ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage
From kanterella
(Redirected from ML21305B855)
Jump to navigation
Jump to search
Letter Sequence Request | |
---|---|
EPID:L-2021-LRO-0060, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage (Approved, Closed) | |
Administration | |
MONTHYEARET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021
[Table View]Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage Project stage: Request ML22045A4512022-02-14014 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Steam Generator Inspection Report 24th Refueling Project stage: RAI ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report Project stage: Request ML22124A0062022-05-0505 May 2022 Review of the Spring 2021 Refueling Outage 24 Steam Generator Tube Inservice Inspection Report Project stage: Approval 2022-02-14 |
ML21305B855 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 11/01/2021 |
From: | Shawn Smith Wolf Creek |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
ET 21-0009 | |
Download: ML21305B855 (160) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24296B1902024-10-22022 October 2024
[Table view]10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23075A0742023-03-16016 March 2023 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 25 Owner’S Activity Report ML23075A1632023-03-16016 March 2023 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 25 Owner’S Activity Report ML22124A0062022-05-0505 May 2022 Review of the Spring 2021 Refueling Outage 24 Steam Generator Tube Inservice Inspection Report ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ML21217A3342021-08-0505 August 2021 Inservice Inspection Program Fourth Interval, Second Period, Refueling Outage 24 Owner'S Activity Report ML21217A3352021-08-0505 August 2021 Containment Inservice Inspection Program Third Interval, First Period, Refueling Outage 24 Owner'S Activity Report ML20042C8922020-02-0404 February 2020 Containment Inservice Inspection Program Third Interval, First Period, Refueling Outage 23 Owner'S Activity Report ML20042C8962020-02-0404 February 2020 Lnservice Inspection Program Fourth Interval, Second Period, Refueling Outage 23 Owner'S Activity Report ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ML18234A1312018-08-14014 August 2018 Lnservice Inspection Program Fourth Interval, First Period, Refueling Outage 22 Owner'S Activity Report ML18234A1322018-08-14014 August 2018 Submittal of Containment Inservice Inspection Program Second Interval, Third Period, Refueling Outage 22 Owner'S Activity Report ET 17-0008, Results of the Twentieth Steam Generator Tube Lnservice Inspection2017-05-0202 May 2017 Results of the Twentieth Steam Generator Tube Lnservice Inspection ET 17-0007, CFR 50.55a Request 14R-05 for the Fourth Inservice Inspection Program Interval2017-04-13013 April 2017 CFR 50.55a Request 14R-05 for the Fourth Inservice Inspection Program Interval ET 16-0005, Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval2016-02-23023 February 2016 Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval ET 15-0024, Results of the Nineteenth Steam Generator Tube Inservice Inspection2015-10-20020 October 2015 Results of the Nineteenth Steam Generator Tube Inservice Inspection ET 15-0022, Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 02015-09-0202 September 2015 Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 0 ML15217A0222015-07-28028 July 2015 Containment Inservice Inspection Program Second Interval, Second Period, Refueling Outage 20 Owner'S Activity Report ML15222A2512015-07-28028 July 2015 Inservice Inspection Program Third Interval, Third Period, Refueling Outage 20 Owner'S Activity Report ET 14-0018, 10CFR50.55a Request I3R-10 for Third Inservice Inspection Program Interval2014-06-26026 June 2014 10CFR50.55a Request I3R-10 for Third Inservice Inspection Program Interval ML14174B1232014-06-25025 June 2014 Review of 18th Steam Generator Tube Inspection Report ET 13-0030, Results of the Eighteenth Steam Generator Tube Inservice Inspection2013-09-30030 September 2013 Results of the Eighteenth Steam Generator Tube Inservice Inspection ML13199A2362013-07-11011 July 2013 Submittal of Containment Inservice Inspection Program Second Interval, Second Period, Refueling Outage 19 Owner'S Activity Report ET 11-0008, (WCGS) - Results of the Seventeenth Steam Generator Tube Inservice Inspection2011-10-19019 October 2011 (WCGS) - Results of the Seventeenth Steam Generator Tube Inservice Inspection ML11263A1492011-09-13013 September 2011 Containment Inservice Inspection Program Second Interval, First Period, Refueling Outage 18 Owner'S Activity Report ML11263A1482011-09-13013 September 2011 Inservice Inspection Program Third Interval, Second Period, Refueling Outage 18 Owner'S Activity Report ET 10-0012, Results of the Sixteenth Steam Generator Tube Inservice Inspection2010-04-0808 April 2010 Results of the Sixteenth Steam Generator Tube Inservice Inspection ML1004907522010-02-0909 February 2010 Submittal of Inservice Inspection Program Third Interval, Second Period, Refueling Outage 17 Owner'S Activity Report ML0822603672008-08-0606 August 2008 Containment Inservice Inspection Program First Interval, Third Period, Owner'S Activity Reports ML0822603412008-08-0606 August 2008 Inservice Inspection Program Third Interval, First Period, Refueling Outage 16 Owner'S Activity Report ML0704304622007-01-31031 January 2007 Containment Inservice Inspection Program First Interval, Third Period, Refueling Outage 15 Owner'S Activity Report RA-07-0012, Inservice Inspection Program Third Interval, First Period, Refueling Outage 15 Owner'S Activity Report2007-01-31031 January 2007 Inservice Inspection Program Third Interval, First Period, Refueling Outage 15 Owner'S Activity Report ML0614503192006-05-19019 May 2006 10 CFR 50.55a Request I3R-05, Installation and Examination of Full Structural Weld Overlays for Repairing/Mitigating Pressurizer Nozzle-to-Safe End Dissimilar Metal Welds and Adjacent Safe End-to Piping Stainless Steel Welds ET 06-0011, CFR 50.55a Requests I2R-34, I2R-35, I2R-36, I2R-37, and I2R-38 for the Second Inservice Inspection Program Interval2006-03-0202 March 2006 CFR 50.55a Requests I2R-34, I2R-35, I2R-36, I2R-37, and I2R-38 for the Second Inservice Inspection Program Interval ET 06-0010, Inservice Inspection Program Plan for the Third Ten-Year Interval and 10 CFR 50.55a Requests I3R-01, I3R-02, and I3R-042006-03-0202 March 2006 Inservice Inspection Program Plan for the Third Ten-Year Interval and 10 CFR 50.55a Requests I3R-01, I3R-02, and I3R-04 ET 06-0001, Revision to Technical Specification 5.5.8, Inservice Testing Program to Adopt Technical Specification Task Force Standard Technical Specification Change Traveler, TSTF-479, Revision 