MONTHYEARML20281A3262020-09-0303 September 2020, 4 November 2020 Pre-Submittal Meeting on October 14, 2020 - Hatch MSIV Project stage: Request PMNS20201367, Pre-Submittal Meeting Regarding Snc'S Proposed LAR to Revise the Allowable Values (Avs) for Surveillance Requirements (Srs) Related to Technical Specification (TS) 3.3.5, Loss of Power (LOP) Instrumentation, at Vogtle, Units 1 and 22020-12-11011 December 2020 Pre-Submittal Meeting Regarding Snc'S Proposed LAR to Revise the Allowable Values (Avs) for Surveillance Requirements (Srs) Related to Technical Specification (TS) 3.3.5, Loss of Power (LOP) Instrumentation, at Vogtle, Units 1 and 2 Project stage: Meeting ML21011A0532021-01-19019 January 2021 Pre-Submittal Meeting to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values Project stage: Meeting ML21019A5832021-01-29029 January 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Allowable Values for Surveillance Requirements Related to Technical Specification 3.3.5.2, Project stage: Meeting 2020-09-03
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23304A2682023-11-0707 November 2023 License Amendment Request to Revise the Ultimate Heat Sink Mission Time Pre Submittal Meeting on November 7, 2023 ML23311A2452023-11-0707 November 2023 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) ML23293A0052023-10-20020 October 2023 Lessons Learned from the ITAAC Hearing Process for Vogtle 3 and 4 ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23072A1802023-03-13013 March 2023 2023 RIC Powerpoint Slide Presentation, Vogtle 3: Journey from Construction to Operations ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22335A5542022-12-0101 December 2022 Slides - SNC Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request - ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22144A0502022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22144A0492022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22126A0012022-05-0606 May 2022 SNC Slides - Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemptions ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final ML22060A0062022-02-28028 February 2022 4Q 2021 Performance Summary U3 ML22021B6472022-01-27027 January 2022 Pre-Submittal for Westinghouse Increased Enrichment Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LRM-0003) (Slides) ML22026A0582022-01-26026 January 2022 Dashboard Report 1-26-2022 ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21333A2172021-11-29029 November 2021 Readiness Group Presentation During 12-2-21 Public Meeting ML21230A2842021-08-18018 August 2021 SNC Slides - Vogtle MSIV Elimination LAR - Pre-submittal Meeting Part 2 - 08-25-2021 ML21197A0032021-08-0606 August 2021 Slides - SNC Slides - Pre-Submittal Meeting on August 13, 2021 - Vogtle TS 3.3.1 and 3.3.2 LAR ML21193A0762021-07-0808 July 2021 ITAAC Related to Incore Instrument Thimble Assembly (Iita) ML21187A0972021-07-0808 July 2021 Late Filed Allegations (Lfa) Process ML21188A3612021-07-0606 July 2021 1Q 2021 Performance Summary U4 ML21188A3592021-07-0606 July 2021 1Q 2021 Performance Summary U3 ML21188A3622021-07-0606 July 2021 Archives ML21193A0772021-06-24024 June 2021 Exemption from Operator Written Examination and Operating Test for Unit 4 Licenses, 6-24-21 Pre-submittal Meeting ML21124A2522021-05-31031 May 2021 Request for Alternative to ASME Section XI and Section III Requirements for Repair of Reactor Vessel Head Penetrations - NRC Pre-submittal Meeting May 10, 2021 (EPID L-2021-LRM-0047) (Slides) ML21085A4902021-05-19019 May 2021 Risk-informed Resolution of Generic Letter 2004-02 ML21113A2272021-04-23023 April 2021 Readiness Group Public Meeting Presentation Slides - April 28, 2021 2024-01-08
[Table view] |
Text
Vogtle Pre-Submittal Meeting to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values January 19, 2021
Meeting Purpose and Agenda
- The purpose for this meeting is to discuss proposed amendment request to revise Technical Specification Loss of Power Surveillance Requirement 3.3.5.2 Allowable Values from analytical limits to allowable values
- This meeting will cover the following topics:
- Background on Loss of Power Function
- Proposed License Amendment Request 2
Background on Loss of Power Function
=
Background===
- 4 Diesel Generator Start Circuits
- Two modes that initiate the DG start logic are:
- Technical Specification (TS) requirements are 4 channels of loss of voltage and degraded voltage Function Operable per safety related 4.16 kV bus.
- Channels are Operable when the trip setpoints meet their required values and delay times and are conservative to their allowable value.
4
Applicable Safety Analysis Discussion
- Accident analyses credit the loading of the DGs based on a loss of offsite power during a LOCA
- The DG loading time is included in the delay time of each safety system component following a loss of offsite power
- The trip setpoint for the loss of voltage and the degraded voltage Functions are derived from the analytical limits for these Functions presented in Chapter 15 of the Final Safety Analysis Report 5
Setpoint Analysis
- ISA 67.04 1994 established a method (Method 3) to calculate an Allowable Value.
- To calculate an Allowable Value using Method 3
- The Nominal Trip Setpoint is determined from the Analytical Limit in UFSAR Chapter 15. The Nominal Trip Setpoint separation from the Analytical Limit is based on a combination of all errors.
- The Allowable Value is then determined from the Nominal Trip Setpoint and is based on errors present during calibration.
- This relationship is shown graphically on the next slide 6
Setpoint Analysis Setpoint relationships of nuclear safety related setpoints from Regulatory Guide 1.105, revision 3 and ISA 67.04 - 1994 7
Proposed License Amendment Request
Proposed License Amendment Request
- The Allowable Value contained in the current Technical Specification is the analytical limit from FSAR Chapter 15.
- Using Analytical Limits as Allowable Values conflicts with the Standard Technical Specifications and creates the possibility that the trip setpoints will be insufficient to perform their required trip function
- SNC proposes to change the Technical Specification to replace the Analytical Limit with the appropriate Allowable Value 9
Technical Specification Surveillance Requirement 3.3.5.2 Current SR 3.3.5.2
- Loss of voltage Allowable Value > 2912 V with a time delay of < 0.8 second
- Loss of voltage Nominal Trip Setpoint 2975 V with a time delay of < 0.8 second
- Degraded voltage Allowable Value > 3683 V with a time delay of < 20 seconds
- Degraded voltage Nominal Trip Setpoint 3746 with a time delay of < 20 seconds Proposed SR 3.3.5.2
- Loss of voltage Allowable Value > 2958.2 V with a time delay of < 0.8 second.
- Loss of voltage Nominal Trip Setpoint 2975 V with a time delay of < 0.8 second
- Degraded voltage Allowable Value > 3729.2 V with a time delay of < 20 seconds
- Degraded voltage Nominal Trip Setpoint 3746 with a time delay of < 20 seconds 10
Calculation of Allowable Value
- TS AV for Loss of Voltage > [Nominal Trip Setpoint - (RCA X span voltagepri)]
> [2975 VAC - (0.0032 x 5250 VAC)]
> 2958.2 VAC
- TS AV for Degraded Voltage > [Nominal Trip Setpoint - (RCA X span voltagepri)]
> [3746 VAC - (0.0032 x 5250 VAC)]
> 3729.2 VAC RCA = Rack Calibration Accuracy Nominal Trip Setpoint is from Technical Specification Surveillance Requirement 3.3.5.2 and is not changed by this request 11