ND-22-0088, ITAAC Closure Notification on Completion of ITAAC 2.6.01.03a (Index Number 582)

From kanterella
(Redirected from ND-22-0088)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.6.01.03a (Index Number 582)
ML22055A980
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/24/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0088
Download: ML22055A980 (7)


Text

Michael J. Yox 7825 River Road Southern Nuclear Regulatory Affairs Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel FEB 2 <1 2022 Docket No.: 52-025 ND-22-0088 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Controi Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.6.01.03a findex Number 5821 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.01.03a [Index Number 582]. This ITAAC confirms that the Reactor Coolant Pump Circuit Breakers are powered from their respective Class IE division. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, piease contact Kelli Roberts at 706-848-6991.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.6.01.03a [Index Number 582]

MJY/GCS/sfr

U.S. Nuclear Regulatory Commission ND-22-0088 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Hi Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberiain Mr. J. C. Hasweii Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Reouiatorv Commission Ms. M. Bailey M . M. King M . G. Bowman Ms. A. Veil M C. P. Patei M G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Weich M J. Gasievic M O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M J. Eargie M T. Faneiii Ms. K. McCurry M J. Parent M B. Griman M V. Hail

U.S. Nuclear Regulatory Commission ND-22-0088 Page 3 of 3 Qqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-22-0088 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0088 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.6.01.03a [Index Number 582]

U.S. Nuclear Regulatory Commission ND-22-0088 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 3.a) The Class 1E breaker control power for the equipment identified in Table 2.6.1-1 are powered from their respective Class 1E division.

Inspections/Tests/Analvses Testing will be performed on the ECS by providing a simulated test signal in each Class IE division.

Acceptance Criteria A simulated test signal exists at the Class 1E equipment identified in Table 2.6.1-1 when the assigned Class 1E division is provided the test signal ITAAC Determination Basis Testing was performed on the Class 1E breaker control power for the equipment identified in the VEGP Unit 3 COL Appendix C Table 2.6.1-1 (Attachment A)to demonstrate the breaker control power is powered from its respective Class 1E division. This ITAAC performs testing on the Main ac Power System (ECS)equipment identified in Table 2.6.1-1 by providing a simulated test signal in each Class IE division.

Class 1E power verification testing of the Protection and Safety Monitoring System (PMS) cabinets, associated with the equipment identified in Attachment A, is verified through the applicable portions of ITAAC 2.5.02.05a testing (Reference 1) and confirms the PMS cabinets are powered from their respective Class IE division. SV3-ECS-ITR 800582(Reference 2) documents completion of power verification activities from the PMS cabinets and the Class 1E power distribution panels for the breaker control power for the equipment identified in Attachment A. Reference 2 first verified that power supply cables/wiring were installed and terminated from the applicable PMS cabinet and Class 1E power distribution panels to the respective circuit breaker identified in Attachment A using approved construction drawings and cable/wiring termination documentation. Reference 2 then confirmed, via cable/wiring termination inspection documentation, that continuity testing was performed on each of the installed cables/wiring to confirm current flow within the installed cable/wiring. The combination of cable/wiring installation and termination verification, with the installed cable/wiring continuity testing, confirmed that the breaker control power for the equipment identified in Appendix A is powered from its respective Class 1E division.

The results of the testing are documented in SV3-ECS-ITR 800582(Reference 2) and confirmed that a simulated test signal exists at the Class 1E equipment identified in Table 2.6.1-1 when the assigned Class 1E division provided the test signal.

References 1 and 2 are available for NRC inspection as part of the Unit 3 ITAAC 2.6.01.03a Completion Package (Reference 3).

U.S. Nuclear Regulatory Commission ND-22-0088 Enclosure Page 3 of 4 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

The ITAAC completion review is documented in the Vogtle Unit 3 ITAAC Completion Package for ITAAC 2.6.01.03a (Reference 3)and is available for NRC inspection.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.6.01.03a was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References ^available for NRC inspection^

1. SV3-PMS-ITR-800527-1 rev. 0,"Unit 3 Protection & Safety Monitoring(PMS)System Equipment by Assigned Class 1E Division: ITAAC 2.5.02.05a"
2. SV3-ECS-ITR 800582 Rev. 0,"Unit 3 Main AC Power System (ECS) Equipment Signaled from Assigned Division: ITAAC 2.6.01.03a(NRC Index #582)"
3. 2.6.01.03a-U3-CP-Rev 0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-0088 Enclosure Page 4 of 4 Attachment A COL Appendix C Table 2.6.1-1 Equipment Name* Tag No.*

Reactor Coolant Pump(RCP) Circuit ECS-ES-31 Breaker RCP Circuit Breaker ECS-ES-32 RCP Circuit Breaker ECS-ES-41 RCP Circuit Breaker ECS-ES-42 RCP Circuit Breaker ECS-ES-51 RCP Circuit Breaker ECS-ES-52 RCP Circuit Breaker ECS-ES-61 RCP Circuit Breaker ECS-ES-62 Excerpted from COL Appendix C Table 2.6.1-1