ML24159A174
ML24159A174 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 05/30/2024 |
From: | Indiana Michigan Power Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML24159A261 | List:
|
References | |
AEP-NRC-2024-20 | |
Download: ML24159A174 (1) | |
Text
16.4 REVISED PER 98-UFSAR-0779 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Mainsteam from Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve Unit No.2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1 SH 1 of 1 30" Line Break
30" Line Break
30" Line Break
30" Line Break
4" Line Break
4" Line Break
- 1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.
High Energy Line Break Locations are labeled as shown with Symbol 4"/30" Line Break.
- 2. All dimensions & Elevations are Reference only.
16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Mainsteam From Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1A SH 1 of 1 16.4 REVISED PER 98-UFSAR-0779 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric of Feedwater from Heaters # 6A &
COOK NUCLEAR PLANT 6B to Steam Generators Unit No. 2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2 SH 1 of 1 6" Line Break
14" Line Break 6" Line Break 14" Line Break
14" Line Break
6" Line Break 14" Line Break
6" Line Break
- 1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.
High Energy Line Break Locations are labeled as shown with Symbol 6"/14" Line Break.
- 2. All dimensions & Elevations are Reference only.
16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric Feedwater from Heaters 6A and 6B to Steam COOK NUCLEAR PLANT Generators for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2A SH 1 of 1 16.6
16.6REVISED PER UCR 99-UFSAR-1307
HI ENERGY LINE BREAK EQUIP/SOURCE ARRG'T MEZZANINE FL. EL. 609'-0" UNITS NO. 1 & 2 FSAR FIG. 14.4.2 - 7
UNIT 2 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLESchematic of West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO.FSAR FIG. 14.4.6-1 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLETMD Network for West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO.FSAR FIG. 14.4.6-2 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLESchematic of East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-3 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLETMD Network for East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-4 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Peak Environmental Parameters (West Main Steam COOK NUCLEAR PLANT Enclosure and Accessway) (Structural Qualification)
NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-5 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Peak Environmental Parameter (East Main Steam COOK NUCLEAR PLANT Enclosure) (Structural Qualification)
NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-6 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE East Main Steam Enclosure Pressure Profile in COOK NUCLEAR PLANT Elements 2 and 3 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-8 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Feedwater Line Break in Main Steam Accessway COOK NUCLEAR PLANT (Element 7) Pressure VS. Time NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-11 SH 1 of 1 UNIT 2
16.6 Revised per 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE LAYOUT AND IDENTIFICATION OF WALLS AND SLABS FOR EAST MAIN COOK NUCLEAR PLANT STEAM ENCLOSURE, WEST MAIN STEAM ENCLOSURE, MAIN STEAM NUCLEAR GENERATION GROUP ACCESSWAY BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-1 SH 1 of 1 16.6 UNIT 2REVISED PER 99-UFSAR-1345
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Isometric View of Main Steam Enclosure Accessway COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP West of Containment BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-2 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed & One Edge COOK NUCLEAR PLANT Unsupported Subjected to Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-3 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-4 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Concentrated Point Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-5 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at the Free NUCLEAR GENERATION GROUP Edge BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-6 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Patterns for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at Interior NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-7 SH 1 of 1 16.6 REVISED PER 99-UFSAR-1345 UNIT 2
REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-1 SH 1 of 1 1 of 4
1 of 8
16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE West Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-2 SH 1 of 1