ML23205A093
Letter Sequence Other | |
---|---|
EPID:L-2022-DOT-0007, E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package (Approved, Closed) EPID:L-2022-DOT-0008, Email Dated 8/18/22 from Rboyle (DOT) to Ngarcia Santos (Nrc), Subject: FCC4 - Request for Review and Recommendation (Approved, Closed) | |
Administration Results Other: ML22271A186, ML22271A189, ML22271A190, ML22271A450, ML22271A452, ML22271A454, ML22271A455, ML22271A458, ML22271A460, ML22271A461, ML22271A463, ML22271A465, ML22271A466, ML22271A468, ML22271A470, ML22271A471, ML22271A472, ML22271A474, ML22271A476, ML22271A477, ML22271A479, ML22271A481, ML22271A482, ML22271A484, ML22271A486, ML22271A487, ML22271A636, ML22271A637, ML22271A638, ML22271A639, ML22271A640, ML22271A641, ML22271A642, ML22271A643, ML22271A644, ML22271A645, ML22271A646, ML22271A647, ML22271A648, ML22271A649, ML22271A650, ML22271A675, ML22271A677, ML22271A678, ML22271A686, ML22271A688, ML22271A790, ML22271A791, ML22271A792, ML22271A793... further results | |
MONTHYEARML22277A7611998-08-19019 August 1998
[Table View]E-61285, Enclosure 4, 009h1 Appendix 2.1-8, Document No. TFXDC2108, Modified RCC Container - Proto 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A6411998-08-19019 August 1998 E-61283 Enclosure 4, 009h1 Ap 2.1-8 TFXDC2108EN Npv, Revision B, Modified RCC Container - Proto 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A6392004-05-0404 May 2004 E-61283 Enclosure 4, 009G1 AP 2.1-7 TFXEDC2104-NPV, Rev. E, Modification of FCC Containers Choice of Prototype 2 Drop Configurations for Regulatory Tests (Public) Project stage: Other ML22277A7592004-05-0505 May 2004 E-61285, Enclosure 4, 009g1 Appendix 2.1-7, Document No. TFXEDC2104, Revision E, Modification of RCC Containers Choice of Prototype 2 Drop Configurations for Regulatory Tests (Public) Project stage: Other ML22277A7832004-10-29029 October 2004 E-61285, Enclosure 4, 013c1 Appendix 2.5-3, Document No. FF/DC/01106 E0, Revision a, Safety/Criticality Study of FCC3v2 Containers 14 X 14 8 Foot and 14 X 14 10 Footassemblies (FCC-3/FCC-4) (Public) Project stage: Other ML22271A8002004-10-29029 October 2004 E61283, Enclosure 4, 013c1 Appendix 2.5-3, Document No. FF/DC/01106 Revision a, E0, Safety/Criticality Study of FCC3v2 Containers 14 X 14 8 Foot and 14 X 14 10 Foot Assemblies (Public) Project stage: Other ML22277A7852007-12-19019 December 2007 E-61285, Enclosure 4, 013d1 Appendix 2.5-4, Document No. FF/DC/04191, Revision B, Safety/Criticality Study for FCC4 Packages & 17x17XL Assemblies Justification for an Increased Cavity Cross Section (Public) Project stage: Other ML22271A8022007-12-19019 December 2007 E61283, Enclosure 4, 013d1 Appendix 2.5-4, FF DC 04191, Revision B, Safety/Criticality Study for FCC4 Packages & 17x17XL Assemblies Justification for an Increased Cavity Cross Section (Public) Project stage: Other ML22271A6462009-01-0101 January 2009 E-61283 Enclosure 4, 009c1 Ap 2.1-3 Document No. NTC-08-00135891E-NPV, Revision No. 01E, Analysis of the Fatigue Strength of the FCC3/FCC4 Containers (Public) Project stage: Other ML22277A7512009-01-0101 January 2009 E-61285, Enclosure 4, 009c1 Ap 2.1-3 Document No. NTC-08-00135891E-NPV, Revision 01E, Analysis of the Fatigue Strength of the FCC3/FCC4 Containers (Public) Project stage: Other ML22271A4702009-05-0101 May 2009 E-61283 Enclosure 4, 009a1 Appendix 2.1-1, FFDC05090-A EN Npv, FCC3 Containers - Lashing Diagrams (Public) Project