Letter Sequence Request |
---|
EPID:L-2022-LLA-0150, International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System (Approved, Closed) EPID:L-2022-LLE-0030, International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System (Approved, Closed) |
|
MONTHYEARML22050A0012022-02-18018 February 2022 International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22130A7052022-05-10010 May 2022 International - Resubmittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22161A0592022-06-0909 June 2022 International, Modification of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22161A0582022-06-0909 June 2022 International, Modification of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22235A1142022-08-25025 August 2022 Letter - Request for Additional Information for the Review of the Atb 1T Package - 2022 Project stage: RAI ML22235A1132022-08-25025 August 2022 RAIs for the Model No. HI-STAR Atb 1T Package Project stage: Request ML22235A1152022-08-25025 August 2022 Enc - 9375 RAI 2022 Project stage: RAI ML22285A1152022-10-0707 October 2022, 12 October 2022 Application for Technical Specification Change and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ML22285A1232022-10-12012 October 2022 Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 Project stage: Request ML22285A1252022-10-12012 October 2022 Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 2022 Project stage: Request ML22285A1222022-10-12012 October 2022 Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 Project stage: Request ML22285A1242022-10-12012 October 2022 Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 Project stage: Request ML22287A1392022-10-14014 October 2022 Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Other ML22287A1412022-10-14014 October 2022 Attachment 2 - HI-STAR Atb 1T Amendment Request 1 RAI Responses Project stage: Other ML22287A1432022-10-14014 October 2022 Attachment 4 - Safety Analysis Report on the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Other ML22287A1382022-10-14014 October 2022 Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Request ML22287A1462022-10-14014 October 2022 Affidavit of Kimberly Manzione Project stage: Other ML22305A6042022-11-0101 November 2022 International - Supplemental Information for Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Supplement ULNRC-06783, Enclosure 2: Affidavit for Withholding2022-11-16016 November 2022 Enclosure 2: Affidavit for Withholding Project stage: Other ML22335A4992022-11-16016 November 2022 Enclosure 1: Responses to Requested Information Project stage: Other ML22335A4972022-11-16016 November 2022, 1 December 2022 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ML22335A5012022-11-16016 November 2022 Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis Project stage: Other ML22322A0062022-11-17017 November 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) Callaway - LAR for Proposed Changes to TS and Exemption Request Use of Framatome Gaia Fuel - L-2022-LLA-0150 & L-2022-LLE-0030 Project stage: Acceptance Review ML22335A4982022-12-0101 December 2022 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Supplement ML22343A2612022-12-0909 December 2022 International - Submittal of Final SAR for HI-STAR ATB-1T Amendment 1 Project stage: Other ML22334A2642022-12-13013 December 2022 Enclosure 2 - Safety Evaluation Report Project stage: Approval ML22334A2612022-12-13013 December 2022 Certificate of Compliance No. 9375, Revision No. 1, for the Model No. HI-STAR ATB1T Package Project stage: Request ML22334A2632022-12-13013 December 2022 Enclosure 1 - Certificate of Compliance Rev. No. 1 Project stage: Other ML22334A2622022-12-13013 December 2022 Cover letter- Certificate of Compliance No. 9375, Revision No. 1, for the Model No. HI-STAR ATB1T Package Project stage: Other ML22348A1162022-12-21021 December 2022 Acceptance of Requested Licensing Actions Application for License Amendment & Regulatory Exemptions for TS Change & Exemption Request Regarding Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150 & EPID L-2022-LLE-0030) Project stage: Acceptance Review ML23068A3772023-03-20020 March 2023 Regulatory Audit Plan and Setup of Online Reference Portal for License Amendment Request and Exemption for Fuel Transition to Framatome Gaia Fuel (EPID L-2022-LLA-0150 and EPID L-2022-LLE-0030) - Nonproprietary Project stage: Other ML23107A1812023-04-17017 April 2023 NRR E-mail Capture - Regulatory Audit Questions - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 Project stage: Approval ML23114A2302023-04-24024 April 2023 NRR E-mail Capture - Regulatory Audit Question - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 Project stage: Approval ULNRC-06808, Affidavit2023-04-27027 April 2023 Affidavit Project stage: Other ML23129A7932023-04-27027 April 2023, 9 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) Project stage: Request ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML23129A7972023-05-0909 May 2023 Response to Audit Questions Project stage: Other ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) Project stage: Supplement ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) Project stage: Request ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Supplement ML23215A1962023-08-0303 August 2023, 31 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML23215A1992023-08-31031 August 2023 ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 Project stage: Request ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) Project stage: Other ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) Project stage: Approval ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) Project stage: Approval ML23234A1532023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Exemption) Project stage: Approval ML23234A1542023-10-11011 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (FRN) Project stage: Approval 2022-08-25
[Table View] |
|
---|
Category:Letter type:ULNRC
