ML21272A386

From kanterella
Jump to navigation Jump to search
Motion to Amend Contention Out of Time and Motion to Re-Open the Record by Beyond Nuclear, Sierra Club, and Alliance for Progressive Virginia
ML21272A386
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/29/2021
From: Curran D
Alliance for Progressive Virginia (APV), Beyond Nuclear, Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, Sierra Club
To:
NRC/SECY
SECY RAS
References
50-338-SLR, 50-339-SLR, ASLBP 21-970-01-SLR-01, RAS 56249
Download: ML21272A386 (31)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE SECRETARY

)

In the Matter of

)

Virginia Electric Power Co.

) Docket Nos. 50-338/339 SLR North Anna Power Station Units 1 & 2

)

___________________________________ )

MOTION TO AMEND CONTENTION OUT OF TIME AND MOTION TO RE-OPEN THE RECORD BY BEYOND NUCLEAR, SIERRA CLUB, AND ALLIANCE FOR PROGRESSIVE VIRGINIA I.

INTRODUCTION Pursuant to 10 C.F.R. §§ 2.309(c) and 2.326, Beyond Nuclear, Inc.; the Sierra Club, Inc.;

and Alliance for a Progressive Virginia, Inc. (hereinafter Petitioners/Appellants) hereby submit to the Secretary of the U.S. Nuclear Regulatory Commission (NRC) a motion to amend the basis statement of their single contention in this proceeding for review of Virginia Electric Power Cos (VEPCOs) application for subsequent license renewal (SLR) for the North Anna nuclear power plant, Units 1 and 2. Petitioners/Appellants seek to amend their contention to address the significance of a new statement by the NRC Staff in the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 7, Second Renewal Regarding Subsequent License Renewal for North Anna Power Station Units 1 and 2 (August 2021) (Draft SGEIS). In addition, because the record of this proceeding is now closed, Petitioners/Appellants move to re-open the record.

This pleading is organized as follows: Section II presents factual and procedural background.Section III presents Petitioners/Appellants amended contention.Section IV presents Petitioners/Appellants motion to amend the contentions basis statement.Section V presents Petitioners/Appellants motion to re-open the record.Section VI presents

2 Petitioners/Appellants demonstration of representational standing to re-open the record. And Section VII presents Petitioners conclusion.

II.

FACTUAL AND PROCEDURAL BACKGROUND A. VEPCOs SLR Application and Petitioners/Appellants Hearing Request This proceeding began in the fall of 2020, with NRCs publication of a hearing notice on VEPCOs SLR application.1 On December 14, 2020, Petitioners/Appellants submitted a Hearing Request, contending that VEPCO violated the National Environmental Policy Act (NEPA) and NRC implementing regulations by failing to address, in its SLR application, the environmental significance of a beyond-design-basis earthquake that occurred in 2011 less than ten miles from the reactors, in Mineral, Virginia (the Mineral Earthquake).2 As contended by Petitioners/Appellants, by exceeding the seismic design limit for the reactors, the Mineral Earthquake fatally undermined previous NRC generic environmental findings, relied on by VEPCO in its SLR application, that the environmental impacts of operating North Anna Units 1 and 2 are small because the reactors will operate within their design bases. The full text of the contention stated as follows:

Dominions Environmental Report fails to satisfy NEPA or NRC implementing regulations 10 C.F.R. §§ 51.53(c)(2) and 51.45(a), because it does not address the environmental impacts of operating North Anna Units 1 and 2 during the extended SLR term under the significant risk of an earthquake that exceeds the design basis for the reactors. The significance of the environmental risk posed by earthquakes to North Anna was conclusively demonstrated by a 2011 earthquake whose epicenter was a short distance from the two reactors and whose ground motion exceeded the design basis levels for both reactors. By exceeding the reactors design basis, the earthquake disproved the assumption underlying the NRCs issuance of operating licenses in 1978 (for Unit 1) and 1980 (for Unit 2) and renewal of those licenses 2003, that the reactors could be operated 1 85 Fed. Reg. 65,438 (Oct. 15, 2020) 2 Hearing Request and Petition to Intervene by [named Appellants] and Petition for Waiver of 10 C.F.R. §§ 51.53(c)(3)(i), 51.71(d), and 51.95(c)(1) to Allow Consideration of Category 1 NEPA Issues at 13-30 (Dec. 14, 2020) (Hearing Request).

