COL Docs - Subject: VEGP 3&4 – Acceptance of Exemption Applicability of 10 CFR 26.3
ML21321A324
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/17/2021
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML21321A324 (2)


Text

From: Gleaves, Billy Sent: Wednesday, November 17, 2021 2:47 PM To: Leighty, Steven Cc: Vogtle PEmails; Santos, Cayetano; Hall, Victor; Harris, Paul; Vazquez, Justin

Subject:

SUBJECT:

VEGP 3&4 - Acceptance of Exemption Applicability of 10 CFR 26.3 (EPID L-2021-LLE-0051)

Steve,

By letters dated November 5 and November 12, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML21309A546 and ML21316A255), SNC submitted a request for an exemption for VEGP 3&4. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this exemption. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the exemption in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal and discussions during the post -licensing meeting on November 10, 2021, the NRC staff has estimated that this licensing request will take approximately 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete. The NRC staff expects to complete this review by approximately December 20, 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me.

Billy

William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 628

Mail Envelope Properties (MN2PR09MB4843ABDAA5D12CB130D031A49F9A9)

Subject:

SUBJECT:

VEGP 3&4 - Acceptance of Exemption Applicability of 10 CFR 26.3 (EPID L-2021-LLE-0051)

Sent Date: 11/17/2021 2:47:01 PM Received Date: 11/17/2021 2:47:05 PM From: Gleaves, Billy

Created By: Bill.Gleaves@nrc.gov

Recipients:

"Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None "Santos, Cayetano" <Cayetano.Santos@nrc.gov>

Tracking Status: None "Hall, Victor" <Victor.Hall@nrc.gov>

Tracking Status: None "Harris, Paul" <Paul.Harris@nrc.gov>

Tracking Status: None "Vazquez, Justin" <Justin.Vazquez@nrc.gov>

Tracking Status: None "Leighty, Steven" <sleighty@southernco.com>

Tracking Status: None

Post Office: MN2PR09MB4843.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 2784 11/17/2021 2:47:05 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: