Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20280A970, ML20343A224, ML21147A547, ML21160A221, ML21218A045, ML22018A300, ML23097A123, ML23097A127, ML24036A222, ML24036A224, ML24043A242, ML24043A244, ML24103A224, ML24212A030, ML24262A066, ML24297A138, ML25017A130, ML25023A086, ML25028A267, ML25101A297, ML25161A172, ML25209A071, ML25248A302, ML25248A303, ML25325A151
|
MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval ML22327A2012023-03-0909 March 2023 X Energy LLC - Safety Evaluation of XE-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology Revision No. 3 (EPID No. L-2021-TOP-0011) - Redacted Project stage: Approval ML22327A1982023-03-0909 March 2023 Cover Letter – X Energy, LLC - Safety Evaluation of Xe-100 Topical Report, TRISO-X Pebble Fuel Qualification Methodology, Revision No. 3 Project stage: Approval ML23062A7282023-03-13013 March 2023 Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Approval ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval ML24325A3772023-03-20020 March 2023 Revised Draft SE Natrium EPZ TR Project stage: Draft Approval ML23116A1832023-05-0909 May 2023 Enclosure - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23116A1782023-05-0909 May 2023 Letter - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23097A1272023-05-31031 May 2023 Enclosure - X Energy, LLC – NRC Feedback Regarding Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach (EPID L-2022-LRO-0150/CAC 000431) Project stage: Other ML23097A1232023-05-31031 May 2023 Letter - X Energy, LLC - U.S. NRC Observations Regarding Xe-100 White Paper - Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Other ML23174A1752023-07-0606 July 2023 Transmittal Letter of Safety Evaluation for General Atomics Electromagnetic Systems Topical Report 30599T00005, Revision 2 Project stage: Approval PMNS20231071, Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report2023-09-25025 September 2023 Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report Project stage: Request ML23257A2592023-09-28028 September 2023 Terrapower, LLC - Final Safety Evaluation for Topical Report NATD-LIC-Report-0001, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces, Revision 0 (CAC: 000431 / EPID: L-2022-TOP-0045) Project stage: Approval ML23311A1392023-11-0606 November 2023 Terrapower, LLC, Transmittal of Topical Report, Radiological Release Consequences Methodology, Revision 0 Project stage: Request ML23333A0702023-12-18018 December 2023 Completeness Determination for Terrapower, Llc. Radiological Release Consequences Methodology Topical Report, Revision 0 Project stage: Request ML24036A2222024-02-13013 February 2024 NRC Form 897 Request for Withholding Proprietary Information WEC Evinci Als Topical Report Submitted on December 20, 2023 Project stage: Other ML24036A2242024-02-13013 February 2024 Email Withholding Determination Als WEC Project stage: Other ML24043A2442024-02-16016 February 2024 Westinghouse Electric Company - Transmittal Email: NRC Staff Completeness Determination for Topical Report: Advanced Logic System v2 Platform Elimination of Technical Specification Surveillance Requirements Project stage: Other 2022-02-08
[Table View] |
Text
Mr. Chanson Yang Radiant Industries, Inc.
1921 Maple St.
El Segundo, CA 90245
SUBJECT:
RADIANT INDUSTRIES, INC. - U.S. NUCLEAR REGULATORY COMMISSIONS FEEDBACK REGARDING TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 51, ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS, GAP ANALYSIS WHITE PAPER (EPID NO. L-2024-LRO-0058/CAC 000431)
Dear Mr. Yang:
By submission dated October 23, 2024 (Agencywide Documents Access and Management System Accession No. ML24298A242), Radiant Industries, Inc. (Radiant), submitted for the U.S. Nuclear Regulatory Commission (NRC) staffs review, white paper DOC-0BDD, 10 CFR 51 Gap Analysis. This white paper describes a gap analysis of Title 10 of the Code of Federal Regulations (10 CFR) Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, against the specific requirements necessary to license a manufacturing facility capable of constructing and testing Radiants Kaleidos reactor design and deploy the Kaleidos reactor units. The NRC staff was asked to perform a review of this white paper and provide feedback regarding the gap analysis. Given the availability of design information at this time, the NRC staff completed its review of the submittal and is generally aligned with its overall approach. However, the NRC staff noted that Radiant may want to reconsider its approach to a few sections noted in the enclosure. The enclosure to this letter provides the NRC staffs detailed observations for Radiant to consider.
If you have questions regarding this matter, please contact Kevin Roche at (301) 415-1554 or via email at Kevin.Roche@nrc.gov Sincerely, John. P. Segala, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No.: 99902106
Enclosure:
As stated February 27, 2025 Signed by Segala, John on 02/27/25
ML25023A086 NRR-106 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL2:LA NMSS/REFS/ETRB3:BC NAME KRoche CSmith DBarnhurst DATE 01/27/2025 01/27/2025 02/19/2025 OFFICE NRR/DANU/UAL2:BC NAME JSegala DATE 02/27/2025
Enclosure RADIANT INDUSTRIES, INC. - U.S. NUCLEAR REGULATORY COMMISSIONS FEEDBACK REGARDING RADIANT WHITE PAPER: 10 CFR 51 GAP ANALYSIS WHITE PAPER, (L-2024-LRO-0045/CAC 000431) SPONSOR INFORMATION Sponsor:
Mr. Chanson Yang Sponsor Address:
Radiant Industries, Inc.