3 safely and without significant adverse environmental impacts because their SSCs were built to a design basis of sufficient rigor to protect against likely earthquakes. Because that assumption has been proven wrong, a new Environmental Impact Statement must be created that analyzes this additional, proven risk.

While the NRC approved restart of the reactors after their post-earthquake shutdown, an operability determination for purposes of enforcing NRC standards is distinct from the review of environmental impacts that must be conducted in the SLR licensing decision that is now before the NRC. Dominion must fully comply with 10 C.F.R. §§ 51.53(c)(2) and 51.45(a) by addressing the probability and consequences of accidents caused or contributed to by earthquakes during a second license renewal term.

The analysis in the Environmental Report should include a discussion of the cumulative effects of operation during the SLR term, including the effects of earthquakes on SSCs whose ability to prevent or mitigate earthquake effects may be compromised by the long-term aging effects. Aging problems associated with SSCs, including reactor pressure vessel embrittlement, irradiation-assisted stress corrosion cracking of reactor internals, concrete structures and containment degradation, and electrical cable qualification and condition assessment, were identified in SECY-14-0016, Memorandum from Mark A.

Satorius, NRC Executive Director of Operations, to NRC Commissioners, re: Ongoing Staff Activities to Assess Regulatory Considerations for Power Reactor Subsequent License Renewal at 1 (Jan. 31, 2014) (ML14050A306) and the NRCs five-volume Expanded Materials Degradation Assessment (EMDA), NUREG/CR-7153 (Oct. 2014)

(EMDA Report).3 Petitioners/Appellants also sought a waiver of NRC regulations that arguably bar their Hearing Request.4 B. ASLB Decision Denying Admission of Petitioners/Appellants Single Contention On March 21, 2021, after reviewing the pleadings and conducting an oral argument, the Atomic Safety and Licensing Board (ASLB) issued LBP-21-04, denying admission of Petitioners/Appellants contention and their waiver petition, on the ground, inter alia, that the Mineral Earthquake did not present special circumstances or a significant environmental issue, because any plant can experience such a happenstance.5 According to the ASLB:

3 Id. at 13-14.

4 Id. at 30-36 (Waiver Petition).

5 Virginia Elec. Power Co. (North Anna Power Station, Units 1 and 2), LBP-21-04, _ N.R.C. _,

slip op. at 22 and 25 (LBP-21-04).

4 In this regard, the 2013 [Revised License Renewal GEIS, NUREG-1437, Rev. 1]

determined the environmental effects of seismically induced severe accidents using calculations from fourteen nuclear power units, which required the assumption that beyond DBEs are possible. See Revised GEIS Appendices at E-18 to -19 (tables E-4 and E-5). It thus is evident that the potential for a beyond DBE is not unique to North Anna, but an essential assumption associated with the design and licensing of all nuclear power plants.6 Because no other parties had sought a hearing, the ASLB terminated the proceeding.7 C. Petitioners Appeal of LBP-21-04 Petitioners/Appellants appealed LBP-21-04 on April 28, 2021.8 In their brief, Petitioners/Appellants strongly disputed the ASLBs characterization of the Mineral Earthquake:

To describe as a happenstance an earthquake that exceeded the North Anna design basis is utterly inconsistent with the NRCs regulatory premise for allowing North Anna to operate in the first place. In both its initial licensing decision and its 2003 license renewal decision for the North Anna reactors, the NRC founded both its Atomic Energy Act-based no undue risk finding and its NEPA-based no significant impacts finding on the assumption that the design basis for the reactors anticipated the most serious earthquake that would occur in the region. And the rigor of the design approved by NRC was based on the assumption that an earthquake having the severity of the historic 1875 earthquake would happen only once during the reactors operating life. Those assumptions have now been undermined by the Mineral Earthquake. In the NRCs regulatory scheme, the occurrence of an earthquake that exceeds the bounds of a reactors original design is not a chance event, but a profound challenge to the underpinning of the public assurances of safety and environmental protection made by the agency in its regulatory regime.9 The Commission has yet to rule on Petitioners/Appellants appeal, and thus the legal validity of the ASLBs ruling remains in dispute.

6 Id., slip op. at 22-23.

7 Id., slip op. at 36.

8 Notice of Appeal of LBP-21-04 by Beyond Nuclear, Sierra Club, and Alliance for Progressive Virginia; Brief on Appeal of LBP-21-04 by Beyond Nuclear, Sierra Club, and Alliance for Progressive Virginia. (Appeal Brief). Petitioners/Appellants filed a corrected brief on April 28, 2021.

