ML25336A140
| ML25336A140 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/15/2025 |
| From: | Clark J Security Performance Evaluation Branch |
| To: | Tony Brown Vistra Operations Company |
| References | |
| IR 2025420 | |
| Download: ML25336A140 (0) | |
Text
Terry J. Brown Site Vice President Vistra Operations Company, LLC Perry Nuclear Power Plant 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000440/2025420
Dear Terry Brown:
On August 28, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant. On August 29, 2025, the NRC inspectors discussed the results of this inspection with Darin Benyak, Plant General Manager, and other members of your staff.
The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.
However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 07, 2025, to December 23, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations December 15, 2025 Signed by Clark, Jefferson on 12/15/25
Docket No. 05000440 License No. NPF-58
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV Terry J. Brown, Site Vice President, terry.brown@vistracorp.com Vincent Forbus, Jr., Security Manager, vincent.forbus@vistracorp.com
ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:
05000440 License Number:
NPF-58 Report Number:
05000440/2025420 Enterprise Identifier:
I-2025-420-0009 Licensee:
Vistra Operations Company, LLC Facility:
Perry Nuclear Power Plant, Unit 1 Location:
Perry, Ohio Inspection Dates:
August 04, 2025, to August 29, 2025 Inspectors:
J. Berry, Team Leader, NSIR N. Egan, Senior Physical Security Inspector, RIII D. Hostetter, Senior Physical Security Inspector, NSIR P. Negrete, Physical Security Inspector, NSIR A. Woyansky, Senior Physical Security Inspector, NSIR Approved By:
Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations
2
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS 71130.03 - Contingency Response - Force-On-Force Testing Contingency Response - Force-On-Force Testing (1 Sample)
(1)
NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
REPORT ATTACHMENTS Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126205.
INSPECTION RESULTS No findings were identified.
EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
On August 29, 2025, the inspectors presented the security baseline inspection results to Darin Benyak, Plant General Manager, and other members of the licensee staff.
4 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 71130.03 Corrective Action Documents Condition Report CR-2025-05584 June 2025 71130.03 Corrective Action Documents Condition Report CR-2025-05586 June 2025 71130.03 Corrective Action Documents Condition Report CR-2025-05582 June 2025 71130.03 Corrective Action Documents Corrective Actions CR-2022-04718 06/08/2022 71130.03 Corrective Action Documents Corrective Actions CR-2022-05233 06/30/2022 71130.03 Corrective Action Documents Corrective Actions CR-2022-05324 07/05/2022 71130.03 Corrective Action Documents Corrective Actions CR-2022-07586 10/10/2022 71130.03 Corrective Action Documents Corrective Actions CR-2022-07587 10/10/2022 71130.03 Corrective Action Documents Corrective Actions CR-2022-07832 10/17/2022 71130.03 Corrective Action Documents Corrective Actions CR-2023-04063 05/15/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-04064 05/15/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-04093 05/16/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-04525 06/01/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-04526 06/01/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-05705 07/21/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-07401 09/29/2023
