Letter Sequence Other |
|---|
CAC:000431, (Approved, Closed) EPID:L-2018-LRM-0071, Discussion on Special Nuclear Material Control and Accountability (Mc&A) Plans for Kairos Power LLCs Proposed Hermes Test Reactor (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20280A970, ML20343A224, ML21147A547, ML21160A221, ML21218A045, ML22018A300, ML23097A123, ML23097A127, ML24103A224, ML24212A030, ML24262A066, ML24297A138, ML25017A130, ML25023A086, ML25028A267, ML25161A172, ML25248A302, ML25248A303, ML25325A151
|
MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval ML22327A2012023-03-0909 March 2023 X Energy LLC - Safety Evaluation of XE-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology Revision No. 3 (EPID No. L-2021-TOP-0011) - Redacted Project stage: Approval ML22327A1982023-03-0909 March 2023 Cover Letter – X Energy, LLC - Safety Evaluation of Xe-100 Topical Report, TRISO-X Pebble Fuel Qualification Methodology, Revision No. 3 Project stage: Approval ML23062A7282023-03-13013 March 2023 Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Approval ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval ML24325A3772023-03-20020 March 2023 Revised Draft SE Natrium EPZ TR Project stage: Draft Approval ML23116A1782023-05-0909 May 2023 Letter - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23116A1832023-05-0909 May 2023 Enclosure - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23097A1272023-05-31031 May 2023 Enclosure - X Energy, LLC – NRC Feedback Regarding Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach (EPID L-2022-LRO-0150/CAC 000431) Project stage: Other ML23097A1232023-05-31031 May 2023 Letter - X Energy, LLC - U.S. NRC Observations Regarding Xe-100 White Paper - Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Other ML23174A1752023-07-0606 July 2023 Transmittal Letter of Safety Evaluation for General Atomics Electromagnetic Systems Topical Report 30599T00005, Revision 2 Project stage: Approval ML23189A0072023-07-11011 July 2023 June 28, 2023, Summary of the Observation Meeting Between the U.S. Nuclear Regulatory Commission Staff and Kairos Power, LLC to Provide an Overview of the Hermes 2 Construction Permit Application Project stage: Meeting PMNS20231071, Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report2023-09-25025 September 2023 Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report Project stage: Request ML23257A2592023-09-28028 September 2023 Terrapower, LLC - Final Safety Evaluation for Topical Report NATD-LIC-Report-0001, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces, Revision 0 (CAC: 000431 / EPID: L-2022-TOP-0045) Project stage: Approval PMNS20231107, Discussion on Special Nuclear Material Control and Accountability (Mc&A) Plans for Kairos Power LLCs Proposed Hermes Test Reactor2023-10-0303 October 2023 Discussion on Special Nuclear Material Control and Accountability (Mc&A) Plans for Kairos Power LLCs Proposed Hermes Test Reactor Project stage: Request ML23311A1392023-11-0606 November 2023 Terrapower, LLC, Transmittal of Topical Report, Radiological Release Consequences Methodology, Revision 0 Project stage: Request ML23333A0702023-12-18018 December 2023 Completeness Determination for Terrapower, Llc. Radiological Release Consequences Methodology Topical Report, Revision 0 Project stage: Request ML24008A0802024-01-0808 January 2024 Kairos Power LLC, Summary of 11/2/2023, Public Meeting to Discuss Material Control and Accounting Project stage: Meeting 2022-03-28
[Table View] |
Text
KAIROS POWER, LLC - HERMES TEST REACTOR POSTULATED EVENTS AUDIT PLAN (CAC/EPID NO. 000431/99902069/L-2018-LRM-0071)
APPLICANT INFORMATION Applicant:
Kairos Power LLC Applicant Address:
707 W. Tower Ave, Alameda, CA 94501 Plant Name(s) and Unit(s):
Kairos - Hermes Test Reactor Project No(s).:
99902069
Background:
Kairos Power LLC (Kairos) began pre-application discussions with the U.S. Nuclear Regulatory Commission (NRC) staff on their Kairos Power Fluoride-Salt-Cooled, High-Temperature Reactor (KP-FHR) in October 2018. In December of 2020, Kairos announced that the Hermes test reactor would be used to support future development of the KP-FHR. Over the past several years, Kairos has submitted several topical and technical reports that apply to both the Hermes as well as the full-scale KP-FHR reactor. As discussed in meetings held on January 27, 2021 and March 3, 2021, Kairos plans to submit a Hermes Part 50 construction permit (CP) and corresponding preliminary safety evaluation (PSAR). A key reference in the preliminary safety evaluation will be the Transient Methodology technical report which will provide the specific internal events and associated analysis methodology for the Hermes design. It is expected that Kairos will submit this report at the same time they submit their PSAR. The contents of the Transient Methodology report are expected to align with that given in NUREG-1537, Chapter 13 including any design specific events. The events to be evaluated in the report should be derived from a systemic approach to event identification which the staff is requesting to audit.