9 Appeal Brief at 22-23.

5 D. NRC Staffs Issuance of Draft SGEIS In late August 2021, the NRC issued a Draft SGEIS for the North Anna SLR application.

In its discussion of Design-Basis Accidents (Section F.1.1), the Draft SEIS states that:

Design-basis accidents are postulated accidents that a nuclear facility must be designed and built to withstand without loss to the systems, structures, and components necessary to ensure public health and safety. Planning for design-basis accidents ensures that the proposed plant can withstand normal transients (e.g., rapid changes in the reactor coolant system temperature or pressure, or rapid changes in reactor power), as well as a broad spectrum of postulated accidents without undue hazard to the health and safety of the public. Many of these design-basis accidents may occur, but are unlikely to occur, even once during the life of the plant; nevertheless, carefully evaluating each design-basis accident is crucial to establishing the design basis for the preventive and mitigative safety systems of the proposed nuclear power plant. Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities, and 10 CFR Part 100, Reactor Site Criteria, describe the NRCs acceptance criteria for design-basis accidents.10 The SGEIS is the first iteration of the License Renewal GEIS in which the NRC Staff has made that design-basis accidents may occur during the life of a nuclear reactor, i.e., they are expected to occur.11 Furthermore, as discussed in Section III.B below, that assertion is wrong.

Thus, Petitioners/Appellants now seek to amend the basis of their contention.

III.

CONTENTION: AMENDED BASIS STATEMENT Like Dominions Environmental Report, the Draft Supplemental GEIS fails to satisfy NEPA or NRC implementing regulations 10 C.F.R. §§ 51.53(c)(2) and 51.45(a), because it does not address the environmental impacts of operating North Anna Units 1 and 2 during the 10 Id. at F F-2 (emphasis added).

11 No such assertion can be found in the NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (May 1996) (ML040690705, ML040690738)

(1996 License Renewal GEIS); NUREG-1437, Supp. 7, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 7 Regarding North Anna Power Station, Units 1 and 2 (Nov. 2002) (ML1023380542) (2002 North Anna SGEIS for Initial License Renewal); or NUREG-1437, Rev. 1 (June 2013) (ML13106A241) (2013 Revised License Renewal GEIS)

6 extended SLR term under the significant risk of an earthquake that exceeds the design basis for the reactors. Thus, Petitioners/Appellants do not change their contention other than to now confirm that the Draft Supplemental GEIS has not changed the deficiencies in the Environmental Report that were identified in Petitioners/Appellants contention.

However, in Section III.B below, Petitioners amend the basis statement of their contention to address a new assertion, which did not appear in the Environmental Report but now appears in the Draft Supplemental GEIS: that the NRC expects design-basis accidents to occur during the life of a reactor. The Staff does not present this as a new idea, but rather inserts it, without comment, into the familiar prose of the License Renewal GEIS regarding the NRCs reliance on the design basis of nuclear reactors to ensure that their environmental impacts will be insignificant - as if it were always there. This subterfuge appears designed to buttress the ASLBs characterization of design-basis accidents as happenstance and justify VEPCOs and the Staffs utter failure to address the environmental significance for North Anna of the occurrence of the Mineral Earthquakes.

As discussed in Petitioners/Appellants Amended Basis Statement, however, the NRC has never stated, in either the context of NEPA or its Atomic Energy Act-based regulatory scheme, that it expects design-basis accidents to occur. And indeed, that notion violates that NRCs most basic principles of reactor design under the Atomic Energy Act. Therefore, Petitioners/Appellants seek to amend the basis statement to contest the legal validity of the Staffs assertion.

7 A. Statement of Contention As discussed above, Petitioners/Appellants do not change their contention other than to now confirm that the Draft Supplemental GEIS has not changed the deficiencies in the Environmental Report that were identified in Petitioners/Appellants contention.

