MONTHYEARML24022A2262024-01-22022 January 2024 Submittal of the Inservice Inspection (ISI) Owners Activity Report (OAR) for the 24th Refueling Outage for Unit 3 CCN:22-14, Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 32022-01-31031 January 2022 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3 ML21041A4502021-02-0909 February 2021 (PBAPS) Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 2 ML20034E3322020-01-29029 January 2020 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 3 ML19308A0112019-10-31031 October 2019 Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval ML19233A1332019-08-21021 August 2019 Inservice Inspection Relief Request 15R-10 ML19050A3522019-02-19019 February 2019 Submittal of the Snubber Inservice Testing Program Plan for the Fifth 10-Year Interval ML19024A1952019-01-23023 January 2019 Results of Visual Inspections of Unit 2 Replacement Steam Dryer in the Second Refueling Outage After Reaching EPU Conditions ML19025A0312019-01-16016 January 2019 (Pbaps), Unit 2 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 22nd Refueling Outage for Unit 2 ML18337A1962018-11-29029 November 2018 Submittal of the Fifth Ten-Year Interval Inservice Testing Program Plan ML18030A1902018-01-30030 January 2018 Results of Visual Inspections of Unit 3 Replacement Steam Dryer ML17039A8842017-02-0909 February 2017 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 21st Refueling Outage ML16189A2182016-06-29029 June 2016 BWR Vessel and Internals Project - Vessel Internals Inspection Summaries for Fall 2015 Outages ML16118A4142016-04-27027 April 2016 Submittal of Relief Request Associated with the Fourth Inservice Testing Interval - Pressure Isolation Valve Leakage Testing Frequency ML16021A0892016-01-20020 January 2016 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (OAR) for the 20th Refueling Outage ML15225A5922015-08-13013 August 2015 Responds to Request for Additional Information Regarding Proposed Relief Request Associated with the Common Emergency Service Water (Esw)System Piping ML15068A3502015-03-0303 March 2015 Submittal of the In-Service Inspection (ISI) Owner'S Activity Report (Oar)For the 20th Refueling Outage for Unit 2 and Supplement to the 18 Refueling Outage OAR RS-14-316, Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure2014-10-29029 October 2014 Response to RAI - Proposed Alternative to Utilize Code Case N-513-3, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1, at a Higher System Operating Pressure ML14021A0462014-01-21021 January 2014 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage for Unit 3 ML13022A0302013-01-17017 January 2013 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 19th Refueling Outage ML12012A2192012-01-11011 January 2012 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage ML1100700232011-01-0505 January 2011 Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 18th Refueling Outage ML1001901312010-01-0808 January 2010 Submittal of Inservice Inspection (ISI) Owner'S Activity Report for the 17th Refueling Outage ML0903301712009-01-29029 January 2009 Submittal of Third Interval Inservice Inspection (ISI) Owners Activity Reports ML0832300562008-11-13013 November 2008 Submittal of Program for the Fourth Ten-Year Interval Inservice Testing Program ML0806405872008-02-29029 February 2008 Submittal of Relief Requests Associated with the Third and Fourth Inservice Inspection (Lsi) Intervals and the First and Second Containment Inservice Inspection (Cisi) Intervals RS-07-058, Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements2007-04-19019 April 2007 Amergen/Exelon Nuclear - Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements ML0212700072002-04-26026 April 2002 Submittal of the Third 10-Year Interval First Inspection Period, Inservice Inspection Owners Activity Report 2024-01-22
[Table view] Category:Letter type:CCN:
MONTHYEARCCN:23-09, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information CCN:23-63, Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks2023-08-11011 August 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks CCN:22-15, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/212022-01-31031 January 2022 (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/21 CCN:22-14, Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 32022-01-31031 January 2022 Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 23rd Refueling Outage for Unit 3 CCN:21-65, Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks2021-07-23023 July 2021 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks 2023-08-11
[Table view] |
Text
10CFR 50.55a CCN: 22-14 January 31, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS) Unit 3 Renewed Facility Operating License No. DPR-56 NRC Docket No. 50-278
Subject:
Submittal of the lnservice Inspection (ISI) Owner's Activity Report (OAR) for the 23rd Refueling Outage for Unit 3 Attached is the ISI Owner's Activity Report for the 23rd refueling cycle covering ISI activities associated with the first period of the 5th ISI inspection interval for Unit 3. This report is submitted in accordance with 10CFR 50.55a(b)(2)(xxxii); the ASME Section XI, Article IWA-6200; and ASME Code Case N-532- 5.
