Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement
Results
Other: ML21161A299, ML21203A314, ML21211A082, ML21214A178, ML21260A161, ML22013A339, ML22019A279, ML22061A056, ML22109A175, ML22164A861, ML22167A170, ML23188A020, ML23193A938, ML23200A183, ML23243A910
|
MONTHYEARML17310B2322017-11-0707 November 2017 Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017 Project stage: Meeting ML17310B2062017-11-20020 November 2017 Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 Project stage: Meeting ML18136A9052018-05-31031 May 2018 Summary of April 25, 2017, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of Exemption Requests to Support Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 Project stage: Meeting L-20-162, Supplemental Response to NRC Generic Letter 2004-022020-11-30030 November 2020 Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request 0CAN122001, Final Response to NRC Generic Letter 2004-022020-12-10010 December 2020 Final Response to NRC Generic Letter 2004-02 Project stage: Request ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) Project stage: RAI NL-21-0020, Final Supplemental Response to NRC Generic Letter 2004-022021-03-23023 March 2021 Final Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request DCL-21-034, Response to Request for Additional Information on Final Supplemental Response to Generic Letter 20042021-04-15015 April 2021 Response to Request for Additional Information on Final Supplemental Response to Generic Letter 2004 Project stage: Supplement ML21118A0072021-04-28028 April 2021 Final Response and Close-out to Generic Letter 2004-02 Project stage: Request PMNS20210610, Public Meeting Regarding Path Forward for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 22021-05-17017 May 2021 Public Meeting Regarding Path Forward for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 2 Project stage: Request ML21134A0232021-05-18018 May 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC (NextEra) Project stage: Request ML21147A1462021-05-27027 May 2021 Response to Request for Additional Information Regarding Generic Letter 2004-02 Project stage: Response to RAI ML21168A2612021-06-17017 June 2021 (Vcsns), Unit 1 - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors - Final Supplemental Response Project stage: Request ML21161A2992021-06-17017 June 2021 Summary of May 18, 2021 Public Webinar with Nextera Energy Point Beach, LLC Regarding Path Forward for Generic Letter 2004-02 Closure Project stage: Other ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 Project stage: RAI ML21203A3142021-07-29029 July 2021 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML21232A0402021-08-20020 August 2021 Notice of Teleconference with Entergy Operations, Inc. Concerning Final Response to Generic Letter 2004-02 at Arkansas Nuclear One, Units 1 and 2 Project stage: Meeting ML21252A3212021-08-20020 August 2021, 30 August 2021, 14 September 2021 ANO Meeting Summary for September 1, 2020 Public Meeting/Teleconference Project stage: Request ML21242A2792021-08-30030 August 2021 ANO Slides Presentation for 9-1-21 Public Meeting Project stage: Meeting ML21252A2662021-09-14014 September 2021 Summary of September 1, 2021, Teleconference Meeting with Entergy Operations, Inc. Concerning the Final Response to Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 Project stage: Meeting ML21211A0822021-09-24024 September 2021 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML21260A1612021-09-24024 September 2021 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other RA-21-0230, Duke Energy - Final Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2021-09-30030 September 2021 Duke Energy - Final Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request 0CAN102101, Final Request for Additional Information Concerning Generic Letter 2004-022021-10-0404 October 2021 Final Request for Additional Information Concerning Generic Letter 2004-02 Project stage: Request ML21214A1782021-10-0808 October 2021 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other PMNS20211455, Pre-Submittal Public Meeting Regarding License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 22021-12-0303 December 2021 Pre-Submittal Public Meeting Regarding License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Units 1 and 2 Project stage: Meeting ML21336A7972021-12-0909 December 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC - December 9, 2021 (Slides) Project stage: Request ML22019A2792022-01-20020 January 2022 Summary of Public Webinar with NextEra Energy Point Beach, LLC Regarding Future License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant Project stage: Other ML22019A2652022-01-27027 January 2022 Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B Project stage: Approval ML22013A3722022-01-27027 January 2022, 31 January 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML22013A3392022-01-31031 January 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22053A2402022-02-22022 February 2022 Final Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request ML22061A0562022-03-29029 March 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 Project stage: RAI ML22109A1752022-04-27027 April 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-022022-05-19019 May 2022 Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 Project stage: Supplement ML22164A8612022-06-24024 June 2022 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) Project stage: Draft RAI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 Project stage: RAI ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI Project stage: Request ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 Project stage: RAI ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML23200A1832023-08-0303 August 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 Project stage: RAI 2021-09-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] |
Text
September 14, 2021 LICENSEE: Entergy Operations, Inc.
FACILITY: Arkansas Nuclear One, Units 1 and 2
SUBJECT:
SUMMARY
OF SEPTEMBER 1, 2021, TELECONFERENCE MEETING WITH ENTERGY OPERATIONS, INC. CONCERNING THE FINAL RESPONSE TO GENERIC LETTER 2004-02 FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (EPID L-2017-LRC-0000)
On September 1, 2021, an observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc. (the licensee) via teleconference. The purpose of the meeting was to discuss and clarify the NRC staff's request for additional information (RAI) dated July 16, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21197A037), concerning the licensees final response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, at Arkansas Nuclear One, Units 1 and 2. The meeting notice and agenda dated August 20, 2021, are available in ADAMS under Accession No. ML21232A040. A list of attendees is provided in the enclosure.
The licensee presented information (ADAMS Accession No. ML21242A279) regarding its forthcoming RAI response. The presentation included an overview of the scope of the licensees proposed response. The licensee stated that it expects to submit the RAI response in mid-September 2021.
The NRC staff commented on the scope and level of detail for each of the proposed responses during the teleconference meeting. In some cases, the NRC staff requested that the licensee provide further elaboration to ensure that a complete response would be provided for staff evaluation. In particular, the NRC staff noted that the response to RAI-5 could be expanded to help the staff understand which unit fell under what test group in Volume 5 of WCAP-17788-P, Comprehensive Analysis and Test program for GSI-191 Closure. Also, the staff observed that a note could be included with the table in the response to RAI-5 to provide additional clarity of the information presented.
The NRC staff did not make any regulatory decisions or commitments at the meeting. No members of the public introduced themselves during the teleconference. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-4037, or via e-mail at Thomas.Wengert@nrc.gov.
/RA/
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368
Enclosure:
List of Attendees cc: Listserv
LIST OF ATTENDEES SEPTEMBER 1, 2021, TELECONFERENCE MEETING WITH ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 FINAL RESPONSE CONCERNING GENERIC LETTER 2004-02 U.S. Nuclear Regulatory Commission S. Smith, DSS1 A. Russell, DSS P. Klein, DNRL2 J. Dixon-Herrity, DORL3 T. Wengert, DORL Entergy Operations, Inc.
R. Gaston, Director, Regulatory Compliance R. Keele, Manager, Regulatory Assurance J. Kinder, Supervisor, Engineering A. Ramsay, Senior Engineer N. Mosher, Regulatory Assurance Specialist H. Li, Enercon (contractor)
D. Rodich, Enercon (contractor)
B. Stair, Enercon (contractor) 1 Division of Safety Systems 2
Division of New and Renewed Licenses 3
Division of Operating Reactor Licensing Enclosure
ML21252A321 (Package)
ML21252A266 (Meeting summary)
ML21242A279 (Presentation) *by e-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DSS/STSB/BC(A)*
NAME TWengert PBlechman NJordan DATE 9/10/2021 9/10/2021 9/10/2021 OFFICE NRR/DNRL/NCSG/BC* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME SBloom JDixon-Herrity TWengert DATE 9/13/2021 9/14/2021 9/14/2021