B. Amended Basis Statement In LBP-21-04, the ASLB described the 2011 Mineral Earthquake as a happenstance" and stated it is evident that the potential for a beyond DBE is not unique to North Anna, but an essential assumption associated with the design and licensing of all nuclear power plants.12 Consistent with the ASLBs holding, the Draft SEIS for North Anna License Renewal contains the statement that [m]any of these design-basis accidents may occur, but are unlikely to occur, even once during the life of the plant.13 The Staffs statement suggests that in licensing nuclear reactors, the NRC anticipates that a design-basis accident - such as a design-basis earthquake - may occur more than once at a single reactor, without raising safety or environmental concerns. But this assertion is inconsistent with the NRCs basic principles of nuclear reactor licensing and regulation, as reflected in NRC Staff guidance documents. The NRCs Standard Review Plan, for example, makes clear that the NRC does not anticipate that a design-basis accident will occur at all. Postulated accidents (i.e., design basis accidents) are defined as unanticipated occurrences (i.e., they are postulated but not expected to occur during the life of the nuclear power plant.).14 In contrast, Anticipated 12 LBP-21-04, slip op. at 22-23.

13 Id. at F F-2 (emphasis added).

14 NUREG-0800, Standard Review Plan at 15.0-3 (Rev. 3, March 2007) (emphasis added). The Standard Review Plan defines design-basis accidents as Postulated accidents that are used to set design criteria and limits for the design and sizing of safety-related systems and components. Id. at 15.0-14.

8 Operational Occurrences or AOOs are those conditions of normal operation that are expected to occur one or more times during the life of the nuclear power plant.15 A license application must include a categorization of events as either an AOO or a postulated accident.16 As required by the Standard Review Plan, VEPCO categorized the design-basis earthquake as a postulated accident, stating that it took what was found to be the largest reported shock in the Piedmont Province and postulated its occurrence in the vicinity of the site.17 The ASLB, in characterizing the Mineral Earthquake as happenstance, confused design basis accidents with anticipated operational occurrences. For instance, the ASLB correctly observed that 10 C.F.R. Part 100 § V(a)(2) provides that a facilitys OBE [operating basis earthquake] may be exceeded without causing a severe accident, directing in such a circumstance the actions that must be completed prior to resuming operation after such an incident.18 While an OBE may occur more than once without causing a severe accident, that is not the case for a design-basis earthquake (DBE, also known as a Safe Shutdown Earthquake (SSE)). The value of an OBE typically is only half the value of the DBE or SSE, and this is also the case for North Anna Units 1 and 2.19 Thus, North Anna was not licensed to experience more than one earthquake that met or exceeded its design basis. Id.

15 Id. at 15.0-2.

16 Id. at 15.0-8.

17 UFSAR at 2C-2. See also id. at 2C-7, stating that [w]e do not feel that events larger than those postulated in our original report are probable for this portion of the Virginia Piedmont.

18 Id.

19 See NUREG/CR-7230, Seismic Design Standards and Calculational Methods in the United States and Japan at 25 (May 2017) (ML17131A127)). The Updated Final Safety Analysis Report (UFSAR) for North Anna Units 1 and 2 represents that Class I piping systems are

9 Thus, the SGEIS assertion that many design basis accidents can be expected to occur is inconsistent with the NRCs regulatory scheme. As discussed above in Section III.A, it is also inconsistent with the design basis accident analyses in all previous iterations of the License Renewal GEIS.

Finally, the Staffs attempt to quietly insert a new and unlawful analytical concept into its description of a well-established and longstanding environmental analysis, as if it had always been there, must be rejected because it lacks the transparency and scientific integrity required by NEPA. Hughes River Watershed Conservancy v. Agriculture Dept., 81 F.3d 437, 446 (4th Cir.

1996) (rejecting environmental analysis based on misleading assumptions); Calvert Cliffs Coordinating Committee v. AEC, 449 F.2d 1109, 1115 (D.C. Cir. 1971) (requiring good faith consideration of environmental factors).

C. Demonstration that the Amended Basis Statement is Within the Scope of the Proceeding The Amended Basis Statement is within the scope of the SLR proceeding for North Anna Units 1 and 2 because it supports Petitioners/Appellants claims seeking compliance by VEPCO and the NRC NEPA and NRC implementing regulations.

D. Demonstration that the Amended Basis Statement is Material to the Findings NRC Must Make to Renew Dominions Operating License The Amended Basis Statement is material to the findings NRC must make regarding the environmental impacts of re-licensing North Anna Units 1 and 2 for a second renewed license term, because it supports Petitioners/Appellants challenge to the adequacy of Dominions Environmental Report to support those findings.

qualified to withstand a total of five operational-basis earthquake (OBE) (one-half safe-shutdown earthquake) and one design-basis earthquake (DBE). Id. at 3.7-35.