1921 Maple St.
El Segundo, CA 90245 Docket/Project No(s).:
99902106/L-2024-LRO-0058/CAC 000431 DOCUMENT INFORMATION Submittal Date: October 23, 2024 Submittal Agencywide Documents Access and Management System (ADAMS) Accession No.: ML24298A242 Purpose of the White Paper: Radiant Industries, Inc., (Radiant) stated that the purpose of this white paper is to document its gap analysis of Title 10 of the Code of Federal Regulations (10 CFR), Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, against the specific requirements necessary to license both a manufacturing facility capable of online reactor testing and deployed microreactor units for the Kaleidos reactor design.
Action Requested: Radiant requested the U.S. Nuclear Regulatory Commission (NRC) staffs feedback and observations regarding the information discussed in 10 CFR 51 Gap Analysis.
FEEDBACK AND OBSERVATIONS The feedback and observations regarding this white paper are preliminary given the amount of available information and is subject to change. The feedback and observations are not regulatory findings regarding any specific licensing matter and are not official agency positions.
NRC Staff Observations Since Radiant evaluated 10 CFR Part 51 independent of the licensing pathway (10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, or 10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants), these results are preliminary and additional discussions conducted during the pre-application phase will clarify any questions regarding the requirements of a particular licensing pathway. The NRC staff has reviewed the above referenced document and notes the following general observations.
Section 4.1, General Provisions of 10 CFR Part 51 - typographical error. This section references 10 CFR Part 50 not 10 CFR Part 51, as the NRC staff believes that Radiant intended.
Section 4.3, Preliminary Procedures o
Regulation 10 CFR 51.20 (b)(9) - General observation - The compliance rationale states to submit a 10 CFR Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste, application for an Independent Spent Fuel Storage Installation (ISFSI). Although not specifically stated, this specific licensing decision is based upon the location of the ISFSI being at the manufacturing/testing facility since general license provisions under 10 CFR Part 50 or 10 CFR Part 52, assume a spent fuel storage cask.
o Regulation 10 CFR 51.22, Criterion for categorical exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review, and 10 CFR 51.31, Determinations based on environmental assessment - The compliance rationale is noted. NRC White Paper Nth-of-a-Kind Micro-Reactor Licensing and Deployment Considerations (ML24268A310) issued September 2024, provides options for expanded use of categorical exclusions, environmental assessments, and generic environmental impact statements. SECY-24-008 dated January 24, 2024, Microreactor Licensing and Deployment Considerations: Fuel Loading and Operational Testing at a Factory (ML23207A252) has been written by the NRC staff to provide the Commission with options for regulating certain aspects of fuel loading and operational testing of commercial factory-fabricated micro-reactors. This paper also seeks the Commissions direction on whether a factory-fabricated microreactor that includes features to preclude criticality would require a facility operating license or a combined license when loaded with fuel. The NRC staff is awaiting the Commissions direction on these issues.
Section 4.4, Environmental Reports and Information - Requirements Applicable to Applicants and Petitioners for Rulemaking o
Regulation 10 CFR 51.50, Environmental report - construction permit, early site permit, or combined license stage. General Observations regarding the Compliance Rationale: The NRC staff awaits the Commissions direction on these issues.
SECY-24-008 has been written by the NRC staff to provide the Commission with options for regulating certain aspects of fuel loading and operational testing of commercial factory-fabricated microreactors. This SECY paper also seeks the Commissions direction on whether a factory-fabricated microreactor that includes features to preclude criticality would require a facility operating license or a combined license when loaded with fuel.
o Regulation 10 CFR 51.51, Uranium fuel cycle environmental data - Table S-3, and 10 CFR 51.52, Environmental effects of transportation of fuel and waste -
Table S-4. Compliance Type may be better captured as Action Required and further consideration given to Compliance Rationale as both regulations apply to Radiant as a connected action. Radiant would need to discuss the uranium fuel cycle environmental data as a connected action to the manufacture of fuel. See 10 CFR 51.50 (b)(3) and 10 CFR 51.50 (c). The activities associated with fuel cycle activities are not restricted to light water reactors regardless of licensing pathway.
o Regulation 10 CFR 51.53, Postconstruction environmental reports, - The general observation is that it applies only to a Construction Permit under 10 CFR Part 50 if Radiant were to decide on that licensing pathway.
Section 4.6, NEPA Procedure and Administrative Action; 10 CFR 51.104, NRC proceeding using public hearings; consideration of environmental impact statement thru 10 CFR 51.109, Public hearings in proceedings for issuance of materials license with respect to a geologic repository o
Compliance Type may be better captured as Further Evaluation and further consideration given to Compliance Rationale, accordingly to the type of licensing pathway in 10 CFR Part 50 or 10 CFR Part 52 selected. On April 12, 2024, the Commission issued Staff Requirements Memoranda (SRM) SECY-24-0032 -
Revisiting the Mandatory Hearing Process at the NRC. The Commission approved the use of simplified hearing procedures, outlined as Option 1, the Commission would preside over mandatory hearings but provide for submission of evidence, and all Commissioner questions and party answers are to be in written form only.
Principal Contributors: Joe OHara, NMSS Don Palmrose, PhD, NMSS