|
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23129A4802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4492023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, Revision N16, Sheet 3, Elementary Diagram Feedwater Control System ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4522023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4003, Overall Site and Vicinity Plan, Withheld ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard MSIVs ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4712023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E719BC, Sheet 1, Process Diagram Reactor Core Isolation Coolant System ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 ML23129A4652023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 4 ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 ML23129A4622023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing SAA085, Sheet 4, 20 X 5 MSIV Actuator ML23129A4642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E149BB, Sheet 1, Functional Control Diagram Nuclear Boiler ML23129A4582023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Sheet 1, Neutron Monitoring System Arrangement General Plant Document ML23129A4602023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 3, Functional Control Diagram Residual Heat Removal System ML23129A4552023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E720BB, Process Diagram High Pressure Coolant Injection System ML23129A4572023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Installation Details - Temperature Detectors for Nuclear Boiler System Leak Detection, Sheet 107E ML23129A4532023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4260, Sheet 2A, Containment Suppression Chamber Penetration Location ML23129A4482023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Sheet 1, Functional Control Diagram Reactor Core Isolation Cooling System NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4542023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E989, Power Range Monitoring Unit, Sheet 1 ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4772023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4612023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing NC29546, Transmission Line Routes ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23129A4512023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E174BB, Sheet 1, ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 2023-04-20
[Table view] Category:Drawing
MONTHYEARML23129A4772023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4472023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 80E1143, Revision N01, Fuel Storage Rack ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 ML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A4802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4492023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, Revision N16, Sheet 3, Elementary Diagram Feedwater Control System ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard MSIVs ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4722023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Recirculation Flow Control System, Sheet 1 ML23129A4642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E149BB, Sheet 1, Functional Control Diagram Nuclear Boiler ML23129A4662023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E197BB, Rev. 7, Sheet 6b, Reactor Recirculation Controller Configuration ML23129A4612023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing NC29546, Transmission Line Routes ML23129A4632023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 920D225BB, Revision N03, Standby Liquid Control System Functional Control Diagram, Sheet 1 ML23129A4572023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Installation Details - Temperature Detectors for Nuclear Boiler System Leak Detection, Sheet 107E ML23129A4592023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E923, Incore Startup Chamber Retract Mechanism (Field Installation) ML23129A4542023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E989, Power Range Monitoring Unit, Sheet 1 ML23129A4562023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E415BB, Nuclear Boiler, Sheet 1 ML23129A4512023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E174BB, Sheet 1, ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 ML23129A4522023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4003, Overall Site and Vicinity Plan, Withheld ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A4482023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Sheet 1, Functional Control Diagram Reactor Core Isolation Cooling System ML23129A4532023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4260, Sheet 2A, Containment Suppression Chamber Penetration Location ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A4602023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 3, Functional Control Diagram Residual Heat Removal System ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 2023-04-20
[Table view] |
Text
1 2 3 4 5 6 7 8
- ...______j____ _ _ _ _ _ _ _ j _ _ _ _ _L _ _ __ _- - - - - ' - - - - - - - - - - - - ' - - - - - - - - - - - - ' - - - -
9 10 11 12 7 A A F-7 F-5 I)-? l)-4 0-13 [)-10 3"
3" 3" ..1
G-/..1-12 E:-14 D-13 D-,. D-8 F-M- G -lf-14 £1.. 903' . .,"
- - - - --*-*--*""-***~*-~ - - - - ----- - + - - - - - - - - - - - - - - ---**----*-,---,--...,...--,--------+-- -----------+-- -~--------+~-.---,,----,--
SAMPLE, RAC.I<
SR-IA
- - - - - -------~-----y-I ' ;
~fi I B G -10 G- 1 EQUIP -r;;i,j/JV F- 7 G-7
"' ~_,_ , " B
.---,---j---,----,- ,-~-~-~----+------- H-? 1/-10 [}-13 P-11 D-7 C,-I4 l (;/-15 )l-13 E:L 882-(._
FLOOR z"
IWlhN v DH,'/JN
' 3" v 01'/ll/N 3' 3" ?," 3" 3" "31, 01 3" 3 '-'
SI/MP IS $UMP/R -3 FOR-2 SUMP 161 3-'FOPI-Z 4"FDfj-2. 1-RW-<SI--'\ 4"FPR-2 _j3"FDR-2 4-'FDR-2 1-RW-Z.i~-J, l 1-11w-~'i'3-3 TURBIN£ ,8U/LD!Nfi; ROOF flOOF RCO" Ct:;R.RJD~ . ~ ; = '
1)1/8/N DR/;IN C>'f/1/N 0~-,.1//.IS
- - - - ~ ~ ~ """'- - - - - - - - - , - - - - - - ~ r - -EL-952'C ,-----
,{'
" 4' 4"RO-Z 4" 4" C -:--i METALS LAB NKS - RM 8308
~ - - - CORRIDOR DRAINS 13)
C HOOD ISLAND HOT covE:R.L REHO'rAiLE 1 1/2" PVC OV'ER.FLOW POTABLE.