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06812, Submittal of 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ULNRC-06806, Submittal of Radiological Emergency Response Plan, Revision 552023-04-12012 April 2023 Submittal of Radiological Emergency Response Plan, Revision 55 ULNRC-06807, Submittal of Single Positive Test Forms2023-04-0303 April 2023 Submittal of Single Positive Test Forms ULNRC-06798, Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan2023-03-30030 March 2023 Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan ULNRC-06801, CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions2023-03-30030 March 2023 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06804, Submittal of Nuclear Property Insurance Reporting2023-03-29029 March 2023 Submittal of Nuclear Property Insurance Reporting ULNRC-06751, Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control2023-03-29029 March 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control ULNRC-06803, Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection2023-03-29029 March 2023 Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ULNRC-06805, Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days2023-03-21021 March 2023 Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days ULNRC-06802, Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument2023-03-0909 March 2023 Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument ULNRC-06795, Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms2023-01-24024 January 2023 Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms ULNRC-06794, Submittal of Fitness for Duty Program Data for 20222023-01-24024 January 2023 Submittal of Fitness for Duty Program Data for 2022 ULNRC-06787, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06781, License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2022-12-0101 December 2022 License Amendment Request to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06780, Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0072022-11-30030 November 2022 Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-007 ULNRC-06772, 10 CFR 50.59 and 10 CFR 72.48 Summary Report2022-11-23023 November 2022 10 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06777, Operating Quality Assurance Manual (Oqam) Revision 362022-11-16016 November 2022 Operating Quality Assurance Manual (Oqam) Revision 36 ULNRC-06779, ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves2022-11-14014 November 2022 ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves ULNRC-06765, License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Testing Frequencies (LDCN 2020-0004)2022-11-0303 November 2022 License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Testing Frequencies (LDCN 2020-0004) ULNRC-06773, Results of Steam Generator Tube In-Service Inspection2022-11-0101 November 2022 Results of Steam Generator Tube In-Service Inspection ULNRC-06775, Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days2022-10-27027 October 2022 Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days ULNRC-06771, Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013)2022-10-25025 October 2022 Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013) ULNRC-06770, Cycle 25 Commitment Change Summary Report2022-10-19019 October 2022 Cycle 25 Commitment Change Summary Report ULNRC-06766, Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014)2022-09-0808 September 2022 Correction of Text Contained in Enclosures Provided with Supplements to Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014) ULNRC-06767, Presentation Information for Pre-Application Meeting Regarding New License Amendment Request for Use of Framatome Fuel Assemblies2022-09-0606 September 2022 Presentation Information for Pre-Application Meeting Regarding New License Amendment Request for Use of Framatome Fuel Assemblies ULNRC-06764, Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-09-0101 September 2022 Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06763, Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013)2022-09-0101 September 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013) ULNRC-06762, Submittal of Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 252022-08-25025 August 2022 Submittal of Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 25 ULNRC-06758, Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002)2022-08-0404 August 2022 Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002) ULNRC-06755, Response to Requests for Additional Information for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals2022-07-13013 July 2022 Response to Requests for Additional Information for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications2022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ULNRC-06739, Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007)2022-06-30030 June 2022 Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007) ULNRC-06752, Evacuation Time Estimates Report2022-06-27027 June 2022 Evacuation Time Estimates Report ULNRC-06753, Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis2022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ULNRC-06750, Submittal of Cycle 26 Core Operating Limits Report (COLR)2022-06-13013 June 2022 Submittal of Cycle 26 Core Operating Limits Report (COLR) ULNRC-06735, Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014).2022-05-27027 May 2022 Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014). 