stage: Other ML22277A7732009-06-27027 June 2009 E-61285, Enclosure 4, 010d1 Appendix 2.2-4, Document No. NTC-08-00118662E-NPV, Revision 1E, Note on the Characterization of Resin Fs 69 (Public) Project stage: Other ML22271A8162009-06-27027 June 2009 E-61283 Enclosure 4, 010d1 Appendix 2.2-4, NTC-08-00118662E-NPV, Rev. 1E, Note on the Characterization of Resin Fs 69 Project stage: Other ML22271A6442010-07-0101 July 2010 E-61283 Enclosure 4, 009b1 Ap 2.1-2 F2, Document No. NEEL-F 2008 DC 117EN, Revision B, FCC3 Containers for Fresh Fuel Assemblies Data for the Fatigue Strength Analysis of the Lifting Boxes and Upper Shell (Public) Project stage: Other ML22277A7492012-01-18018 January 2012 E-61285, Enclosure 4, 009b1 Appendix 2.1-2, Document No. NEEL-F 2008 DC 118, Revision B E1 (Npv), FCC4 Containers for Fresh Fuel Assemblies Data for the Fatigue Strength Analysis of the Lifting Boxes and Upper Shell (Public) Project stage: Other ML22277A7602012-04-0202 April 2012 E-61285, Enclosure 4, 009h Appendix 2.1-8, Document No. DOS-13-00081778-108-NPV, Revision 00, Reference to Tfx DC 2108, Revision B, Modified RCC Container - Prototype 2 - Regulatory Test Programme (FCC-3 - FCC-4) (Public) Project stage: Other ML22277A7582012-04-0202 April 2012 E-61285, Enclosure 4, 009g Appendix 2.1-7, Document No. DOS-13-00081778-107-NPV, Revision 00, Reference to Tfxedc 2104, Revision E, Modification of RCC Containers - Selection of Drop Configurations for Prototype 2 in the Context of Regulato Project stage: Other ML22277A7722012-04-0202 April 2012 E-61285, Enclosure 4, 010d Appendix 2.2-4, Document No. DOS-13-00081778-204-NPV, Revision 00, Reference to 10373-B-1, Revision 3, Summary Note on the Characterisation of Fs 69 Resin (FCC-3 - FCC-4) (Public) Project stage: Other ML22277A7822012-04-0202 April 2012 E-61285, Enclosure 4, 013c Appendix 2.5-3, Document No. DOS-13-00081778-503-NPV, Revision 00, Reference to Ffdc 01106, Revision a, Criticality-safety Analysis of FCC3 Containers Version 2-Assembly Types 14x14 8-foot and 14x14 10-ft (FCC-3/F Project stage: Other ML22277A7382012-04-0202 April 2012 E-61285 Enclosure 4, 003d Appendix 1.4-4, Document No. DOS-13-00081778-044-NPV, Rev. 00, Reference to Photographs_FCC4, Rev. 0, Photographs of the FCC4 Package (Public) Project stage: Other ML22277A7972012-04-0202 April 2012 E-61285 Enclosure 4, 002d Appendix 1.3-4, Document No. DOS-13-00081778-034-NPV, Rev. 00, Reference to SQ/95/602PBO/CC, Revision 0,, Leaching Tests on Enriched Reprocessed Uranium (Eru) Pellets (Public) Project stage: Other ML22271A8152012-04-0202 April 2012 E-61283 Enclosure 4, 010d Appendix 2.2-4 DOS-13-00081778-204-NPV, Rev. 00, Reference to 10373-B-1, Revision 3, Summary Note on the Characterization of Fs 69 Resin Project stage: Other ML22277A7632012-04-0202 April 2012 E-61285, Enclosure 4, 009j Appendix 2.1-10, Document No. DOS-13-00081778-110-NPV, Revision 00, Reference to Tfxe DC 2132, Revision B, Container Prototype No. 2 – Drop Test Report (FCC-3 - FCC4) (Public) Project stage: Other ML22277A7482012-04-0202 April 2012 E-61285, Enclosure 4, 009b Appendix 2.1-2, Document No. DOS-13-00081778-102-NPV, Rev 00, Reference to NEEL-F 2008 DC 118, Rev. B, FCC4 Containers for Fresh Fuel Assemblies – Data for Fatigue Resistance Analysis of Lifting Boxes and Upper Sh Project stage: Other ML22277A7622012-04-0202 April 2012 E-61285, Enclosure 4, 009i Appendix 2.1-9, Document No. DOS-13-00081778-109-NPV, Revision 