Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20280A970, ML20343A224, ML21147A547, ML21160A221, ML21218A045, ML22018A300, ML23097A123, ML23097A127, ML24036A222, ML24036A224, ML24043A242, ML24043A244, ML24103A224, ML24212A030, ML24262A066, ML24297A138, ML25017A130, ML25023A086, ML25028A267, ML25101A297, ML25161A172, ML25209A071, ML25248A302, ML25248A303, ML25325A151
|
MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval ML22327A2012023-03-0909 March 2023 X Energy LLC - Safety Evaluation of XE-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology Revision No. 3 (EPID No. L-2021-TOP-0011) - Redacted Project stage: Approval ML22327A1982023-03-0909 March 2023 Cover Letter – X Energy, LLC - Safety Evaluation of Xe-100 Topical Report, TRISO-X Pebble Fuel Qualification Methodology, Revision No. 3 Project stage: Approval ML23062A7282023-03-13013 March 2023 Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Approval ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval ML24325A3772023-03-20020 March 2023 Revised Draft SE Natrium EPZ TR Project stage: Draft Approval ML23116A1782023-05-0909 May 2023 Letter - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23116A1832023-05-0909 May 2023 Enclosure - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23097A1232023-05-31031 May 2023 Letter - X Energy, LLC - U.S. NRC Observations Regarding Xe-100 White Paper - Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Other ML23097A1272023-05-31031 May 2023 Enclosure - X Energy, LLC – NRC Feedback Regarding Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach (EPID L-2022-LRO-0150/CAC 000431) Project stage: Other ML23174A1752023-07-0606 July 2023 Transmittal Letter of Safety Evaluation for General Atomics Electromagnetic Systems Topical Report 30599T00005, Revision 2 Project stage: Approval PMNS20231071, Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report2023-09-25025 September 2023 Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report Project stage: Request ML23257A2592023-09-28028 September 2023 Terrapower, LLC - Final Safety Evaluation for Topical Report NATD-LIC-Report-0001, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces, Revision 0 (CAC: 000431 / EPID: L-2022-TOP-0045) Project stage: Approval ML23311A1392023-11-0606 November 2023 Terrapower, LLC, Transmittal of Topical Report, Radiological Release Consequences Methodology, Revision 0 Project stage: Request ML23333A0702023-12-18018 December 2023 Completeness Determination for Terrapower, Llc. Radiological Release Consequences Methodology Topical Report, Revision 0 Project stage: Request ML24036A2242024-02-13013 February 2024 Email Withholding Determination Als WEC Project stage: Other ML24036A2222024-02-13013 February 2024 NRC Form 897 Request for Withholding Proprietary Information WEC Evinci Als Topical Report Submitted on December 20, 2023 Project stage: Other ML24043A2422024-02-16016 February 2024 Westinghouse Electric Company - 898 NRC Form: NRC Staff Completeness Determination for Topical Report: Advanced Logic System v2 Platform Elimination of Technical Specification Surveillance Requirements Project stage: Other 2022-02-08
[Table View] |
Text
X ENERGY, LLC - AUDIT PLAN FOR TOPICAL REPORT XE-100 TRAINING PROGRAMS METHODOLOGY, REVISION 3 (CAC / EPID NO.000431 / L-2024-TOP-0008)
APPLICANT INFORMATION Applicant:
X Energy, LLC Applicant Address:
801 Thompson Avenue, Rockville, MD 20852 Design Name:
Xe-100 Project No.:
99902071
Background:
By letter dated March 27, 2024, X Energy, LLC (X-energy) submitted topical report (TR) 2024-XE-NRC-008, Xe-100 Licensing Topical Report, Revision 3, Xe-100 Training Programs Methodology (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24089A244). This TR provides the methodology for establishing, implementing, and maintaining Xe-100 training programs in support of future licensing applications regarding the Xe-100 technology.
This audit is in support of the U.S. Nuclear Regulatory Commission (NRC) staffs safety review of the topical report submitted by X-energy.
Purpose:
The purpose of the audit is for the NRC staff to gain a more detailed understanding of X-energys training program methodology and to identify any information that will require docketing to support the NRC staffs safety evaluation of the subject TR. Therefore, the NRC staff is requesting access to X-energy documents associated with the training program methodology as referenced in the TR.
Regulatory Audit Bases:
The regulatory basis for this audit includes the following regulatory requirements: 10 CFR 50.120, Training and Qualification of nuclear power plant personnel and 10 CFR 55.4, Definitions, which defines the Systems Approach to Training (SAT).
Regulatory Audit Scope:
The audit will follow the guidance in NRR Office Instruction LIC-111 (ML19226A274),
Regulatory Audits, and focus on information provided by X-energy through the electronic reading room, and, if necessary, an onsite visit.
2 Information and Other Material Necessary for the Regulatory Audit:
The NRC staff is requesting access to documents associated with the Xe-100 training program development. In addition, the staff is requesting access to documents referenced in the training program methodology topical report that are not readily available to the staff. Specifically, the NRC staff request to audit the following documents:
TMX procedures (all)
Training Program Manuals Training program curriculum/materials Learning Object program/process described in Figure 1 Learning Object Model of the Xe-100 Training Programs Methodology TR Additional documents may be requested as needed.
Team Assignments Jeff Correll Reactor Engineer, Audit Technical Lead Adrian Muniz Senior Project Manager Ondra Dukes Project Manager Logistics:
Entrance Meeting August 19, 2024 Exit Meeting Week of August 26, 2024 (estimate)
Audit meetings will take place in a virtual format, using Microsoft Teams, or another similar platform. Audit meetings will be scheduled as needed after the entrance meeting. The audit will begin on August 19, 2024, and continue as necessary, with activities occurring intermittently during the audit period. The audit period may be reduced or extended, depending on the progress made by the NRC staff and X-energy in addressing audit questions.
Special Requests:
The NRC staff request that X-Energy staff involved with training program development are available to answer questions during the audit. The NRC staff also request that X-energy provides access to supporting documents via the X-energy electronic reading room.
Deliverables:
At the completion of the audit, the NRC staff will issue an audit summary within 90 days after the exit meeting. The audit summary will be made publicly available in ADAMS.
References:
Title 10 of the Code of Federal Regulations.
3 If you have any questions about this audit, please contact me at (301) 415-4093 or by email at Adrian.Muniz@nrc.gov.
Date:
Sincerely, Adrian Muniz, Senior Project Manager Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No.: 99902071 cc: X-Energy Xe-100 via GovDelivery August 14, 2024 Signed by Muniz Gonzalez, Adrian on 08/14/24
ML24212A030 NRR-106 OFFICE NRR/DANU/UARL/PM NRR/DRO/IOLB/BC NRR/DANU/UAL2/(A)BC NRR/DANU/UAL2/PM NAME AMuniz JAnderson SPhilpott AMuniz DATE 07/30/2024 08/02/2024 08/09/2024 08/14/2024