2024-01-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ML23156A6372023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23129A7972023-05-0909 May 2023 Response to Audit Questions ML23088A1322023-03-29029 March 2023 Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ML23052A0442023-02-21021 February 2023 Enclosure 2 - Supplement to License Amendment Request ML23052A0422023-02-21021 February 2023 Response to Request for Additional Information and Supplement to License Amendment Request Regarding Spent Fuel Storage (LDCN 22-0015) ML23052A0432023-02-21021 February 2023 Enclosure 1 - Response to Request for Additional Information ML22342B2662022-12-0808 December 2022 Enclosure - Ameren Missouri Response to NRC RAIs ML22335A4992022-11-16016 November 2022 Enclosure 1: Responses to Requested Information ML22244A1692022-09-0101 September 2022 Updated Response to RAT HFE-l ML22194A8032022-07-13013 July 2022 Enclosure 2: Ameren Missouri Verification Ofagreement Letters with State and EPZ Counties for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ML22194A8022022-07-13013 July 2022 Enclosure 1: Ameren Missouri Response to NRC Requests for Additional Information ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications2022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ML22186A1052022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ML22146A3392022-05-26026 May 2022 Enclosure 1: Ameren Missouri Response to NRC RAIs ML22068A0292022-03-0808 March 2022 Response to Audit Question/Item 23 in NRC Letter Dated September 14, 2021 ML21286A6822021-10-13013 October 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ULNRC-06629, Response to Request for Additional Information Pertaining to Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2021-01-0707 January 2021 Response to Request for Additional Information Pertaining to Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ULNRC-06602, Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 -2020-09-0202 September 2020 Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 - ML20238C1072020-08-25025 August 2020 Response to Request for Additional Information (Redacted) ULNRC-06591, Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.12020-07-10010 July 2020 Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.1 ML19325D6732019-11-21021 November 2019 Attachment 2 - Callaway Energy Center Seismic Probabilistic Risk Assessment in Response to 50.54(F) Letter with Regard to NTTF 2.1 Seismic - Supplemental Information ML19051A1372019-02-20020 February 2019 Attachment 1: Response to Request for Additional Information ULNRC-06482, Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2019-02-0808 February 2019 Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ML19039A3542019-02-0808 February 2019 RAI Questions and Responses ML19025A0712019-01-25025 January 2019 Response to Request for Additional Information Pertaining to Relief Request 14R-05 for Relief from Requirements of ASME Code Case N-770-2 Regarding Inspection Intervals for Reactor Vessel Nozzle Dissimilar Metal Welds ULNRC-06479, Attachment a - Mitsubishi Responses to NRC Wjp RAIs2019-01-25025 January 2019 Attachment a - Mitsubishi Responses to NRC Wjp RAIs ULNRC-06440, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information2018-05-31031 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information ULNRC-06410, Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001)2018-02-0505 February 2018 Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001) ML18036A6762018-02-0505 February 2018 Enclosure 6: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 21) ML18036A6742018-02-0505 February 2018 Enclosure 5: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 20) ML18036A6732018-02-0505 February 2018 Enclosure 4: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 19) ML18036A6722018-02-0505 February 2018 Enclosure 3: Response to Request for Additional Information (RAI) 1.c ULNRC-06410, Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001)2018-02-0505 February 2018 Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001) ML18036A6692018-02-0505 February 2018 Enclosure 1: Responses to Requests for Additional Information ML18036A6712018-02-0505 February 2018 Enclosure 2: Response to Request for Additional Information (RAI) Item 1.a ULNRC-06381, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2017-10-0303 October 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML17138A2132017-05-18018 May 2017 Response to Request for Additional Information Concerning Revision of TS 5.6.5, Core Operating Limits Report (Colr), to Allow the Use of the Paragon and Nexus Core Design Methods (LDCN 16-0011) ULNRC-06357, Response to Request for Additional Information, 2016 Steam Generator Tube Inspections2017-03-23023 March 2017 Response to Request for Additional Information, 2016 Steam Generator Tube Inspections ULNRC-06321, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-082016-07-0707 July 2016 Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-08 ULNRC-06275, Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-0022016-01-12012 January 2016 Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-002 ULNRC-06266, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection, Request for Relief No. 13R-112015-11-24024 November 2015 Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection, Request for Relief No. 13R-11 ULNRC-06238, Response to Supplemental Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 62015-08-31031 August 2015 Response to Supplemental Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 6 ULNRC-06230, Response to Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 62015-07-16016 July 2015 Response to Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 6 ULNRC-06233, Submittal of Requested Information on FSAR Section 3.1.2., Per July 9, 2015 Telephone Call2015-07-13013 July 2015 Submittal of Requested Information on FSAR Section 3.1.2., Per July 9, 2015 Telephone Call ULNRC-06227, Response to Request for Additional Information Related to License Amendment Request for Emergency Action Level Upgrade Adopting NRC-Endorsed NEI 99-01, Rev 62015-07-0606 July 2015 Response to Request for Additional Information Related to License Amendment Request for Emergency Action Level Upgrade Adopting NRC-Endorsed NEI 99-01, Rev 6 2023-08-17
[Table view] |
Text
Iliiieren Callaway Plant MISSOURI June 21, 2023 ULNRC-0682 1 U.S. Nuclear Regulatory Commission AUn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.90 Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 POST-AUDIT FOLLOW-UP INFORMATION IN SUPPORT OF CALLAWAYS LICENSE AMENDMENT REQUEST AND PROPOSED EXEMPTION TO ALLOW USE OF FRAMATOME GAlA FUEL (LDCN 22-0002)
[EPID L-2022-LLA-0150 AND EPID L-2022-LLE-00301
References:
Provided on Page 3.