00, Reference to Tfx DC 2087, Revision a, Container Prototype n°1 – Drop Test Report (FCC-3 - FCC-4) (Public) Project stage: Other ML22271A4792012-04-30030 April 2012 E-61283 Enclosure 4, 002b Ap 1.3-2 DOS-13-00081779-032-NPV, Revision 00, Appendix 1.3-2 - Drawing of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A4712012-04-30030 April 2012 E-61283 Enclosure 4, 009b Appendix 2.1-2, Document No. DOS-13-00081779-102-NPV, Revision 00, FCC3 Containers for Fresh Fuel Assemblies – Data for Fatigue Resistance Analysis of Lifting Boxes and Upper Shell (Public) Project stage: Other ML22271A6432012-04-30030 April 2012 E-61283 Enclosure 4, 009j Ap 2.1-10 DOS-13-00081778-110-NPV, Revision 00, Container Prototype No. 2, Drop Test Report (Public) Project stage: Other ML22271A6422012-04-30030 April 2012 E-61283 Enclosure 4, 009i Ap 2.1-9 DOS-13-00081778-109-NPV, Revision 00, Container Prototype No. 1, Drop Test Report (Public) Project stage: Other ML22271A4842012-04-30030 April 2012 E-61283 Enclosure 4, 002d Appendix 1.3-4, Document No. DOS-13-00081778-034-NPV, Revision 00, Appendix 1.3-4 - Test Report Leaching of Enriched Reprocessed Uranium (Eru) Pellets (Public) Project stage: Other ML22271A6402012-04-30030 April 2012 E-61283 Enclosure 4, 009h Ap 2.1-8 DOS-13-00081778-108-NPV, Revision 00, Modified RCC Container - Prototype 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A4542012-04-30030 April 2012 E-61283 Enclosure 4, 003d Appendix 1.4-4, Document No. DOS-13-00081779-044-NPV, Revision 00, Table of Contents, Photographs of the FCC3 Package (Public) Project stage: Other ML22271A4522012-04-30030 April 2012 E-61283 Enclosure 4, 003c Appendix 1.4-3, Document No. DOS-13-00081778-043-NPV, Revision 00, Table of Contents, Summary of Toughness Tests Project stage: Other ML22271A4772012-04-30030 April 2012 E-61283 Enclosure 4, 002a Appendix 1.3-1,Document No. DOS-13-00081779-031-NPV, Revision 00, Appendix 1.3-1 - Description of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A6382012-04-30030 April 2012 E-61283 Enclosure 4, 009g Ap 2.1-7 DOS-13-00081778-107-NPV, Modification of RCC Containers - Selection of Drop Configurations for Prototype 2 in the Context of Regulatory Tests (Public) Project stage: Other ML22271A4682012-04-30030 April 2012 E-61283 Enclosure 4, 009a Appendix 2.1-1, Document No. DOS-13-00081779-101-NPV, Revision 00, Table of Contents, FCC3 Containers - Tie-down Diagrams, Areva (Public) Project stage: Other ML22271A8012012-09-0303 September 2012 E61283, Enclosure 4, 013d Appendix 2.5-4 (FCC3-FCC4), DOS-13-00081778-504-00-NPV, Rev. 00, Reference to Ffdc 04191, Rev. B, Safety/Criticality Study for FCC4 Packages and 17x17 Xl Assemblies Justification for an Increased Cavity Cross Secti Project stage: Other ML22277A7842012-09-0303 September 2012 E-61285, Enclosure 4, 013d Appendix 2.5-4, Document No. DOS-13-00081778-504-NPV, Rev. 00, Reference to Ffdc 04191, Rev. B, Safety/Criticality Study for FCC4 Packages, 17x17 Xl Assemblies Justification for an Increased Cavity Cross (FCC-3/FC Project stage: Other ML22271A4502012-09-30030 September 2012 E-61283 Enclosure 4, 003b Appendix 1.4-2. Document No. DOS-13-00081779-042-NPV, Revision 1, Drawings of the FCC3 Package, Version 2 (Public) Project stage: Other ML22271A6452013-04-30030 April 2013 E-61283 Enclosure 4, 009c Ap 2.1-3, Document No. DOS-13-00081778-103-NPV, Revision 00, Analysis of the Fatigue Behaviour of FCC3/FCC4 Containers, Tn