I FLOD/l, -01?-AllJ -lYP. Felt RESIN HaTWTR- APP-ITION RC>C>F EX\-1 H(V SToRAGE TANK DRAIN FROM CORRIDOR, ORAll,.J EL 934'-0 11 FAl'l~ Af\EA NOTE 5 j FLOC .SYS DRAIN El. '334!.Q" NON-RAD AC-RW-1A L L2*~ _J J:--4'--_;,CONDENSATE n DWG. CNS-HV-7.3 3* :3" 4" 1.
2" 3" ii" 3" 3" ROO~ 4 4FDR.-2 OQAIJJ qoo,:
l 'R.W ~315 ,3 3 CONDENSATE DRAIN FROM HV- RW-1 D. 5Ef:. DWG. 2019, RADWASTE BLDG, SAMPLING RACK 1-E SINKS SH. I ZONE: H-7 1-RW-249-4" (OFFICE AR'i.'A)
EL, 9JJ2 < (;." (B) (A) (C) (D) 3" CONDENSATE DRAIN FROM HV-RW-1 G 1" ~ - - - - - - - - - , ' DWG 2019, SH 1, ZONE H-7 D SA/r/PL[ RM_
LAB SJNX. /Ya " CONDENSATE DRAIN FROM HV-RW-1 F D
____,/~'2 11 PW-2 P'ti-2 ~---< DWG 2019, SH 1, ZONE H-7 CUP SINK HOOD SINK CLEAN LAB J'kPW-2 RM 8210 SINK
/1/2 11 FS-4 11/," MW-25 __,
z CONDENSATE F/D CELLS (6) :::J - __, __, __,
1" MW-25 a w u a--w o__, o__,
1J; OU 0--'
o..W 0--'
o..W z n
__, u __, u 0
u c5 ~ COUNTING CORRlDOR w:i f--
(/)::, "'"'
ow 0 >::; WO WO ~ ~
<(
<(
Cl tZOOM CORRIDOR DRAIN.5(2) Df.\<.IN 2"MW-25(a) <CW
,:co ~c: 2~ 2~ l ~!£ EL 9/8CO"
..---,----,--,-----. - ~ - - - - ~ - - - - - - - - - - - - = + - -<'-I - - l - - - ~ +'"- - - - - - - - - -----~
TO CHEM_ WASTE TANK DWG 2032 SH 1, ZONE A-1 3" 2' 2' 2' 2*
E 3 3 1' !," 3" 3" 3" 3 ,, a" E
..' II 3* 3' 3" 3 L _ __,1'-_ _,r,-_ _,r,-_--1c___ __J'.____ __._ _ _ _ -'t'--*----'L--.,,,-,.-,-ccr,...___L__ _J__ __:3 "FDR-Z 1-!i:W~;t:1 o
~
~~
'-----'--'Q--.L____ --'4L."- FDR-2 - RW-:**--,i-_____ ----\c-1c-
~------~--~--~-------------------,_-,,-,_-,-0-.-.,~-
II'
'll'.J 3
- - - - - - - "FOR-2. ---- i ~
- WELDED F'IPE. CA.T' 3"FDR-2 TO FLOOR DRAIN COLLECTOR TK. TO LAB DRAIN 3"FDR-Z DWG 2032 SH 2, ZONE D-1 <\i TANKS, DWG DWG 2049 ' 2032 SH 2 ZONE C-5 TO WASTE COLLECTOR TANK ~ ,t-,
DWG 2033 SH 2, ZONE D-8 "-. ,!_ ZONE E-8 1-RW-308-3" 3"FDR-2 'i- ,~
I 1-RW-323-3" 3"FDR-2 4"
'5 DWG 2032 SH 5 ..----,
3/*V253X(385) * *' DECON 51 liK et::
<(
et::(/}
et::(/}
ZONE G-5 3/4'\1253X(386)
SV-5 SSV-5)