10 IV.

MOTION TO FILE AMENDED BASIS STATEMENT AFTER THE DEADLINE FOR INITIAL HEARING REQUESTS Petitioners/Appellants respectfully submit that this motion satisfies the three requirements of 10 C.F.R. § 2.309(c)(1) for establishing good cause to submit a contention after the initial deadline for filing hearing requests. First, the information on which the Amended Basis Statement relies was not previously available because the contents of the Draft SEIS were unknown until it was published by the NRC in August. 10 C.F.R. § 2.309(c)(1)(i).

Second, as discussed in the Amended Basis Statement, the information upon which the amendment to the contentions is based is materially different from the information that was previously available in VEPCOs Environmental Report or in any other environmental document related to VECOs SLR application. 10 C.F.R. § 2.309(c)(1)(ii). The statement that the NRC expects many design-basis accidents to occur does not appear in the Environmental Report, the 1996 License Renewal GEIS, the 2013 Revised License Renewal GEIS, or the 2002 SGEIS for North Anna. In fact, that is one of the key points of the Amended Basis Statement.

Finally, this motion has been submitted in a timely fashion based on the availability of the subsequent information, i.e., within 30 days of receiving the Draft SGEIS from the NRC. 10 C.F.R. § 2.309(c)(1)(iii). See also Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), LBP-07-15, 66 N.R.C. 261, 266 n.11 (2007) (finding that timeliness of contentions depends on the facts and circumstances of each situation and noting the general application of a 30-day period by many licensing board panels).20 20 Petitioners/Appellants received a copy of the SGEIS for North Anna on August 30, 2021, under cover of an e-mail from Scheera Whitaker of the NRC.

11 V.

MOTION TO RE-OPEN THE RECORD NRC regulations require that a motion to reopen the record must be timely; it must address a significant safety or environmental issue; and it must demonstrate that a materially different result would be or would have been likely had the newly proffered evidence been considered initially. 10 C.F.R. § 2.326(a). A motion to reopen also must be accompanied by affidavits that set forth the factual and/or technical bases for the movants claim to have satisfied those criteria. 10 C.F.R. § 2.326(b). Petitioners/Appellants satisfy all of these standards.

First, as discussed in Section IV above, this motion is timely under 10 C.F.R. § 2.326(a)(1),

because it is being submitted within a reasonable period (i.e., 30 days) of receiving the Draft SGEIS, the subject of Petitioners/Appellants Amended Basis Statement.

Second, pursuant to 10 C.F.R. § 2.326(a)(2), the Amended Basis Statement raises a significant environmental issue, because it challenges the legal validity of the NRCs key rationale for refusing to address the environmental significance of the 2011 Mineral Earthquake for the proposed second renewal of the operating licenses for Units 1 and 2. The Amended Basis Statement also raises a significant environmental issue by challenging a self-serving attempt by the NRC Staff to rewrite the NRCs well-established environmental analysis, inserting a whole new conceptual analytical approach that is neither consistent with the previous versions of the License Renewal GEIS or with the NRCs Atomic Energy Act-based regulatory regime for licensing of nuclear reactors. The NRC should ensure the integrity of its well-established programs for safety and environmental reviews are not undermined by the Staffs actions in this proceeding.

Furthermore, consideration by the Commission of Petitioners/Appellants Amended Basis Statement is likely to have a materially different result (10 C.F.R. § 2.326(a)(3)), because it

12 will prevent the Commission from relying on a legally erroneous rationale to excuse the Staff from conducting a complete and thorough evaluation of the environmental significance of the Mineral Earthquake for the continued operation of North Anna Units 1 and 2 in an extended license term.

Finally, pursuant to 10 C.F.R. 2.326(b), by submitting this motion, undersigned counsel certifies, under penalty of perjury, that the factual statements in this motion are true and correct to the best of her knowledge, and the legal conclusions are based on her best understanding of applicable regulations and judicial precedents as they apply to the Draft SGEIS for North Anna SLR. Undersigned counsel further certifies that she is competent to make these representations as Petitioners/Appellants attorney.

VI. DEMONSTRATION OF STANDING TO RE-OPEN THIS PROCEEDING Pursuant to 10 C.F.R. § 2.309(d), Petitioners/Appellants hereby demonstrate their representational standing to seek a re-opened hearing on the North Anna SLR application on behalf of their members. Petitioners/Appellants respectfully submit that the general legal requirements for establishment of representational standing in NRC proceedings remain the same as recited in their Hearing Request, and thus will not be repeated here.

