SUBJECT:
UPDATED INSPECTION PLAN FOR PERRY NUCLEAR POWER PLANT (REPORT 05000440/2025005)
Dear Terry Brown:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Perry Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
The NRC plans to perform Inspection Procedure 71003, Post-Approval site Inspection for License Renewal, at your facility.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
August 26, 2025 Please contact me at 630-829-9520 with any questions you have regarding this letter.
Sincerely, Elba M. Sanchez Santiago, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000440 and 07200069 License No. NPF-58 Enclosure:
Inspection Plan cc: Distribution via LISTSERV Signed by Sanchez Santiago, Elba on 08/26/25
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE RIII RIII NAME RNg:gmp ESanchezSantiago DATE 08/26/2025 08/26/2025
Site Inspection Activity Plan Perry 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Triennial Material Control & Accounting Inspection - PER
1 4/1/2025 12/31/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
Functional Engineering Inspection - Commercial Grade Dedication - PER
1 7/14/2025 8/1/2025 IP 71111.21N.03 001808 Commercial Grade Dedication Security Baseline Inspection - PER
1 8/4/2025 10/10/2025 IP 71130.02 000734 Access Control Force-On-Force Planning and Exercise Weeks - PER
1 8/4/2025 8/8/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
8/25/2025 8/29/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Radiation Protection Baseline Inspection - PER
1 8/18/2025 8/22/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program
8/18/2025 8/22/2025 IP 71151 000746 Performance Indicator Verification Emergency Preparedness Program Inspection / Performance Indicator Review - PER
1 9/8/2025 9/12/2025 IP 71114.02 000717 Alert and Notification System Testing
9/8/2025 9/12/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
9/8/2025 9/12/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
9/8/2025 9/12/2025 IP 71151 001397 Performance Indicator Verification Cyber Security Inspection - PER
1 9/22/2025 9/26/2025 IP 71130.10 000741 Cybersecurity Biennial Problem Identification and Resolution Inspection - PER
1 10/20/2025 11/7/2025 IP 71152B 000747 Problem Identification and Resolution Eplan and EAL Changes Review - PER
1 11/1/2025 12/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Perry 2025 Licensed Operator Biennial Requalification Program Inspection
1 11/16/2025 11/22/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Radiation Protection Baseline Inspection - PER
1 11/17/2025 11/21/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation Security Baseline Inspection - PER
1 11/17/2025 11/21/2025 IP 71130.02 000734 Access Control Functional Engineering Inspection - Age Related Degradation - PER
1 1/26/2026 2/13/2026 IP 71111.21N.04 001832 Age-Related Degradation Security Baseline Inspection - PER
Prepared on 8/26/2025 12:12:55 PM 1 of 3
Site Inspection Activity Plan
3/2/2026 3/6/2026 IP 71130.01 000733 Access Authorization
3/2/2026 3/6/2026 IP 71130.02 000734 Access Control
3/2/2026 3/6/2026 IP 71130.08 000740 Fitness-For-Duty Program Radiation Protection Baseline Inspection - PER
1 7/13/2026 7/17/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
7/13/2026 7/17/2026 IP 71124.04 000728 Occupational Dose Assessment
7/13/2026 7/17/2026 IP 71151 000746 Performance Indicator Verification Security Baseline Inspection - PER
1 7/13/2026 7/17/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
7/13/2026 7/17/2026 IP 71130.09 001656 Security Plan Changes
7/13/2026 7/17/2026 IP 71151 001338 Performance Indicator Verification License Renewal Post Approval Phase 2 - PER
1 8/17/2026 9/4/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal Security Baseline Inspection - PER
1 8/24/2026 8/28/2026 IP 71130.05 000737 Protective Strategy Evaluation Emergency Preparedness Exercise Inspection / Performance Indicator Verification - PER
1 8/10/2026 9/25/2026 IP 71114.08 000723 Exercise Evaluation - Scenario Review
9/21/2026 9/25/2026 IP 71114.01 000716 Exercise Evaluation
9/21/2026 9/25/2026 IP 71151 001397 Performance Indicator Verification EAL & EPlan Changes Review - PER
1 11/1/2026 12/31/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Radiation Protection Baseline Inspection - PER
1 11/16/2026 11/20/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Perry December 2026 Initial License Examination
1 11/1/2026 11/6/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
12/6/2026 12/12/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Security Baseline Inspection - PER
1 1/1/2027 12/31/2027 IP 71130.14 000743 Review of Power Reactor Target Sets Security Baseline Inspection - PER
1 2/8/2027 2/12/2027 IP 71130.02 000734 Access Control
2/8/2027 2/12/2027 IP 71130.09 001656 Security Plan Changes Perry Inservice Inspection
1 3/1/2027 3/26/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Radiation Protection Baseline Inspection - PER
1 3/1/2027 3/5/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Prepared on 8/26/2025 12:12:55 PM 2 of 3
Site Inspection Activity Plan Emergency Preparedness Program Inspection / Performance Indicator Review - PER
1 4/19/2027 4/23/2027 IP 71114.02 000717 Alert and Notification System Testing
4/19/2027 4/23/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
4/19/2027 4/23/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
4/19/2027 4/23/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness
4/19/2027 4/23/2027 IP 71151 001397 Performance Indicator Verification Prepared on 8/26/2025 12:12:55 PM 3 of 3