MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21281A0922021-10-22022 October 2021 NRC 897 Withholding Determination for KP-FHR Mechanistic Source Term Methodology Topical Report Rev 1 Project stage: Other ML21281A0792021-10-22022 October 2021 Email to Kairos Regarding Mechanistic Source Term Topical Report Withholding Determination.Docx Project stage: Other ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML21363A1802021-12-30030 December 2021 NRC Staff Withholding Determination - Kairos Power Topical Report: KP-TR-012-P, Revision 0, KP-FHR Mechanistic Source Term Methodology Project stage: Other ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22138A1642022-05-19019 May 2022 Email with Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 3 Project stage: Other ML22138A1632022-05-19019 May 2022 Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 3 Project stage: Other ML22138A1402022-05-19019 May 2022 Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 2 Project stage: Other ML22138A1392022-05-19019 May 2022 Email with Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 2 Project stage: Other ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22164A0602022-06-15015 June 2022 NRC 896 -A Topical Report Verification Review Determination for Kairos Mechanistic Source Term Topical Report Project stage: Other ML22164A0592022-06-15015 June 2022 Email Transmitting NRC Form 896 for Kairos Mechanistic Source Term -A Topical Report Project stage: Other ML22166A3262022-07-0505 July 2022 Email with Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report - a Project stage: Other ML22166A3252022-07-0505 July 2022 Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report -A Project stage: Other ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval 2021-07-02
[Table View] |
Text
February 08, 2022 Joy Rempe, Chairman Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
SAFETY EVALUATION OF THE KAIROS POWER LLC TOPICAL REPORT KP-TR-012-P, REVISION 1, KP-FHR MECHANISTIC SOURCE TERM METHODOLOGY
Dear Chairman Rempe:
By letter dated December 20, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21342A179), the Advisory Committee on Reactor Safeguards (ACRS) reported on its review of the U.S. Nuclear Regulatory Commission (NRC) staffs safety evaluation (SE) of the Kairos Power LLC (Kairos Power) Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology. The NRC staff appreciates the ACRS review, and its conclusions and recommendations listed below:
- 1.
The topical report presents the methodology used by Kairos to calculate the mechanistic source term of fission products, activation products, and corrosion products produced in the Kairos Power fluoride salt-cooled high temperature reactor (KP-FHR) core. The approach is consistent with existing high-level regulatory guidance on source terms for advanced reactors.
- 2.
Staff review of an application that employs this methodology will need to ensure that the assumptions on the number of failed pebbles as well as the experimental limitations related to tritium behavior in the molten salt coolant for the KP-FHR (Flibe0 F1) and diffusion and trapping effects in graphitic components are adequately considered in conservative safety analyses and relevant sensitivity studies.
- 3.
The staff SE does not require experimental validation of vaporization of fission products from Flibe. This has an important effect on the overall source term, and experimental validation data are needed to confirm the approach used by the applicant. The SE should be changed to address this concern.
1 Flibe is a mixture of lithium fluoride (LiF) and beryllium fluoride (BeF2), with a nominal chemical composition of 2LiF:BeF2.
Regarding Recommendation 1, the NRC staff appreciates that the ACRS agrees with the NRC staffs position that the methodology used by Kairos for the mechanistic source term is consistent with existing regulatory guidance for advanced reactors.
Regarding Recommendation 2, the NRC staff notes that the ACRS discussion of tritium behavior points out specific topics that the NRC staff should ensure are covered in the subsequent review of an application for a KP-FHR. For example, the ACRS points out several considerations, including the different heat treatment of the various carbon-based materials, which can affect the amount of tritium retained in those materials through traps. The NRC staff agrees that modeling the concentration of fission products in the matrix relative to the trap concentration is an important consideration in the determination of tritium retention and the subsequent effect on radionuclide release; therefore, validation of these diffusion and trapping models by the applicant using the methodology, is necessary. The ACRS also notes that experience with pebble bed reactor operation shows that pebbles are broken during operation, and that applicants using the report will need to justify the assumption on the number of pebbles being damaged. The NRC staff agrees that the number of damaged pebbles is an important consideration in the implementation of the methodology. In any application which uses an approved topical report methodology, the NRC staff will assess the applicability of the topical report to the application, including assumptions in the approved methodology.
The staffs SE also includes limitations and conditions on the use of the topical report that concern issues addressed in ACRS Recommendation 2. Specifically, SE limitations and conditions 6 and 10, ensure that the applicant is to provide information related to modeling of tritium behavior in the Flibe and graphite. The NRC staff appreciates the technical issues pointed out in the ACRS letter, which will aid the NRC staff in future reviews of an application which implements the topical report methodology.
The NRC staff considered ACRS Recommendation 3 and agrees that vaporization of fission products from Flibe is important to the overall source term and that experimental data are needed to confirm modeling of radionuclide vaporization. The NRC staff are engaging with the applicant (ADAMS Accession No. ML22033A483) to ensure that the approach used by the applicant is confirmed with experimental data. The NRC staff will also address this in its final safety evaluation of the topical report.
The NRC staff appreciates the ACRS review. The NRC staff plans to issue the SE report in early spring 2022 and looks forward to future interactions with the ACRS regarding Kairos licensing topical reports or applications.
Sincerely, Robert M.
Taylor Digitally signed by Robert M. Taylor Date: 2022.02.08 08:19:27 -05'00' Andrea D. Veil, Director Office of Nuclear Reactor Regulation Project No. 99902069 cc: Chairman Hanson Commissioner Baran Commissioner Wright SECY
SUBJECT:
SAFETY EVALUATION OF THE KAIROS POWER LLC TOPICAL REPORT KP-TR-012-P, REVISION 1, KP-FHR MECHANISTIC SOURCE TERM METHODOLOGY DATED: FEBRUARY 08, 2022 DISTRIBUTION: OEDO-21-00545 PUBLIC UARL R/F MHart, NRR AChereskin, NRR SCuadrado, NRR BBeasley, NRR CdeMessieres, NRR RidsNrrOd RidsNrrDanu RidsNrrDanuUARL RidsNrrDnrl RidsOpaMail RidsOcaMailCenter RidsOgcMailCenter RidsNrrMailCenter RidsAcrsAcnwMailCtr RidsNrrLACSmith ADAMS Accession Number: ML22024A485 NRR-106 OFFICE NRR/DANU/UARL:PM NRR/DANU/UARL:LA NRR/DANU/UTB2:BC NAME SCuadrado CSmith CdeMessieres DATE 01/26/2022 01/27/2022 02/01/2022 OFFICE NRR/DANU/UARL:BC NRR/DANU:D NRR:D NAME WKennedy JBowen for MShams RTaylor for AVeil DATE 02/02/2022 02/03/2022 02/08/2022 OFFICIAL RECORD COPY