International Document (Public) Project stage: Other ML22277A7472015-06-0909 June 2015 E-61285, Enclosure 4, 009a1 Ap 2.1-1 Document No. FFDC05091, Revision B (Npv, English), FCC-4 Lashing Diagrams (Public) Project stage: Other ML22277A7742015-12-0101 December 2015 E-61285, Enclosure 4, 010e Appendix 2.2-5, Document No. DOS-13-00081778-205-NPV, Revision 00, Analysis of the Impact of Glycerine on the Thermal Safety Analyses (FCC-3 - FCC-4) (Public) Project stage: Other ML22271A7902016-03-31031 March 2016 E-61283 Enclosure 4, 010e Appendix 2.2-5, Document No. DOS-13-00081778-205-NPV, Revision 00, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes (Public) Project stage: Other ML22277A7662016-09-0101 September 2016 E-61285, Enclosure 4, 009m Appendix 2.1-13, Document No. DOS-13-00081778-113-NPV, Revision 2, Complementary Analysis of FCC Package Behaviour in Accidental Drop Conditions (FCC-3 - FCC-4) (Public) Project stage: Other ML22271A8092017-09-0101 September 2017 E-61283 Enclosure 4, 009m Ap 2.1-13 DOS-13-00081778-113-NPV, Revision 2, Appendix 2.1-13 Complimentary Analysis of FCC Package Behaviour in Accidental Drop Conditions (Public) Project stage: Other ML22277A7642018-05-18018 May 2018 E-61285 Enclosure 4, 009k Ap 2.1-11 DOS-19-021165-011-NPV, Version 1.0, Justification of the Performance of the FCC3 Shell Fasteners During a 9m Vertical Drop (FCC-3/FCC-4) (Public) Project stage: Other ML22271A6372021-10-0808 October 2021 E-61283 Enclosure 4, 009f1 Ap 2.1-6 FFDC04223-EN Npv Revision 4.0, Transportation in FCC Container Mechanical Aspects Related to a Change in the Fuel Assembly Materias (Public) Project stage: Other ML22277A7572021-10-28028 October 2021 E-61285 Enclosure 4, 009f1 Ap 2.1-6 FFDC04223-EN Npv Revision 4.0, Transportation in FCC Container Mechanical Aspects Related to a Change in the Fuel Assembly Materials (FCC-3/FCC-4) (Public) Project stage: Other ML22277A7702022-04-29029 April 2022 E-61285, Enclosure 4, 010a1 Appendix 2.2-1, Document No. FFP_D02-ARV-01-198-455, Justification by CFO Simulation of the Thermal Behavior of the FCC Container - FCC (Public) Project stage: Other ML22271A7992022-04-29029 April 2022 E-61283, Enclosure 4, 013c Appendix 2.5-3, Document No. DOS-13-00081778-503-NPV, Revision 00, Reference Document No. Ffdc 01106, Rev. a, Criticality-safety Analysis of FCC3 Containers Version 2 – Assembly Types 14x14 8-foot and 14x14 10-foo Project stage: Other 2012-04-30 |
ML23205A093 | |
Person / Time | |
---|---|
Site: | 07103097 |
Issue date: | 05/31/2023 |
From: | Boyle R US Dept of Transportation (DOT), Office of Hazardous Materials Safety |
To: | Garcia-Santos N Division of Fuel Management |
Shared Package | |
ML23164A174 | List: |
References | |
EPID L-2022-DOT-0008, EPID L-2022-DOT-0007, CAC A33010 | |
Download: ML23205A093 (1) | |
Similar Documents at 07103097 | |
---|---|
Category:Legal-Affidavit
MONTHYEARML23205A0922023-06-16016 June 2023
[Table view]Affidavit for RAIs Reponses Document No. COR-22-00555520-00 Related to the Revalidation Requests for the Model Nos FCC- and FCC-4 Packages ML23205A0932023-05-31031 May 2023 Transmittal Letter Dated 5/31/23 from Richard Boyle (DOT) to Ngarcia (NRC) - Responses to the RAIs Related to the FCC-4 Revalidation Request ML20189A6092020-06-26026 June 2020 Orano Cover Letter, Rsi Response, FCC-4 Revalidation 2023-06-16 Category:Letter MONTHYEARML23209A6352023-08-0808 August 2023