"'0 _J 0 "'0 I'=::,
Cl
-z 0
-z 6~ "'-
Fl/___ .{._ .STA,
~<: ~O: ~z
-< a::~ 2"PW-1 3/4"CH-3 DRAINS zo "'-
I 1--
uo w =>o y
w<: oa--
" ' <(
1J,.,..r:~=- '-----1 MIXER 00 C0/2.,Q,,!DoP. oa--
" ' <( LAUNDRY wo £ "'o ~ ~ 1" uo ua-- uo
-Y--Y'{1 LL <Ca,"'< "'of-(/) L..I "-o L..I CON'l£YOR.. D{-(.Af\/S ( 3.,* r- .D.C:Al,.;s AREA EL
~-~-~~-~-~~-~-..--~-..--~-~~-- FILL "':,:1 R~S WASH 1 - ~ ~ - ~ - - - - - ~ \
STATION TANK RMS -- 7 i ff 3" DEC.ON PIT F
t' F SUMP U I
~Iv F
":f'MVl*7.S t Q
]3" ,-*
- L I
- ,-* 3' 3" 3 3" ;,t_ ASPV 6" ';' ,--~c ' 3' 3" "--<J---~~-~---~,
3" 3" 3" 3" 3" 3'
<c_j_;---~--------- --- ----
3' 3 3*
) 840 4 .. ~ AO
- --- ;,," rOR -------=--' - _
4" o I~A£0-l-~t,';;;;-,,-; "- 842 -*-- _,, __ , 3' FDF.-2 3"FDR-2.. J:fc-t- "840AV 840 923F "1,-,J_;------=3_1/P?:->B._-Z_______ - - - - - - - - - - - "-~-- ----- - ~
- - - - - - - - - - - - - - - - - - - - - - - - - - " - - = - = " ' -3"MW-2S 1-RW-303-3" 0 ,, FDP.'2 __,// -----'-=-- ==--=-----_J "I 1-RW-305-3" Cl 1-RW-323-4" 3"MW-2S CONT_ ON 3" FDR-2 DWG 2032 SH 1
' 4"841 AV523F
"' 841 4" ZONE C-1 1>
4"FDR-2 1-RW-311-4" 3"FDR-1 1-RW-317-3" 3"FDR-1 CONT_ ON DWG 2032 8" I
,---i-L--1 2'V253X-18 2"FDR-1 2'V253X-19
~
~
<( Cl 0"' "-
TO WASTE SLUDGE TANK
- ~ 2_r"F~D~R~-~1-CJr-----r3~"F~D~R~-~1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _1_-_R_W_-_3_0_2_-_3_"_ _ _ _ _ _ _ _ _ TO_F_L_o_oR_D_R_A_IN_c_o_L_LE_C_T_IO_N_TA_N_K_ _3_"_FD_R_-_1_ _ ___, SH 2, ZONE D-1 Ul I- ~ DWG 2032 SH 4 e~~ i 2'V253X-16 2'V253X-17 G '--. 'TO 37<:JRµf
"'4'V523F-184 OVERFLOW FROM G
~.!:ri- ER
~ I ~ I 2'V353X-30 ZONE C-6 12'V353X-32 LAUNDRY DRAIN SYSTEM y ______(2:~-C1/ '----~--;"
FLOOR 2'V353X-29 I 2'V353X-31 DWG 2032 SH3, ZONE E-2 AND i i i--
l FOR CONT. .SEE.
tJWG.
~:~~JOR '-(~~~V) _/\ L __ J (30-CV)
'-*-----*-----' '----.+7 (31-CV) 2"FDR-1 2032 SH1, ZONES C-5 & C-7 i
TO WASHDOWN~T-A-NK-~SEE NOTE 3 FROM TURBIDIMETER ' ' 3" 3' PUMP DRAIN L______\wii<h ~ DWG 2079 SH 1 "I
OVERFLOW N t-----1 N !
