March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION - REPORT 05000458/2024006
Dear Phil Hansett:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of River Bend Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program
- Operations Phase.
The NRC determined the performance at River Bend Station during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
At the start of the assessment period, River Bend Station performance was within the Regulatory Response column, the second highest performance column, based on a White finding in the Mitigating systems cornerstone and a White finding in the Emergency Preparedness cornerstone originating in the third quarter of 2023 and all PIs within the expected range (i.e., Green). The NRC notified you in River Bend Station - 95001 Supplemental Inspection Report 05000458/2023040 and Follow-Up Assessment Letter dated January 18, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No.
ML24017A045), of closure of the White finding in the Mitigating Systems cornerstone. The NRC also notified you in River Bend Station - 95001 Supplemental Inspection Report 05000458/2024040 and Follow-up Assessment Letter dated March 15, 2024 (ADAMS Accession No. ML24074A476), of closure of the White finding in the Emergency Preparedness cornerstone and the stations transition to the Licensee Response Column as of February 1, 2024.
The enclosed inspection plan lists the inspections scheduled through December 31, 2026.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan includes Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, which will take place from May 5, 2025, to May 23, 2025. The Regional Administrator has authorized the NRC to conduct this inspection. Additionally, from January 1, 2024, to December 31, 2024, the NRC issued three traditional enforcement Severity Level (SL) IV non-cited violations (NCVs) associated with impeding the regulatory process.
Therefore, the NRC plans to conduct Inspection Procedure 92723, Planned Follow up Inspection of One SL III and Two SL IV Traditional Enforcement Violations in the Same Area in a 12-month Period, to follow-up on these violations after the station informs the NRC of its readiness. The Regional Administrator authorized this inspection in Assessment Letter 05000298/2022006, dated March 1, 2023. The scope of this inspection will include the twelve SL IV NCVs issued between September 30, 2022, and December 31, 2024.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact Douglas Dodson at (817) 200-1148 with any questions you have regarding this letter.
Sincerely, Geoffrey B. Miller, Director Division of Operating Reactor Safety Docket No. 05000458 License No. NPF-47 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Miller, Geoffrey on 03/11/25
ML25065A050 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: DED Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DORS:PBC D:DORS NAME DDodson GMiller SIGNATURE
/RA/
/RA/
DATE 03/06/25 03/11/25
Site Inspection Activity Plan 07200049 - River Bend (ISFSI)
01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count River Bend ISFSI non-loading inspection and ISFSI Aging Management Inspection
3/17/2025 4/11/2025 IP 60855 001001 Operation Of An ISFSI 3/17/2025 4/11/2025 IP 60859 001921 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection River Bend ISFSI Pad Pour (one week during construction)
1/1/2026 1/31/2026 IP 60853 000999 Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation Prepared on 2/26/2025 10:56:35 AM 1 of 3
Site Inspection Activity Plan River Bend 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count Inservice Inspection-RBS
1 2/14/2025 2/22/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 2/17/2025 2/21/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2/17/2025 2/21/2025 IP 71151 000746 Performance Indicator Verification License Renewal 71003-RBS (Phase 2)
1 5/5/2025 5/9/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
5/19/2025 5/23/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal RBS 2025 Biennial PI&R
1 6/8/2025 6/14/2025 IP 71152B 000747 Problem Identification and Resolution
6/22/2025 6/28/2025 IP 71152B 000747 Problem Identification and Resolution Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)
1 6/23/2025 6/27/2025 IP 71130.02 000734 Access Control
6/23/2025 6/27/2025 IP 71130.09 001656 Security Plan Changes
6/23/2025 6/27/2025 IP 71151 001338 Performance Indicator Verification EP 2025 Program Inspection - RBS
1 7/14/2025 7/18/2025 IP 71114.02 000717 Alert and Notification System Testing
7/14/2025 7/18/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
7/14/2025 7/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
7/14/2025 7/18/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
7/14/2025 7/18/2025 IP 71151 001397 Performance Indicator Verification RP 5,8 - RBS
1 8/4/2025 8/8/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
8/4/2025 8/8/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Age-Related Degradation Inspection - River Bend Station
1 9/8/2025 9/12/2025 IP 71111.21N.04 001832 Age-Related Degradation
9/22/2025 9/26/2025 IP 71111.21N.04 001832 Age-Related Degradation CyberSecurity - RBS
1 9/28/2025 10/3/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - RB
1 9/29/2025 10/3/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
10/20/2025 10/24/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Prepared on 2/26/2025 10:56:35 AM 2 of 3
Site Inspection Activity Plan RBS 2025 INITIAL EXAM
1 10/19/2025 10/25/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
11/16/2025 11/22/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
1 2/2/2026 2/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2/2/2026 2/6/2026 IP 71124.04 000728 Occupational Dose Assessment
2/2/2026 2/6/2026 IP 71151 000746 Performance Indicator Verification Fire Protection Inspection - RBS
1 2/23/2026 3/6/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Security AA-AC-PIV-Plan Change
1 3/16/2026 3/20/2026 IP 71130.01 000733 Access Authorization
3/16/2026 3/20/2026 IP 71130.02 000734 Access Control
3/16/2026 3/20/2026 IP 71130.09 001656 Security Plan Changes
3/16/2026 3/20/2026 IP 71151 001338 Performance Indicator Verification In-Office Exercise Scenario Review (2026) - RBS
1 4/24/2026 5/23/2026 IP 71114.08 000723 Exercise Evaluation - Scenario Review EP Exercise & PI Inspection (2026) - RBS
1 6/22/2026 6/26/2026 IP 71114.01 000716 Exercise Evaluation
6/22/2026 6/26/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
6/22/2026 6/26/2026 IP 71151 001397 Performance Indicator Verification Security Protective Strategy (71130.05) and Target Sets (71130.14)
1 8/10/2026 8/14/2026 IP 71130.05 000737 Protective Strategy Evaluation
8/10/2026 8/14/2026 IP 71130.14 000743 Review of Power Reactor Target Sets RBS 2026 BRQ
1 8/30/2026 9/5/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security FFD
1 9/21/2026 9/25/2026 IP 71130.08 000740 Fitness-For-Duty Program RBS 2026 INITIAL EXAM
1 10/18/2026 10/24/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
11/29/2026 12/5/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Prepared on 2/26/2025 10:56:35 AM 3 of 3