COL Docs - FW: NRC Staff Talking Points on ITAAC 570 Discussion at 8-12-21 Public MeetingML21223A094 |
Person / Time |
---|
Site: |
Vogtle ![Southern Nuclear icon.png](/w/images/1/14/Southern_Nuclear_icon.png) |
---|
Issue date: |
08/11/2021 |
---|
From: |
NRC |
---|
To: |
|
---|
References |
---|
Download: ML21223A094 (3) |
|
|
---|
Category:E-Mail
MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) 2024-01-31
[Table view] |
Text
From: Santos, Cayetano Sent: Wednesday, August 11, 2021 9:21 AM To: Vogtle PEmails
Subject:
FW: NRC staff talking points on ITAAC 570 discussion at 8-12-21 public meeting From: Santos, Cayetano Sent: Wednesday, August 11, 2021 9:21 AM To: Kelli Roberts (KROBERTS@southernco.com) <KROBERTS@southernco.com>; Agee, Stephanie Y.
<syagee@southernco.com>
Cc: Welch, Christopher <Christopher.Welch@nrc.gov>; McKenna, Philip <Philip.McKenna@nrc.gov>;
Gleaves, Billy <Bill.Gleaves@nrc.gov>; James Gaslevic (James.Gaslevic@nrc.gov)
<James.Gaslevic@nrc.gov>
Subject:
NRC staff talking points on ITAAC 570 discussion at 8-12-21 public meeting Kelli/Stephanie, Below are NRC staff talking points for the ITAAC 570 discussion topic during the 8/12/21 public meeting.
Tanny Proposed Questions The ICN for Vogtle 3 ITAAC 570 (dated May 20, 2020) states, in part:
The Quality Release and Certificate of Conformance (Reference 1) verifies the cable assembly acceptance test results. The Field Service Report (Reference 2) verifies the as-built cable assemblies were installed in accordance with design drawings and installation specifications issued for construction, and work package requirements.
The as-built Class 1E head area cable assemblies were inspected to verify that the design specification and installation specifications are satisfied, to enable each cable to convey the safety-related core exit thermocouple signals to the PMS, as identified in the Combined License (COL) Appendix C ITAAC 2.5.05.03b, Design Description.
The inspections were performed and documented in accordance with manufacturer and vendor quality verification programs. The results of the inspections are documented in the Unit 3 Principal Closure Documents (References 1 and 2) supporting the ITAAC
2.5.05.03b Completion Package (Reference 3). The inspections confirm that each of the as-built Class 1E cable assemblies between the In-core Thermocouple elements and the connector boxes on the integrated head package have sheaths.
As revealed during the June 24 and July 8, 2021 public meetings, the incore instrument thimble assemblies (IITAs) have not been installed and the licensee would not plan to install them until fuel load for the reasons discussed during the public meetings.
The NRC has the following questions regarding the process that occurred during development and submission of the ICN for ITAAC 570.
- 1. Please discuss the Quality Release and Certificate of Conformance (Reference 1) and the Field Service Report (Reference 2) that are referenced in the ICN. Specifically, please identify:
- a. the scope of work covered by each reference as it relates to ITAAC 570
- b. the references role in completion of the ITAAC
- c. the specific cables covered in each reference that relate to ITAAC 570
- 2. Reference 2 indicates that the IITAs had not been installed; please answer the following questions:
- a. What was the basis for the ICN statements (quoted above) regarding the licensee performing an inspection that verified that the as-built cable assemblies were installed in accordance with installation specifications, design drawings, design specifications, and work package requirements?
- b. What was the basis for the ICN not indicating that the IITAs had not been installed?
- c. For this ICN, what process did the licensee use to ensure that the ICN was consistent with the underlying references? Is this the same process used for other ICNs?
- 3. The NRC understands that the ICN for ITAAC 570 relies on tests and inspections performed at other than the final location. Why did the ICN for ITAAC 570 not address the associated NEI 08-01 guidance in a manner similar to other ICNs (e.g.,
ML20115E455)?
- 4. What document verified the 38 CL-1E thermocouple cables within the in-core instrument thimble assemblies (IITAs) are encased in a protective sheath and demonstrated the acceptability of the sheath.
- 5. Reference 2 routes the in-core instrument (ICI) cables to the connector rack on the IHP cable bridge. Where are the connector boxes located at which point the CL 1E cables become separated from the non-Cl 1E cables?
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 618 Mail Envelope Properties (MN2PR09MB524433D65FCF16D9F5B53D70E5F89)
Subject:
FW: NRC staff talking points on ITAAC 570 discussion at 8-12-21 public meeting Sent Date: 8/11/2021 9:21:19 AM Received Date: 8/11/2021 9:21:23 AM From: Santos, Cayetano Created By: Cayetano.Santos@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>
Tracking Status: None Post Office: MN2PR09MB5244.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4070 8/11/2021 9:21:23 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: