Text
April 28, 2021 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION
)
In the Matter of
)
Virginia Electric Power Co.
)
Docket Nos. 50-338/339 SLR North Anna Power Station, Units 1 and 2
)
___________________________________ )
ERRATA TO BRIEF ON APPEAL OF LBP-21-04 BY BEYOND NUCLEAR, SIERRA CLUB, AND ALLIANCE FOR A PROGRESSIVE VIRGINIA Appellants in this proceeding (Beyond Nuclear, Inc., Sierra Club, Inc., and Alliance for a Progressive Virginia, Inc.) hereby correct their Brief on Appeal of LBP 04 (Apr. 21, 2021) as follows. A corrected copy of the brief is also attached.
Page Line Correction Title 8
Add a after Alliance for 1
3 Insert a between for and Progressive 1
11 delete duplicate regulations 5 fn 10 1
delete v. NRC 5
13 Change together to together, 5 fn 12 6-7 Delete sentence starting with Taken together 8
12 Change earthquake to Earthquake 14 8
Change withut to without 14 17 change Again to Again,
2 23 15 insert the NRC after reactors, 25 fn 47 1
change Forida to Florida 26 9
delete t after event 26 22 change Earthquake, to Earthquake 27 16 change VECO to VEPCO 28 2
change Section IV to Section IV.B 29 8
insert (emphasis in original) after Id. at 34.
29 8-9 move fn 54 from line 9 to line 8 after the North Anna design 30 2
change Petitioners to Appellants Respectfully submitted,
__/signed electronically by/___
Diane Curran Harmon, Curran, Spielberg, & Eisenberg, L.L.P.
1725 DeSales Street N.W., Suite 500 Washington, D.C. 20036 240-393-9285 dcurran@harmoncurran.com April 28, 2021