Other: ML20280A970, ML20343A224, ML21147A547, ML21160A221, ML21218A045, ML22018A300, ML23097A123, ML23097A127, ML24036A222, ML24036A224, ML24043A242, ML24043A244, ML24103A224, ML24212A030, ML24262A066, ML24297A138, ML25017A130, ML25023A086, ML25028A267, ML25101A297, ML25161A172, ML25209A071, ML25248A302, ML25248A303, ML25325A151
|
MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval ML22327A2012023-03-0909 March 2023 X Energy LLC - Safety Evaluation of XE-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology Revision No. 3 (EPID No. L-2021-TOP-0011) - Redacted Project stage: Approval ML22327A1982023-03-0909 March 2023 Cover Letter – X Energy, LLC - Safety Evaluation of Xe-100 Topical Report, TRISO-X Pebble Fuel Qualification Methodology, Revision No. 3 Project stage: Approval ML23062A7282023-03-13013 March 2023 Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Approval ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval ML24325A3772023-03-20020 March 2023 Revised Draft SE Natrium EPZ TR Project stage: Draft Approval ML23116A1832023-05-0909 May 2023 Enclosure - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23116A1782023-05-0909 May 2023 Letter - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23097A1272023-05-31031 May 2023 Enclosure - X Energy, LLC – NRC Feedback Regarding Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach (EPID L-2022-LRO-0150/CAC 000431) Project stage: Other ML23097A1232023-05-31031 May 2023 Letter - X Energy, LLC - U.S. NRC Observations Regarding Xe-100 White Paper - Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Other ML23174A1752023-07-0606 July 2023 Transmittal Letter of Safety Evaluation for General Atomics Electromagnetic Systems Topical Report 30599T00005, Revision 2 Project stage: Approval PMNS20231071, Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report2023-09-25025 September 2023 Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report Project stage: Request ML23257A2592023-09-28028 September 2023 Terrapower, LLC - Final Safety Evaluation for Topical Report NATD-LIC-Report-0001, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces, Revision 0 (CAC: 000431 / EPID: L-2022-TOP-0045) Project stage: Approval ML23311A1392023-11-0606 November 2023 Terrapower, LLC, Transmittal of Topical Report, Radiological Release Consequences Methodology, Revision 0 Project stage: Request ML23333A0702023-12-18018 December 2023 Completeness Determination for Terrapower, Llc. Radiological Release Consequences Methodology Topical Report, Revision 0 Project stage: Request ML24036A2222024-02-13013 February 2024 NRC Form 897 Request for Withholding Proprietary Information WEC Evinci Als Topical Report Submitted on December 20, 2023 Project stage: Other ML24036A2242024-02-13013 February 2024 Email Withholding Determination Als WEC Project stage: Other ML24043A2442024-02-16016 February 2024 Westinghouse Electric Company - Transmittal Email: NRC Staff Completeness Determination for Topical Report: Advanced Logic System v2 Platform Elimination of Technical Specification Surveillance Requirements Project stage: Other 2022-02-08
[Table View] |
Text
Joy L. Rempe, Chairman Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
STAFF RESPONSE TO ADVISORY COMMITTEE ON REACTOR SAFEGUARDS LETTER ON SAFETY EVALUATION OF THE KAIROS TOPICAL REPORT KP-TR-011, REVISION 2, FUEL QUALIFICATION METHODOLOGY FOR THE KAIROS POWER FLUORIDE SALT-COOLED HIGH TEMPERATURE REACTOR (KP-FHR)
Dear Chairman Rempe,
In your letter dated December 20, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22340A628), the Advisory Committee on Reactor Safeguards (ACRS) reported on its review of the U.S. Nuclear Regulatory Commission (NRC) staffs safety evaluation (SE) of the Kairos Power LLC (Kairos Power) Topical Report KP-TR-011, Revision 2, Fuel Qualification Methodology for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor (KP-FHR). The NRC staff appreciates the ACRS review and recommendations. In consideration of the observations and recommendations by the ACRS, the NRC staff is revising the SE.
The ACRS letter contained the following recommendations:
1.
The topical report and the associated SE should acknowledge two concerns that affect assurance of Tri-structural Isotropic (TRISO) particle silicon carbide (SiC) layer integrity and radionuclide retention in the Kairos FHR designs:
a.
Material compatibility between the Flibe molten salt with impurities (e.g.,
Fe, Cr, Ni) and the fuel pebble containing TRISO particles, and b.
Irradiation performance of the Kairos fuel pebbles fabricated at production-scale prior to Hermes operation.
2.
The SE should explicitly consider the value of Hermes as a prototype.
The results of Hermes operation and the associated fuel surveillance plans should be considered as a compensatory measure to address Recommendation 1.
3.
The SE should explicitly acknowledge how the flexibility provided by the Atomic Energy Act for test reactors factored into the finding for acceptability of the fuel qualification methodology for Hermes.
February 8, 2023
J. Rempe 4.
After these items are addressed, the SE should be issued.
The ACRS observed that experience in other TRISO test programs showed transition metal interaction with the SiC layer of the TRISO particle. The NRC staff appreciates the ACRS observation of this TRISO behavior and Recommendation 1a. The NRC staff will add a condition to the SE requiring applications for KP-FHR power reactors to include information demonstrating that TRISO particle failures due to chemical attack during expected reactor conditions from impurities (e.g., Fe, Cr, or Ni) in the molten salt coolant are precluded or can be demonstrated to be insignificant.
The ACRS also observed that irradiation testing of production samples of the Hermes fuel pebbles is not planned. The ACRS noted that the Kairos Power fuel pebbles have a unique design with a low-density graphite core surrounded by an annular fuel region which has a relatively high packing fraction of TRISO particles. Regarding Recommendation 1b and considering Recommendation 2, the NRC staff agrees that the Hermes test reactor is serving as a prototype and the test reactor operation will provide information on the irradiation performance of fuel pebbles from the production process. The NRC staff will revise the SE to describe this aspect of the Hermes role in irradiation testing of production pebbles.
As mentioned in Recommendation 3, the ACRS noted that the Atomic Energy Act directs the Commission to impose only such minimum amount of regulation on test reactors as needed to fulfill the Commissions obligations. The NRC staffs SE revision on surveillance of pebble irradiation performance in Hermes will also note that licensing requirements are different between the non-power test and the commercial electric power versions of a KP-FHR.
The NRC staff agrees with the ACRS observation that the Hermes test reactor will provide valuable insight on the potential synergistic effects of irradiation with other reactor operating conditions which are not explicitly addressed by the Kairos Power fuel qualification plans. The NRC staff appreciates the ACRSs review and agrees with its recommendations. The NRC staff plans to revise and issue the final SE in February 2023 and looks forward to future interactions with the ACRS on Kairos Power licensing activities.
Sincerely, Andrea D. Veil, Director Office of Nuclear Reactor Regulation Project No. 99902069 cc: Chairman Hanson Commissioner Baran Commissioner Wright Commissioner Caputo Commissioner Crowell SECY Taylor, Robert signing on behalf of Veil, Andrea on 02/08/23