A. Standing of Beyond Nuclear Beyond Nuclear is a nonprofit, nonpartisan membership organization that aims to educate and activate the public about the connections between nuclear power and nuclear weapons and the need to abolish both to protect public health and safety, prevent environmental harms, and safeguard our future. Beyond Nuclear advocates for an end to the production of nuclear waste and for securing the existing reactor waste in hardened on-site storage until it can be permanently disposed of in a safe, sound, and suitable underground repository. For more than fourteen years,

13 Beyond Nuclear has worked toward its mission by regularly intervening in NRC licensing, relicensing, and other proceedings related to nuclear safety matters.

Beyond Nuclears representational standing to participate in this proceeding is demonstrated by the attached declarations of its members: Second Declaration of Erica Gray (Sept. 21, 2021) (Attachment 2) and Second Declaration of Jerry Rosenthal (Sept. 20, 2021)

(Attachment 2).

B. Standing of the Sierra Club Founded in 1892, the Sierra Club is a national environmental organization with 3.8 million members across the United States. The purposes of the Sierra Club are to explore, enjoy, and protect the wild places of the earth; to practice and promote the responsible use of the earths ecosystems and resources; to educate and enlist humanity to protect and restore the quality of the natural and human environment; and to use all lawful means to carry out these objectives.

The Sierra Clubs representational standing to participate in this proceeding is demonstrated by the attached declarations of its members: Second Declaration of Barbara J. Cruickshank (Sept. 20, 2021) (Attachment 3); Second Declaration of John A. Cruickshank (Sept. 20, 2021)

(Attachment 4); Second Declaration of William J. Johnson (Sept. 21, 2021) (Attachment 5; Second Declaration of Steven Carter-Lovejoy (Sept. 20, 2021) (Attachment 6); and Declaration of Donna Shaunesy (Sept. 20, 2021) (Attachment 7).

C. Standing of Alliance for a Progressive Virginia Alliance for a Progressive Virginia is an all-volunteer, not-for-profit organization, whose goal is to educate and influence the public, the media and elected officials at the local, state and national levels about important issues of the day. APV is guided in this mission by the basic, common sense progressive values of economic fairness, social justice, and good government.

14 APVs representational standing to participate in this proceeding is demonstrated by the attached Second Declaration of Scott Price (Sept. 28, 2021) (Attachment 8).

VII. CONCLUSION For the foregoing reasons, Petitioners/Appellants have demonstrated good cause for the filing of their Amended Basis Statement after the original deadline for hearing requests. In addition, they have satisfied the NRCs standard for re-opening this proceeding to consider the Amended Basis Statement. Accordingly, their motions should be granted.

Respectfully submitted,

___/signed electronically by/__

Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.

1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240-393-9285 dcurran@harmoncurran.com September 29, 2021 CERTIFICATE OF COUNSEL PURSUANT TO 10 C.F.R. § 2.323(b)

I certify that on September 27, 2021, I contacted counsel for VEPCO and the NRC Staff in a sincere effort to resolve the issues raised in Petitioners/Appellants Motion to Re-open the Record. (Consultation was not required for the motion to file the Amended Basis Statement after the initial deadline for hearing requests). Counsel for both VEPCO and the Staff stated that they did not believe the proposed filing is justified, and that they intend to respond.

___/signed electronically by/__

Diane Curran

15 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE SECRETARY

)

In the Matter of

)

Virginia Electric Power Co.

)

Docket Nos. 50-338/339 SLR North Anna Power Station, Units 1 and 2

)

___________________________________ )

CERTIFICATE OF SERVICE I certify that on September 29, 2021, I posted MOTION TO AMEND CONTENTION OUT OF TIME AND MOTION TO RE-OPEN THE RECORD BY BEYOND NUCLEAR, SIERRA CLUB, AND ALLIANCE FOR PROGRESSIVE VIRGINIA and ATTACHMENTS 1 THROUGH 8 on the NRCs Electronic Information Exchange.

___/signed electronically by/__

Diane Curran

ATTACHMENT 1

ATTACHMENT 2

ATTACHMENT 3

ATTACHMENT 4

ATTACHMENT 5

ATTACHMENT 6

ATTACHMENT 7

ATTACHMENT 8