Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23268A009 | 3 November 2023 | Kairos Power, LLC - Approval of Kairos Power Safeguards Information Protection Plan | |
ML23102A239 | 11 April 2023 | Kairos Power LLC, Presentation Materials for Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Section 12.9 and Chapter 13 | |
ML23089A387 | 30 March 2023 | Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 | |
ML23062A734 | 13 March 2023 | Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR | |
ML23062A730 | 13 March 2023 | Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR | |
ML22181B054 | 30 June 2022 | Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - PSAR Chapter 7 | |
ML22181B175 | 30 June 2022 | Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - PSAR Chapter 4 | |
ML22181B158 | 30 June 2022 | Kairos Power LLC, Transmittal of Changes to Construction Permit Application | |
ML22181B112 | 27 June 2022 | Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - PSAR Chapter 3 | |
ML21342A241 | 8 December 2021 | Kairos Power LLC, Presentation Materials for the December 14, 2021 Pre-Submittal Meeting on the Atlas Fuel Fabrication Facility Application | |
ML20188A111 | 13 July 2020 | Verification Letter for Kairos Power LLC PDC Topical Report | |
ML20014E642 | 6 February 2020 | Kairos Power, LLC Online Reference Portal Information Access Agreement | |
ML20029E930 | 29 January 2020 | Withholding Proprietary Information from Public Disclosure - Kairos Power LLC Topical Report Submittal, Scaling Methodology for the Kairos Power Testing Program (Revision 1) | |
ML19336B270 | 9 December 2019 | Withholding Proprietary Information from Public Disclosure - Kairos Power, LLC Topical Report Submittal, Reactor Coolant for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor | |
ML19310E870 | 6 November 2019 | Withholding Proprietary Information from Public Disclosure - Kairos Power Regulatory Engagement Plan | |
ML19303C159 | 4 November 2019 | Withholding Proprietary Information from Public Disclosure -Presentation Materials for Kairos Power Pre-Application Engagement Plans | |
ML19304C465 | 4 November 2019 | Withholding Proprietary Information from Public Disclosure - Presentation Slides for Kairos Nuclear Fuel Overview | |
ML19294A094 | 25 October 2019 | Withholding Proprietary Information from Disclosure- Presentation Materials for Kairos Power Pre-submittal Meeting on Principal Design Criteria and Regulatory Gap Analysis | |
ML19294A110 | 25 October 2019 | Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Reactor Coolant and Scaling Methodology Topical Reports | |
ML19297E434 | 25 October 2019 | Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Risk-Informed Performance-Based Licensing Basis Development Topical Report | |
ML19297G250 | 25 October 2019 | Withholding Proprietary Information from Public Disclosure -Presentation Slides for Kairos Power High Temperature Materials Overview | |
ML19284D767 | 23 October 2019 | Kairos Power LLC - Acceptance of KP-FHR Risk-Informed performance-Based Licensing Basis Development Methodology Topical Report (CAC No. 000431) | |
ML19275E281 | 21 October 2019 | Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Fuel Performance and Discussion of Fuel Qualification Plan | |
ML19267A220 | 30 September 2019 | Withholding Proprietary Information from Public Disclosure - Kairos Power, LLC Topical Report Submittal, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor | |
ML19255H234 | 17 September 2019 | Confirmation of Revision to Kairos Power LLC Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) | |
ML19221B585 | 9 August 2019 | Kairos Power, LLC - Acceptance of Reactor Coolant for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (CAC No. 000431) | |
ML19189A297 | 15 July 2019 | Withholding Proprietary Information from Public Disclosure - Kairos Power LLC Topical Report Submittal, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor | |
ML19184A238 | 8 July 2019 | Confirmation of Revision to Kairos Power LLC, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) | |
ML19150A275 | 5 June 2019 | Acceptance for Review of Kairos Power LLC, Scaling Methodology for the Kairos Power Testing Program Topical Report (CAC No. 000431) | |
ML19059A377 | 6 March 2019 | Acceptance for Review of Kairos Power LLC, Regulatory Analysis for the Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) | |
ML19059A355 | 6 March 2019 | Acceptance for Review of Kairos Power LLC, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) |