Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20280A970, ML20343A224, ML21147A547, ML21160A221, ML21218A045, ML22018A300, ML23097A123, ML23097A127, ML24103A224, ML24212A030, ML24262A066, ML24297A138, ML25017A130, ML25023A086, ML25028A267, ML25161A172, ML25248A302, ML25248A303, ML25325A151
|
MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20318A2242020-11-13013 November 2020 Kairos Power, LLC, KP-FHR Fuel Performance Methodology Project stage: Request ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email Project stage: Other ML20329A1452020-11-20020 November 2020 Terrapowers QAPD Preliminary Questions Project stage: Other ML20328A2302020-11-23023 November 2020 Kairos Power LLC, Submittal of Approved KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology Topical Report Project stage: Request ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21217A0102021-08-19019 August 2021 NRC Staff Presentation at August 19 2021 Pre-App Meeting with Kairos Power, LLC - Fuel Cycle and Transportation Project stage: Request ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22047A3262022-02-16016 February 2022 Kairos Power LLC, Topical Report, Submittal of KP8-FHR Mechanistic Source Term Methodology Topical Report, Revision 2 Project stage: Request ML22088A2292022-03-28028 March 2022 Kairos Power LLC, Submittal of KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22140A2652022-06-0202 June 2022 NRC 896 -A Topical Report Verification Review Determination for Terrapower, LLC Quality Assurance Program Topical Report Project stage: Other PMNS20220667, Kairos Power Graphite Materials Qualification Topical Report, Rev. 2: Follow-Up Clarification Meeting2022-06-16016 June 2022 Kairos Power Graphite Materials Qualification Topical Report, Rev. 2: Follow-Up Clarification Meeting Project stage: Request ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request PMNS20220736, Kairos Power Metallic Materials Qualification Topical Report, Rev. 2: Closed Clarification Meeting2022-07-15015 July 2022 Kairos Power Metallic Materials Qualification Topical Report, Rev. 2: Closed Clarification Meeting Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request PMNS20220785, Kairos Power Metallic Materials Qualification Topical Report, Rev. 2: Closed Clarification Meeting2022-08-0202 August 2022 Kairos Power Metallic Materials Qualification Topical Report, Rev. 2: Closed Clarification Meeting Project stage: Request ML22231B2222022-08-19019 August 2022 Kairos Power LLC, KP-FHR High Temperature Metallic Materials Topical Report, Revision 3 Project stage: Request ML22231B2242022-08-31031 August 2022 KP-TR-013-NP, Revision 3, Metallic Materials Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor Project stage: Request PMNS20220925, Kairos Power Metallic Materials Qualification Topical Report, Rev. 3: Closed Clarification Meeting2022-09-0101 September 2022 Kairos Power Metallic Materials Qualification Topical Report, Rev. 3: Closed Clarification Meeting Project stage: Request ML22263A4572022-09-20020 September 2022 Kairos Power LLC, KP-FHR High Temperature Metallic Materials Topical Report, Revision 4 Project stage: Request ML22263A4592022-09-20020 September 2022 Metallic Materials Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, KP-TR-013-NP, Revision 4 Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML22363A2852022-11-30030 November 2022 X Energy, LLC (X-energy), Proprietary Review of Draft Safety Evaluation for Xe-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22354A2982022-12-20020 December 2022 Kairos Power LLC, Presentation Material Advisory Committee on Reactor Safeguards, Subcommittee Graphite Material Qualification Topical Report (KP-TR-014, Revision 4) Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request 2022-01-21
[Table View] |
Text
Mr. Ryan Sprengel License Application Development Manager TerraPower, LLC 15800 Northup Way Bellevue, WA 98008
SUBJECT:
SAFETY EVALUATION REGARDING THE REVIEW OF TERRAPOWER, LLCS QUALITY ASSURANCE TOPICAL REPORT TP-QA-PD-0001, TERRAPOWER QA PROGRAM DESCRIPTION, REVISION 12 (EPID No. L-2020-TOP-0043/CAC NO. 000431)
Dear Mr. Sprengel:
By letter dated August 5, 2020, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20218A590) TerraPower, LLC (hereafter referred to as TerraPower), submitted for U.S. Nuclear Regulatory Commission (NRC) staff review, its Topical Report TP-QA-PD-0001, TerraPower QA Program Description, Revision 9A. This topical report (TR) addresses the activities associated with the design and construction of TerraPowers advanced nuclear power reactor. By letters dated December 23, 2020, and February 26, 2021 (ADAMS Accession Nos. ML21005A015 and ML21057A084, respectively), TerraPower responded to NRC staff requests for additional information (RAIs) and provided Revision 10 to Topical Report TP-QA-PD-0001. Subsequently, by letters dated May 28, 2021, and July 2, 2021 (ADAMS Accession Nos. ML21148A236 and ML21183A200, respectively),
TerraPower responded to additional RAIs and provided Revisions 11 and 12 to Topical Report TP-QA-PD-0001, respectively.
The NRC staffs final safety evaluation (SE) for TerraPower Quality Assurance Topical Report TP-QA-PD-0001 TerraPower QA Program Description, Revision 12, is enclosed. The NRC provided TerraPower a draft of the SE for the purpose of identifying proprietary information on November 15, 2021 (ADAMS Accession No. ML22014A287) and TerraPower confirmed that the SE does not include proprietary information (ADAMS Accession No. ML22019A088).
The NRC staff requests that TerraPower publish an accepted version of this TR within 3 months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed SE after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.
January 21, 2022
If you have any questions about this matter, please contact Mallecia Sutton at 301-415-0673 or by e-mail at Mallecia.Sutton@nrc.gov.
Sincerely, William Kennedy, Acting Chief Advanced Reactor Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No.: 99902087