Purpose:
The purpose of this audit is for the NRC staff to gain a better understanding of Kaiross systematic event identification process and the resulting proposed postulated events to be evaluated in the Transient Methodology technical report. Also, the staff would like to enhance its understanding of how defense-in-depth against potential radiological releases is incorporated into the Hermes test reactor design and corresponding analyses including the Maximum Hypothetical Accident. Therefore, the staff is requesting access to internal documents associated with event identification and the resulting events analyzed as part of the Transient Methodology technical report. In addition, the staff is requesting any relevant documents associated with the Hermes reactor design defense-in-depth evaluation or considerations.
June 9, 2021
2 Regulatory Audit Basis:
The bases for the audit are the regulations of Title 10 of the Code of Federal Regulations, 50.34(a)(1)(ii)(D) and 50.34(a)(4).
Regulatory Audit Scope This audit will focus on information provided by Kairos on the online reference portal.
Information and Other Material Necessary for the Regulatory Audit Documents associated with event identification, analysis methodology, and defense-in-depth considerations associated with the Hermes test reactor.
Team Assignments Jeff Schmidt Sr. Reactor Systems Engineer, NRR/DANU/UART, Audit Lead responsible for audit summary report preparation Boyce Travis Technical staff, NRR/DANU/UART Jason Schaperow Technical staff, NRR/DANU/UART Michelle Hart Technical staff, NRR/DANU/UART (as needed)
Alexander Chereskin Technical staff, NRR/DANU/UART (as needed)
Stewart Magruder Project Manager, NRR/DANU/UARL, responsible for audit logistics Ed Helvenston Project Manager, NRR/DANU/UNPL Additional audit team members may be added as needed.
Logistics Entrance Meeting June 9, 2021 Exit Meeting July 30, 2021, or earlier, Time TBD Audit meetings take place in a virtual format, using Microsoft Teams, or via other, similar platform. Audit meetings will be scheduled on an as needed basis after the entrance meeting and once the NRC staff has had the opportunity to review any documents placed in the online reference portal. The audit duration is anticipated to be approximately 6 weeks with activities occurring intermittently during that period.
Special Requests None.
Deliverables At the completion of the audit, the audit team will issue an audit summary within 90 days after the exit meeting but will strive for a shorter duration. The audit summary will be declared and entered as an official agency record in the NRCs Agencywide Documents Access and Management System (ADAMS) and be made available for public viewing through the publicly available records component of ADAMS.
References
3 Title 10 of the Code of Federal Regulations.
If necessary, any issues related to the conduct of the audit should be communicated to Stewart Magruder (NRC) at 301-348-5766 or by email at stewart.magruder@nrc.gov.
Date: June 9, 2021 William Kennedy, Acting Chief Advanced Reactor Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Signed by Kennedy, William on 06/09/21
ML21147A547 Audit Plan OFFICE NRR/DANU/UART/LEAD NRR/DANU/UARL/PM NRR/DANU/UARL/LA NAME JSchmidt SMagruder SLent DATE 06/09/2021 06/09/2021 06/09/2021 OFFICE NRR/DANU/UART/BC NRR/DANU/UARL/BC NAME MHayes WKennedy DATE 06/09/2021 06/09/2021