ITAAC Closure Notification on Completion of ITAAC 3.2.00.09 (Index Number 758)
ML22112A183
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/22/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0285
Download: ML22112A183 (6)


Text

Jamie M. Coleman 7825 River Road A Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 VogUe 3 & 4 706-848-6926 tel Docket No.: 52-025 ND-22-0285 APR 2 2 2022 10 CFR 52 .99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITMC 3.2.00.09 [Index Number 758)

Ladies and Gentlemen :

In accordance with 10 CFR 52 .99(c)(1) , the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses , and Acceptance Criteria (ITMC) Item 3.2.00.09 [Index Number 758].

This ITAAC confirms that the capability for local control and monitoring from selected locations throughout the plant exists . The closure process for th is ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01 , "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52 ," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments . Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publ ication of the required notice in the Federal Register per 10 CFR 52 .99 .

If there are any questions, please contact Kelli Roberts at 706-848-6991 .

Respectfully submitted ,

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.2.00.09 [Index Number 758]

JMC/RLB/sfr

U.S. Nuclear Regulatory Commission ND-22-0285 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A . C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND .LI .L06 File AR.01 .02 .06 cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G . Bowman Ms. A. Veil Mr. C. P. Patel Mr. G . J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0 . Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0285 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C . Durham Mr. M. M. Corletti Mr. Z . S . Harper Ms. S . L. Zwack Other Mr. S. W . Kline , Bechtel Power Corporation Ms. L. Matis , Tetra Tech NUS, Inc.

Dr. W . R. Jacobs, Jr., Ph.D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton , Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0285 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-22-0285 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.2.00.09 [Index Number 758]

U.S. Nuclear Regulatory Commission ND-22-0285 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

9. The capability to access displays and controls is provided (controls as assigned by the MCR operators) for local control and monitoring from selected locations throughout the plant.

Inspections/Tests/Analyses An inspection of the local control and monitoring capability is provided .

Acceptance Criteria The capabil ity for local control and monitoring from selected locations throughout the plant exists .

ITAAC Determination Basis An inspection was performed to demonstrate that the capability to access displays and controls is provided (controls as assigned by the MCR operators) for local control and monitoring from selected locations throughout the plant.

An inspection was performed in accordance with Unit 3 component test work order listed in Reference 1. The component test package work order directed monitoring and controlling plant components at six different local control stations . The local control stations are the Primary Sampling System Room , Radiological Chemistry Lab, Radiological Waste Corridor, Operator Work Area , Annex Building Conference Room , and Turbine and Outside Operator Conference Room . A system was selected at each local control station , indications were verified to be available , and component controls were manipulated and component operation was verified .

The completed Unit 3 component test results are summarized in Reference 1 and confirm that the capability for local control and monitoring from selected locations throughout the plant exists .

Reference 1 is available for NRC inspection as part of the ITAAC 3.2.00.09 Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion , Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions . This review found there were no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 3.2.00.09 (Reference 2) and is available for NRC review.

ITAAC Completion Statement Based on the above information , SNC hereby notifies the NRC that ITAAC 3.2.00.09 was performed for VEGP Unit 3 and that the prescribed acceptance criteria was met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed , ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-22-0285 Enclosure Page 3 of 3 References (available for NRC inspection)

1. SV3-HSI-ITR-800758, Unit 3 Capability to Access Plant Displays and Controls ITAAC 3.2.00.09 , Rev 0
2. 3.2.00.09-U3-CP-Rev 0, ITAAC Completion Package