exercise of the loading, closure, handling, unloading, and transfer of the HI-STORM 100 Cask System shall be conducted by the licensee prior to the first use of the system to load spent fuel assemblies. The training exercise shall not be conducted with spent fuel in the MPC. The dry run may be performed in an alternate step sequence from the actual procedures, but all steps must be performed. The dry run shall include, but is not limited to the following:
- 2. Moving the MPC and the transfer cask into the spent fuel pool or cask loading pool.
- 3. Preparation of the HI-STORM 100 Cask System for fuel loading.
- 4. Selection and verification of specific fuel assemblies to ensure type conformance.
- 5. Loading specific assemblies and placing assemblies into the MPC (using a dummy fuel assembly), including appropriate independent verification.
- 6. Remote installation of the MPC lid and removal of the MPC and transfer cask from the spent fuel pool or cask loading pool.
- 7. MPC welding, NDE inspections, pressure testing, draining, moisture removal (by vacuum drying or forced helium dehydration, as applicable), and helium backfilling. (A mockup may be used for this dry-run exercise.)
- 8. Operation of the HI-STORM 100 SCS or equivalent system, if applicable.
- 9. Transfer cask upending/downending on the horizontal transfer trailer or other transfer device, as applicable to the sites cask handling arrangement.
- 10. Transfer of the MPC from the transfer cask to the overpack/VVM.
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (3-1999) CERTIFICATE OF COMPLIANCE Certificate No. 1014 10 CFR 72 FOR SPENT FUEL STORAGE CASKS Amendment No. 16 Supplemental Sheet Page 4 of 4
- 11. Placement of the HI-STORM 100 Cask System at the ISFSI, for aboveground systems only.
- 12. HI-STORM 100 Cask System unloading, including flooding MPC cavity, removing MPC lid welds. (A mockup may be used for this dry-run exercise.)
FOR THE U.S. NUCLEAR REGULATORY COMMISSION
Dated TBD
Attachments:
- 1. Appendix A
- 2. Appendix B
- 3. Appendix A-100U
- 4. Appendix B-100U
- 5. Appendix C
- 6. Appendix D