02006-02-0101 February 2006 Revision to Technical Specification 5.5.8, Inservice Testing Program to Adopt Technical Specification Task Force Standard Technical Specification Change Traveler, TSTF-479, Revision 0 ET 05-0004, Steam Generator Tube Plugging Report2005-05-0404 May 2005 Steam Generator Tube Plugging Report WM 04-0046, Results of the Twelfth Steam Generator Tube Inservice Inspection2004-10-27027 October 2004 Results of the Twelfth Steam Generator Tube Inservice Inspection WM 04-0008, Request to Extend the Second 10-year Inservice Inspection (ISI) Interval for Reactor Pressure Vessel Examinations, 10 CFR 50.55a Request 12R-282004-04-15015 April 2004 Request to Extend the Second 10-year Inservice Inspection (ISI) Interval for Reactor Pressure Vessel Examinations, 10 CFR 50.55a Request 12R-28 ET 03-0006, Implementation of the ASME Code for Operation and Maintenance of Nuclear Power Plants, Regarding the Check Valve Monitoring Program2003-08-26026 August 2003 Implementation of the ASME Code for Operation and Maintenance of Nuclear Power Plants, Regarding the Check Valve Monitoring Program ML0319704482003-07-0808 July 2003 Inservice Inspection Program Second Interval, Second Period Owner'S Activity Reports ET 02-0046, Results of Eleventh Steam Generator Tube Inservice Inspection2002-12-11011 December 2002 Results of Eleventh Steam Generator Tube Inservice Inspection ET 02-0049, Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports2002-11-0404 November 2002 Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports 2024-09-04 Category:Letter type:ET MONTHYEARET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023
[Table view]CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen2023-03-16016 March 2023 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications2023-03-0101 March 2023 License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2023-02-0707 February 2023 Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-12-0101 December 2022 Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2022-08-0202 August 2022 License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ET 22-0012, Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-07-12012 July 2022 Supplement to License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0011, Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface2022-05-31031 May 2022 Withdrawal of 10 CFR 50.55a Request I4R-08, Relief for Extension of Follow-up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surface ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2022-04-13013 April 2022 Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 22-0003, CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads2022-04-0606 April 2022 CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads ET 22-0002, Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head .2022-04-0404 April 2022 Operating Corp 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination and Visual Examination Requirements for Reactor Pressure Vessel Head . ET 22-0004, Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report2022-03-15015 March 2022 Operating Corp - Response to Request for Confirmation of Information (RCI) Regarding Steam Generator Tube Inspection Report ET 22-0001, Removal of the Table of Contents from the Technical Specifications2022-01-12012 January 2022 Removal of the Table of Contents from the Technical Specifications ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ET 21-0015, Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-20020 October 2021 Withdrawal of License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating2021-09-29029 September 2021 License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-09-29029 September 2021 License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-1912021-08-12012 August 2021 Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 20-0013, Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415)2020-10-26026 October 2020 Response to Request for Additional Information Re Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (TSTF-415) ET 20-0011, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-10-0101 October 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers2020-06-0808 June 2020 License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ET 20-0008, Operating Corporation Update for Full Implementation of Open Phase Detection System2020-05-20020 May 2020 Operating Corporation Update for Full Implementation of Open Phase Detection System ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2020-04-27027 April 2020 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12020-01-29029 January 2020 Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 ET 19-0021, Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-12-0909 December 2019 Errata for Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation2019-11-13013 November 2019 Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-09-10010 September 2019 Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0018, Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-08-22022 August 2019 Supplement to License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0014, lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 12019-08-15015 August 2019 lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2019-03-18018 March 2019 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange2019-02-25025 February 2019 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-01-23023 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 ET 18-0032, Operating Corporation Change of Date for Full Implementation of Open Phase Detection System2018-12-0707 December 2018 Operating Corporation Change of Date for Full Implementation of Open Phase Detection System ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0014, Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-05-29029 May 2018 Response to Request for Additional Information Regarding the License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0013, Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld2018-05-0202 May 2018 Relief Request Number I4R-06, Request for Relief from ASME Code Case N-729-4 for Reactor Vessel Head Penetration Nozzle Weld ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 18-0010, Financial Protection Levels2018-03-29029 March 2018 Financial Protection Levels ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2018-02-15015 February 2018 Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ET 18-0005, Withdrawal of License Amendment Request for Revision to the Emergency Plan2018-02-0505 February 2018 Withdrawal of License Amendment Request for Revision to the Emergency Plan ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term 2023-05-17 |