WASTE OVER- WASTE & FROM FLOOR ZONE F-4
- r -
0 "-
-T----~~---------~------
FLOW FROM FLOOR DRAIN CHEM. CHEM. "- ' ,--+.,iai,,I wAsr,; ::, FROM FLOOR
~ Fi'I<>!./ l-'X>R COLLECTOR DRAIN COLLECTOR WASTE TK. WASTE TK_ CO/Jt.-, P;/ASE !,LUI><,[. n,; WASri! 6Pcl-lT BACKWASH & t--,-JX ;.-, l?IM/1-1 5A41P,E DRAIN SAMPLE BA6E,/.olei-/l' TANK TK_ CELL TANK NOTE:
OVERFLOW CELL S£f.' CELL OVfllF/.OW .sUJ{)t;E CUL RE5/IJCEU TRANS, TK. CELL n,........,, P(/MI-) TK. OVERFLOW C ~A.IIJ Dlc'Arf..l EL. 877'-6"
--~-~--~---,--~--,--~~-,--~-7--~-;---;-
_,__3/,_1_13-27-5?-x-~4--,--*----~~4~.-_- - - 1. UNLESS OTHERWISE SPECIFIED ALL PIPE SHALL BE FDR-2 V-,H-- 3/4°V253X V
~-4-_,,_ 4~.
!' ,;, l 4-" (235) 2. ALL VALVE NUMBERS IN PARENTHESIS ( ) ARE NUMBERS r,," !,"
,t" TO BE USED IN OPERATING PROCEDURES_ THESE NUMBERS 6"FDR-2 1-RW-312-6" PI 1-RW-301-6" "Fo,.:-; 4" ,/"!'o,tt-2 ARE ASSIGNED BY NPPD AND WILL NOT APPEAR ON PIPING 7~ 1 1H-2 f--'--=~~-r'---~-----~-----~ DRAWINGS_
1K-2 4" 1H-1 1-RW-314-6" SHIELDED FLOOR DRAIN SUMP 1 K & PUMPS UNSHIELDED FLOOR DRAIN SUMP 1H & PUMPS
(ro"FO~*Z 3. ,6_ WHERE SHOWN WITH NUMBERS REPRESENT POINTS OF CONNECTION TO EXISTING SYSTEMS_ E73-58 SPECIFICATION DEFINES WORK FROM THIS POINT.
H 4. WHERE LINES INTERCONNECT AND ARE CONTINUED ON OTHER H DRAWINGS, ZONE NUMBERS ARE APPROXIMATE ONLY.
- 5. FLOOR DRAIN SEALED WITH GROUT PER CED 6014761.
6_ EQUIPMENT ABANDONED IN PLACE.
I EL 903'-!,-'-> _._
~ S E E NOTE 6 AS BUILT I
rn 2" 2 Z" T1 REVISIONS TO THIS DRAWING 454003605 J
3" REQUIRES A REVISION TO THE
-'-,---'-=--+-'---------
I-~w-J1'i1-3 3" ___ _;_
~ CONT_ ON DWG 2032 SH 1, ZONE B-9 CORRESPONDING ISOKEY. STATUS: Release STATUS DATE: 06/10/2020 DS APPROVED: JDMADDO VER: AD REV: 17 SIZE: F j SIGNIFICANT NUIIIBER DRAWN DATE j
HOT TOOL STORAGE ROOM MASk tlE.CON £OOH HFY 5/13/02 GROUP 4
(Co;..17RoLLEO co~P(iOOR,) r--
BURNS & ROE CHEO<ED DATE VERSIONS/REVISIONS BY NPPD COOPER NUCLEAR STATION RADWASTE BUILDING NO.
AD 17 DR-2020-0021 DESCRIPTION ORDER DFT DATE 20-001 DLR 6 10 20 JDMADD ENG FLOW DIAGRAM APPROVED SEE~
DATE -
R 0
0 TURB. & RADWASTE BLDG. CONTAMINATED t - - - , - - - ~ - - - - - - - - - 7 ~u C 2017 FILMED 1--t--------+--+-+--+---1 FL. DRAIN & RADWASTE ROOF DRAIN SYS. ~
1 2 3 4 5 6 7 8 9 10 11 12