5 Inspection Procedure Type Designation Description or Title Revision or Date 71130.03 Corrective Action Documents Corrective Actions CR-2023-07470 10/03/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-07817 10/17/2023 71130.03 Corrective Action Documents Corrective Actions CR-2023-07818 10/17/2023 71130.03 Corrective Action Documents Corrective Actions CR-2024-04015 05/03/2024 71130.03 Corrective Action Documents Corrective Actions CR-2024-04071 05/06/2024 71130.03 Corrective Action Documents Corrective Actions CR-2024-04892 06/04/2024 71130.03 Corrective Action Documents Corrective Actions CR-2024-04893 06/04/2024 71130.03 Corrective Action Documents Corrective Actions CR-2024-07337 09/16/2024 71130.03 Corrective Action Documents Corrective Actions CR-2024-07339 09/16/2024 71130.03 Corrective Action Documents Corrective Actions CR-2024-08030 10/14/2024 71130.03 Corrective Action Documents Corrective Actions CR-2024-08033 10/14/2024 71130.03 Corrective Action Documents Corrective Actions CR-2025-04094 06/02/2025 71130.03 Corrective Action Documents Corrective Actions CR-2024-07341 09/16/2024 71130.03 Corrective Action Documents Resulting from Inspection Condition Report CR-2025-05633 August 2025 71130.03 Corrective Action Documents Resulting from Inspection Condition Report CR-2025-05720 August 2025
6 Inspection Procedure Type Designation Description or Title Revision or Date 71130.03 Corrective Action Documents Resulting from Inspection Condition Report CR-2025-05924 August 2025 71130.03 Corrective Action Documents Resulting from Inspection Corrective Actions CR-2025-06119 08/28/2025 71130.03 Corrective Action Documents Resulting from Inspection Corrective Actions CR-2025-06107 08/27/2025 71130.03 Corrective Action Documents Resulting from Inspection Corrective Actions CR-2025-06092 08/27/2025 71130.03 Corrective Action Documents Resulting from Inspection Corrective Actions CR-2025-06116 08/28/2025 71130.03 Corrective Action Documents Resulting from Inspection Corrective Actions CR-2025-06117 08/28/2025 71130.03 Corrective Action Documents Resulting from Inspection Corrective Actions CR-2025-06118 08/28/2025 71130.03 Miscellaneous ATA-2024-0188-13 Self-Assessment Report 06/12/2025 71130.03 Miscellaneous FELP-Task 21 Direct Response Team Activities 05/10/2019 71130.03 Miscellaneous Perry Nuclear Power Plant Perry Nuclear Power Plant Strategy Brief 2025 N/A 71130.03 Procedures Blast analysis Perry Nuclear Power Plant Security Calculation Review July 2016 71130.03 Procedures NOBP-LP-1122 Preparing for a Triennial Force-on-Force Revision 2
7 Inspection Procedure Type Designation Description or Title Revision or Date Evaluation 71130.03 Procedures NOBP-LP-1123 Force-on-Force Assessment Guide Revision 0 71130.03 Procedures NOBP-LP-1204 Primary Facility Controls Revision 12 71130.03 Procedures NOBP-LP-1207 Security/Adversary Timeline Guidance Revision 1 71130.03 Procedures NOBP-LP-1207 Security and Adversary Timeline Methodology Revision 2 71130.03 Procedures NOBP-LP-1302 Multi-Integrated Laser Equipment System (MILES)
Revision 6 71130.03 Procedures NOP-LP-1102-03 LLEA Agreement 11/18/2024 71130.03 Procedures NOP-LP-1204 Primary Access Facility Controls Revision 12 71130.03 Procedures Perry Nuclear Power Plant Perry Nuclear Power Plant Physical Security Plan Revision 16 71130.03 Procedures Perry Nuclear Power Plant Site Protection Section Use of Force Policy 02/11/20 71130.03 Procedures Perry Nuclear Power Plant Target Sets Target Set Manuel Revision 7 71130.03 Procedures Primary Access Facility Controls Camera Policy Revision 12 71130.03 Procedures SC2131-20 Tactical Qualification Course Revision 20 71130.03 Procedures SE-Miles_FEN-03 Use of SAAB Equipment Revision 5 71130.03 Procedures Site Protection Fleet Objective SE-Controller_FEN Drill Exercise Controller Revision 2 71130.03 Procedures SPI-0028 Security Communications Revision 16 71130.03 Procedures SPI-0036 PNNPP Protective Strategy Revision 30 71130.03 Procedures SSI-0003 Security System Equipment Operability Testing Revision 58 71130.03 Procedures SSI-008 Perimeter Equipment - Annual and Acceptance Testing Revision 27 71130.03 Procedures SSI-009 Security System Equipment Testing Following Repairs and Calibration Revision 35
ML25336A140 OFFICE NSIR/DPCP/RSB R-III/DRS/PSB NSIR/DSO/SPEB
/ETB NSIR/DSO/SPEB
/ETA NAME DHostetter NEgan JBerry JClark DATE Dec 3, 2025 Dec 3, 2025 Dec 3, 2025 Dec 15, 2025