In the letter identified in Reference 1, Union Electric Company (Ameren Missouri) submitted an application for amendment and exemption request to Renewed Facility Operating License Number NPF-30 for the Callaway Plant, Unit 1 (Callaway). The requested amendment and exemption request would allow use of a limited number of Framatome GAlA fuel assemblies at Callaway. In the letter identified in Reference 2, Ameren Missouri provided its first supplement to the application for amendment (and exemption request). That supplement provided information needed to support acceptance of the requested license amendment and regulatory exemption. In the letter identified in Reference 3, Ameren Missouri provided an additional supplement which provided information requested by the NRC resulting from the audit described in References 4, 5 and 6. This letter provides additional clarifying information requested by the NRC as a result of its review of the information presented in References 1 and 3.
The information provided in the enclosure to this letter has no impact on the changes requested and described in the LAR (Reference 1). As such, the information does not change the No Significant Hazards Consideration conclusions reached in the LAR, nor does it change the conclusion regarding no need for an environmental assessment based on the categorical exclusion provisions of 10 CFR 51.22.
8315 County Road 459 Steedman, MO 65077 AmerenMissouri.com
ULNRC-0682 1 June 21, 2023 Page 2 of 5 This letter does not contain new commitments.
If there are any questions, please contact Tom Elwood, Supervisor Regulatory Affairs and Licensing, at 314-225-1905.
I declare under penalty ofperjury that the foregoing is true and correct.
Brent L.
Senior Director, Nuclear Engineering Executed on:
Enclosure:
Audit Follow-up Questions and Responses
ULNRC-0682 1 June 21, 2023 Page 3 of 5
References:
1 . Ameren Missouri letter ULNRC-06768, Application for Technical Specification Change and Exemption Request Regarding Use of Framatome GAlA Fuel (LDCN 22-002), dated October 12, 2022 (ADAMS Accession No. ML22285A115)
- 2. Ameren Missouri letter ULNRC-06783, Supplement to License Amendment and Exemption Request Regarding Use of Framatome GAlA Fuel (LDCN 22-002) (EPID L-2022-LLA-0150 and L-2022-LLE-0030), dated December 1, 2022 (ADAMS Accession No. ML22335A498)
- 3. Ameren Missouri letter ULNRC-06808, Post Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome GAlA Fuel (LDCN 22-0002) [EPID L-2022-LLA-0150 and EPID L-2022-LLE-0030J, dated May 9, 2023 (ADAMS Accession No. ML23129A794)
- 4. NRC letter Callaway Plant, Unit No. 1 Regulatory Audit Plan and Setup of Online Reference Portal for License Amendment Request And Exemption For Fuel Transition To Framatome GAlA Fuel (EPID L-2022-LLA-0150 AND EPID L-2022-LLE-0030), dated March 20, 2023 (ADAMS Accession No. ML23068A375)
- 5. NRC email Regulatory Audit Questions Callaway LAR And Exemption For Fuel Transition To Framatome GAlA Fuel EPIDs L-2022-LLA-0150 and L-2022-LLE-0030, dated April 17, 2023 (ADAMS Accession No. ML23107A181)
- 6. NRC email Regulatory Audit Question Callaway LAR And Exemption For Fuel Transition To Framatome GAlA Fuel EPIDs L-2022-LLA-0150 and L-2022-LLE-0030, dated April 24, 2023 (ADAMS Accession No. ML23114A230)
ULNRC-0682 1 June 21, 2023 Page 4 of 5 cc: Mr. Robert Lewis Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mahesh Chawla Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001
ULNRC-0682 1 June 21, 2023 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6500 West Freeway, Suite 400 FortWorth,TX 76116
( Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
F. M. Diya K. C. Scott W. A. Witt B. L. Jungmann T. A. Witt T. B. Elwood B. D. Richardson J. W. Knaup I. W. Vinyard NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Ms. Claire Eubanks (Missouri Public Service Commission)
Mr. Aaron Schmidt (DNR) to ULNRC-06821 Page 1 of5 ENCLOSURE 1 AUDIT FOLLOW-UP QUESTIONS AND RESPONSES to ULNRC-06821 Page 2 of 5 AUDIT FOLLOW-UP QUESTIONS AND RESPONSES References are provided at the end ofthis enclosure.