If you have any questions or require additional information, please contact Ben Jordan at 267-533-1761.
Sincerely, David A. Henry Acting Site Vice President Peach Bottom Atomic Power Station Attachment cc: USNRC, Regional Administrator, Region 1 USNRC, Senior Resident Inspector, PBAPS W. DeHaas, Commonwealth of Pennsylvania S. Seaman, State of Maryland B. Watkins, PSEG
FORM OAR-1 OWNERS ACTIVITY REPORT Report Number P3R23 Plant Peach Bottom Atomic Power Station, 1848 Lay Road, Delta, PA 17314 Unit No. 3 Commercial Service Date December 23, 1974 Refueling Outage Number P3R23 (if applicable)
Current Inspection Interval ISI = Fifth Inspection Interval / CISI = Third Inspection Interval (1st, 2nd, 3rd, 4th, other)
Current Inspection Period First Inspection Period (ISI and Containment ISI)
(1st, 2nd, 3rd )
Edition and Addenda of Section XI applicable to the Inspection Plans ASME Section XI 2013 Edition (5th ISI/3rd CISI Interval) 5th/3rd Interval Plans, ER-PB-330-1001 Rev. 3 (8/13/2020), Rev. 4 (10/16/2020), Rev. 5 Date and Revision of Inspection Plans (9/16/2021)
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used: N-432-1, N-513-4, N-516-3, N-532-5, N-561-2, N-562-2, N-597-2, N-606-1, N-613-2, N-638-6, N-639, N-641, N-648-1, N-651, N-653-1, N-661-2, N-666-1, N-695-1, N-696-1, N-702, N-711-1, N-716-1, N-730-1, N-733, N-735, N-747, N-749, N-751, N-769-2, N-771, N-773, N-786-1, N-789, N-795, N-798, N-800, N-805, N-823-1, N-824, N-825, N-829, N-830, N-831, N-838, N-839, N-843, N-845, N-854 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of P3R23 conform to the requirements of Section XI (refueling outage number)
Digitally signed by Jordan, Jordan, Benjamin M.
Date: 2022.01.27 12:05:18 Signed Benjamin M. -05'00' Benjamin Jordan, ISI Program Owner Date 1/26/2021 (Owner or Owners designee. Title)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Digitally signed by Kan, Jordan Date: 2022.01.28 07:05:14 -05'00' Commissions 14396 R, N, I, C PA3045 (Inspectors Signature) (National Board Number and Endorsement)
Date January 28, 2022 Page 1 of 3
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Examination Item Category Number Item Description Evaluation Description As found condition evaluated by Support 12DCN-S6 found with loose engineering and determined to be F-A 1.10A lower lock nut acceptable with no corrective measures required.
Page 2 of 3
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number 14 of HPSW Replacement of low margin 3 Piping - RBCCW piping 07/31/2020 20-087 Room 3-32GB-S58 Added new shim to support to 3 6/07/2021 21-087 Support restore design configuration 3BP042/3DP042 Replaced bolting on HPSW 3 08/27/2021 21-103/104 Bolting Pumps due to corrosion 3-32GB-S59 Added new shim to support to 3 08/31/2021 21-102 Support restore design configuration Replaced 1 stud and 1 nut on 1 AO-3-01A-086A 10/31/2021 21-078 MSIV Replaced 2 studs and 3 nuts on 1 AO-3-01A-086D 11/01/2021 21-081 MSIV MC AO-3-07B-3521B Replaced 16 studs and 20 nuts 10/30/2021 21-117 Page 3 of 3