SUBJECT:
PERRY NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000440/2025420
Dear Terry Brown:
On August 28, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant. On August 29, 2025, the NRC inspectors discussed the results of this inspection with Darin Benyak, Plant General Manager, and other members of your staff.
The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.
However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 07, 2025, to December 23, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations December 15, 2025 Signed by Clark, Jefferson on 12/15/25
Docket No. 05000440 License No. NPF-58
Enclosure:
As stated
Inspection Report
Docket Number:
05000440
License Number:
Report Number:
Enterprise Identifier:
I-2025-420-0009
Licensee:
Vistra Operations Company, LLC
Facility:
Perry Nuclear Power Plant, Unit 1
Location:
Perry, Ohio
Inspection Dates:
August 04, 2025, to August 29, 2025
Inspectors:
J. Berry, Team Leader, NSIR
N. Egan, Senior Physical Security Inspector, RIII
D. Hostetter, Senior Physical Security Inspector, NSIR
P. Negrete, Physical Security Inspector, NSIR
A. Woyansky, Senior Physical Security Inspector, NSIR
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
- (1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
REPORT ATTACHMENTS
Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126205.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On August 29, 2025, the inspectors presented the security baseline inspection results to Darin Benyak, Plant General Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Report
CR-2025-05584
June 2025
Corrective Action
Documents
Condition Report
CR-2025-05586
June 2025
Corrective Action
Documents
Condition Report
CR-2025-05582
June 2025
Corrective Action
Documents
Corrective Actions
CR-2022-04718
06/08/2022
Corrective Action
Documents
Corrective Actions
CR-2022-05233
06/30/2022
Corrective Action
Documents
Corrective Actions
CR-2022-05324
07/05/2022
Corrective Action
Documents
Corrective Actions
CR-2022-07586
10/10/2022
Corrective Action
Documents
Corrective Actions
CR-2022-07587
10/10/2022
Corrective Action
Documents
Corrective Actions
CR-2022-07832
10/17/2022
Corrective Action
Documents
Corrective Actions
CR-2023-04063
05/15/2023
Corrective Action
Documents
Corrective Actions
CR-2023-04064
05/15/2023
Corrective Action
Documents
Corrective Actions
CR-2023-04093
05/16/2023
Corrective Action
Documents
Corrective Actions
CR-2023-04525
06/01/2023
Corrective Action
Documents
Corrective Actions
CR-2023-04526
06/01/2023
Corrective Action
Documents
Corrective Actions
CR-2023-05705
07/21/2023
Corrective Action
Documents
Corrective Actions
CR-2023-07401
09/29/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Corrective Actions
CR-2023-07470
10/03/2023
Corrective Action
Documents
Corrective Actions
CR-2023-07817
10/17/2023
Corrective Action
Documents
Corrective Actions
CR-2023-07818
10/17/2023
Corrective Action
Documents
Corrective Actions
CR-2024-04015
05/03/2024
Corrective Action
Documents
Corrective Actions
CR-2024-04071
05/06/2024
Corrective Action
Documents
Corrective Actions
CR-2024-04892
06/04/2024
Corrective Action
Documents
Corrective Actions
CR-2024-04893
06/04/2024
Corrective Action
Documents
Corrective Actions
CR-2024-07337
09/16/2024
Corrective Action
Documents
Corrective Actions
CR-2024-07339
09/16/2024
Corrective Action
Documents
Corrective Actions
CR-2024-08030
10/14/2024
Corrective Action
Documents
Corrective Actions
CR-2024-08033
10/14/2024
Corrective Action
Documents
Corrective Actions
CR-2025-04094
06/02/2025
Corrective Action
Documents
Corrective Actions
CR-2024-07341
09/16/2024
Corrective Action
Documents
Resulting from
Inspection
Condition Report
CR-2025-05633
August 2025
Corrective Action
Documents
Resulting from
Inspection
Condition Report
CR-2025-05720
August 2025
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Resulting from
Inspection
Condition Report
CR-2025-05924
August 2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Actions
CR-2025-06119
08/28/2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Actions
CR-2025-06107
08/27/2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Actions
CR-2025-06092
08/27/2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Actions
CR-2025-06116
08/28/2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Actions
CR-2025-06117
08/28/2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Actions
CR-2025-06118
08/28/2025
Miscellaneous
ATA-2024-0188-13
Self-Assessment Report
06/12/2025
Miscellaneous
FELP-Task 21
Direct Response Team Activities
05/10/2019
Miscellaneous
Perry Nuclear Power Plant
Perry Nuclear Power Plant Strategy Brief 2025
N/A
Procedures
Blast analysis
Perry Nuclear Power Plant Security Calculation
Review
July 2016
Procedures
NOBP-LP-1122
Preparing for a Triennial Force-on-Force
Revision 2
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluation
Procedures
NOBP-LP-1123
Force-on-Force Assessment Guide
Revision 0
Procedures
NOBP-LP-1204
Primary Facility Controls
Revision 12
Procedures
NOBP-LP-1207
Security/Adversary Timeline Guidance
Revision 1
Procedures
NOBP-LP-1207
Security and Adversary Timeline Methodology
Revision 2
Procedures
NOBP-LP-1302
Multi-Integrated Laser Equipment System
(MILES)
Revision 6
Procedures
NOP-LP-1102-03
LLEA Agreement
11/18/2024
Procedures
NOP-LP-1204
Primary Access Facility Controls
Revision 12
Procedures
Perry Nuclear Power Plant
Perry Nuclear Power Plant Physical Security Plan
Revision 16
Procedures
Perry Nuclear Power Plant
Site Protection Section
Use of Force Policy
2/11/20
Procedures
Perry Nuclear Power Plant
Target Sets
Target Set Manuel
Revision 7
Procedures
Primary Access Facility
Controls
Camera Policy
Revision 12
Procedures
Tactical Qualification Course
Revision 20
Procedures
SE-Miles_FEN-03
Use of SAAB Equipment
Revision 5
Procedures
Site Protection Fleet
Objective SE-Controller_FEN
Drill Exercise Controller
Revision 2
Procedures
SPI-0028
Security Communications
Revision 16
Procedures
SPI-0036
PNNPP Protective Strategy
Revision 30
Procedures
SSI-0003
Security System Equipment Operability Testing
Revision 58
Procedures
SSI-008
Perimeter Equipment - Annual and Acceptance
Testing
Revision 27
Procedures
SSI-009
Security System Equipment Testing Following
Repairs and Calibration
Revision 35
OFFICE
NSIR/DPCP/RSB
R-III/DRS/PSB
NSIR/DSO/SPEB
/ETB
NSIR/DSO/SPEB
/ETA
NAME
DHostetter
NEgan
JBerry
JClark
DATE
Dec 3, 2025
Dec 3, 2025
Dec 3, 2025
Dec 15, 2025