By application dated October 12, 2022 (Reference 1), as supplemented by letter dated December 1 2022 (Reference 2), Union Electric Company, doing business as Ameren Missouri, submitted a license amendment request (LAR) and exemption request for Callaway Plant, Unit No. 1 (Callaway). The proposed amendment would revise the Technical Specifications (TSs) to allow use ofFramatome GAlA fuel with MS as a fuel cladding material. Since the Framatome GAlA fuel will use MS fuel rod cladding, a Title 10 of the Code offederal Regulations (1 0 CFR) Section 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, and 1 0 CFR Part SO Appendix K, ECC$ [Emergency Core Cooling $ystemJ Evaluation Models, exemption request is included as part ofthis EAR. Callaway is proposing to load a limited number of Framatome GAlA fuel assemblies starting in operating cycle 27 to obtain in-core performance data and acquire operational experience associated with the GAlA fuel design.
Subsequent to NRC acceptance of the LAR, the NRC performed an audit which was conducted April 3 through 20, 2023. The NRC questions/requests to be addressed during the audit were provided in a letter dated March 20, 2023 (Reference 3). In addition, the NRC requested via Emails dated April 17, 2023, (Reference 4) and April 24, 2023, (Reference 5) that responses be provided to additional questions discussed during a call held on April 20, 2023 At the conclusion of the audit activities, the NRC requested that Ameren Missouris responses to selected questions from the audit be transmitted via a letter which was subsequently provided by Reference 6. Following review ofthe responses provided in Reference 6, a call was held on June 8, 2023 during which the NRC requested that additional information be provided regarding four items. The additional information is provided below.
Item 1 In the letter identified as Reference 6, Union Electric Company (Ameren Missouri) submitted a supplement to its license amendment request (Reference 1) seeking approval to use Framatome GAlA fuel. The supplement provided information requested by the NRC resulting from an audit conducted April 3 through 20, 2023. During the staffs review of the information provided in Reference 6, it was identified that reference to a section in the Final Safety Analysis Report (FSAR) was incorrect.
Ameren Missouri Response:
On page 23 of47 in Enclosure 1 to Reference 6, reference was made to FSAR section 6.3. 1 1 The response should have provided reference to FSAR section 6.3A. 1 1 as provided in Enclosure 2 of Reference 8. As described in Attachment 2-S of Enclosure 2 of Reference 8, text is being added to the FSAR as new Appendix 6.3A to describe the evaluations performed to address GSI-191, which are described in the Reference 8 license amendment request and its subsequent correspondence. The NRC approved Callaways GSI-191 resolution license amendment request, as documented in Reference 9.
to ULNRC-06821 Page 3 of 5 Item 2 Regarding Table 5-1 8, Uncontrolled RCCA Bank Withdrawal at Power: Results, contained in Reference 7, provide the following:
additional explanation ofhow the 10% RTP BOC MDNBR value is the bounding condition given that it is numerically larger than other MDNBR values presented in the table.
the deterministically derived MDNBR value and the basis for its replacement with the statistically derived value shown in the table.
Ameren Missouri Response:
Page 40 of Reference 1 0 lists the deterministic MDNBR of the BOC I O%RTP case as 1.088.
This deterministic value constitutes the limiting case when compared to the other cases presented in Table 5-18 ofReference 7. Because this deterministic value was below the MDNBR limit, a statistical analysis was performed, resulting in the acceptable value listed in Table 5-1 8 of Reference 7 of 1.228.