[Table view]Transmittal Letter-Revalidation Recommendation for the French Approval Certificate Number (No.) F/348/AF-96, Revision Gw, Model No. FCC-4 Transport Package (Docket No. 71-3097) ML23205A0922023-06-16016 June 2023 Affidavit for RAIs Reponses Document No. COR-22-00555520-00 Related to the Revalidation Requests for the Model Nos FCC- and FCC-4 Packages ML23205A0932023-05-31031 May 2023 Transmittal Letter Dated 5/31/23 from Richard Boyle (DOT) to Ngarcia (NRC) - Responses to the RAIs Related to the FCC-4 Revalidation Request ML23113A0032023-05-0202 May 2023 Request for Additional Information for Review of the Certificate of Compliance No. 3097, Model No. FCC-4 ML23060A2562023-03-0606 March 2023 Application for the French Certificate of Competent Authority No. F/348/Af-96, Revision Fq, Model No. FCC-4 - Accepted for Review - Cost Activity Code/Enterprise Project Identification Number (CAC No. A33010/EPID No. L-2022-DOT-0008) ML22325A0922022-12-0808 December 2022 Applications for the Model Nos. FCC-3 and FCC-4 Transport Packages - Supplemental Information Needed ML22277A7332022-08-18018 August 2022 Transmittal Letter-Revalidation Recommendation for the Model No. FCC-4 (French Package) (Docket No. 71-3097) ML22277A7312022-08-0303 August 2022 E-61285 Orano USA, Transmittal Letter, Application for Validation of French Competent Authority Certificate F/348/AF-96 for Model No. FCC-4 Transport Package ML21103A4342021-04-22022 April 2021 Transmittal Letter-Revalidation Recommendation for the Model No. FCC-4 (French Package) (Docket No. 71-3097) ML20317A0432020-11-12012 November 2020 Transmittal Letter: Request for Additional Information for the Model No. FCC-4, Certificate of Compliance No. 3097 ML20227A2512020-08-19019 August 2020 Application for the Model No. FCC-4 Transport Package - Accepted for Review ML20189A6082020-06-29029 June 2020 Transmittal Letter Dated 6/29/20 from Rboyle (DOT) to N.Garcia Santos (NRC)-RSI Response, FCC-4 Revalidation ML20189A6092020-06-26026 June 2020 Orano Cover Letter, Rsi Response, FCC-4 Revalidation ML20112F3772020-04-21021 April 2020 Application for the Model No. FCC-4 Transport Package - Supplemental Information Needed (Docket No. 71-3097) 2023-08-08 |
Text
U.S. Department East Building, PHH-23 of Transportation 1200 New Jersey Avenue SE Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration
May 31, 2023 Norma Garcia-Santos, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards (NMSS)
U.S. Nuclear Regulatory Commission 11545 Rockville Pike Rockville, MD 20852-2738
Dear Ms. Garcia-Santos:
In accordance with the Memorandum of Understanding between our agencies, I requested your review and recommendation on French Certificates of Approval No. F/34 8/AF-96, Revision Gw, for the FCC-4 transport package on August 18, 2022. The application was supplemented on January 26, 2023. In a letter dated May 2, 2023, you requested additional information. Our applicants response to your request was rec eived and is enc losed to this correspondence. The Agencywide Documents Access and Management System (ADAMS) Accession Number for this case is ML 23026A302, the Docket Number is 7 1-3097 and the EPID is L-2022-DOT-0008.
If you have any questions or need any additional safety information, please feel free to contact me at (202) 697-1301 or via email at rick.boyle@dot.gov.
Sincerely,
Richard W. Boyle, Radioactive Materials Division of Sciences and Engineering Office of Hazardous Materials Safety
Enclosures