Item 3 Regarding Table 5-18, Uncontrolled RCCA Bank Withdrawal at Power: Results, contained in Reference 7, provide the following:
elaborate on the meaning of overall power used in Note 2 ofthe table.
a brief explanation for how the limiting PLHGR [peak linear heat generation ratej was selected.
Ameren Missouri Response:
Section 7.3, PLHGR, on page 42 of Reference 10 shows the calculation for the PLHGR.
The only input that varies between the cases analyzed is the peak transient power. The paragraph following Table 7-3, PLHGR Inputs for UCBW, elaborates that the power identified is the kinetic power (not the heat flux). All cases analyzed were examined, and those where the reactivity insertion rate was less than or equal to 50 pcm/s (consistent with the cycle-to-cycle check in Appendix B of Reference 1 1 table note c) were sorted. One of the BOC 10% RTP cases resulted in a peak transient kinetic power of 146.2% RTP, which is what is used in the calculation shown on page 42 of Reference 10. The wording ofthe power described in Note 2 to Table 5- 1 8 in Reference 7 can be clarified from overall power to overall peak transient kinetic power.
Question 4 Regarding Section 5.2 1 Uncontrolled RCCA Bank Withdrawal at Power (FSAR SP 15.4.2), in Reference 7, it is observed that the text appears to use critical heat flux (CHF) and departure from nucleate boiling (DNB) interchangeably. Is there a reason for the different usage?
Ameren Missouri Response:
The terms CHF and DNB and their associated limits are used interchangeably in this section of Reference 7.
to ULNRC-06821 Page 4 of 5 REFERENCES I . Ameren Missouri letter ULNRC-06768, Application for Technical Specification Change and Exemption Request Regarding Use of Frarnatome GAlA Fuel (LDCN 22-0002), ADAMS Accession No. ML22285A115, October 12, 2022.
- 2. Ameren Missouri letter ULNRC-06783, Supplement to License Amendment Request and Exemption Request Regarding Use of Framatome GAlA Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and L-2022-LLF-0030), ADAMS Accession No. ML22335A498, December 1, 2022.
- 3. NRC Letter from Mahesh Chawla (NRC) to Fadi Diya (Ameren), Callaway Plant, Unit No. 1 Regulatory Audit Plan and Setup ofOnline Reference Portal for License Amendment Request and Exemption for Fuel Transition to Framatome GAlA Fuel (EPID L-2022-LLA-0150 and EPID L-2022-LLE-0030), ADAMS Accession No. ML23068A375, March 20, 2023.
- 4. NRC Letter from Mahesh Chawla (NRC) to Thomas Elwood (Ameren), Regulatory Audit Questions Callaway LAR and Exemption for Fuel Transition to Framatome GAlA Fuel EPIDs L-2022-LLA-0150 and L-2022-LLE-0030, ADAMS Accession No. ML23107A181, April 17. 2023.
- 5. NRC Letter from Mahesh Chawla NRC) to Thomas Elwood (Ameren), Regulatory Audit Question Callaway LAR and Exemption for Fuel Transition to Framatome GAlA Fuel EPIDs L-2022-LLA-0150 and L-2022-LLE-0030, ADAMS Accession No. ML23114A230, April 24, 2023.
- 6. Ameren Missouri letter ULNRC-06808. Post Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome GAlA Fuel (LDCN 22-0002) [EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301, ADAMS Accession No. ML23 I 29A794, May 9, 2023.
- 7. Framatome Inc. Licensing Report ANP-3969(P), Revision 2, Callaway Non-LOCA Summary Report, October 2022 (included as Attachment 12 to Enclosure 1 in Reference 1).
- 8. Ameren Missouri letter ULNRC-06526, Request for License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 (LDCN 19-0014), ADAMS Accession No. ML21090A185, March 31, 2021.
- 9. NRC letter Callaway Plant, Unit No. 1 Issuance ofAmendment No. 22$ Re:
Revise Technical Specifications to Address Generic Safety Issue-19l and Respond to Generic Letter 2004-02 Using a Risk-Informed Approach (EPID L-2021-LLA-0059), ADAMS Accession No. ML22220A132, October 21, 2022.
to ULNRC-06821 Page 5 of 5
- 10. FS1-0058737, Callaway 15.4.2 (Uncontrolled Bank Withdrawal at Power)
DNB/PLHGR Analysis, Revision 2, September 2022.
1 1. fS1-0052700, Callaway VQP Uncontrolled Bank Withdrawal at Power Analysis, Revision 1.0, September 2021.