MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
December 8, 2020 Mr. James M. Welsch Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON NUCLEAR POWER PLANT, UNIT 2 - REVIEW OF THE FALL 2019 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT (EPID L-2020-LRO-0026)
Dear Mr. Welsch:
By letter dated May 13, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20134J139), as supplemented by letter dated October 16, 2020 (ADAMS Accession No. ML20290A929), Pacific Gas and Electric Company (the licensee),
submitted information summarizing the results of its fall 2019 steam generator (SG) tube inservice inspections performed at Diablo Canyon Nuclear Power Plant, Unit 2. These inspections were performed during refueling outage 21. The SG tube inspection report was submitted in accordance with Technical Specification 5.6.10, Steam Generator (SG) Tube Inspection Report.
Based on its review, the U.S. Nuclear Regulatory Commission (NRC) staff concludes that the licensee has provided the information required by Technical Specification 5.6.10, and that no followup is required at this time. A summary of the NRC staff's review is enclosed.
J. Welsch If you have any questions, please contact me at 301-415-3168 or via e-mail at Samson.Lee@nrc.gov.
Sincerely,
/RA/
Samson S. Lee, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-323
Enclosure:
Review of the Steam Generator Tube Inspection Report cc: Listserv
REVIEW OF THE FALL 2019 REFUELING OUTAGE 21 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NCULEAR POWER PLANT, UNIT 2 DOCKET NO. 50-323 By letter dated May 13, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20134J139), as supplemented by letter dated October 16, 2020 (ADAMS Accession No. ML20290A929), Pacific Gas and Electric Company (the licensee),
submitted information summarizing the results of its fall 2019 steam generator (SG) tube inservice inspections performed at Diablo Canyon Nuclear Power Plant (Diablo Canyon), Unit 2.
These inspections were performed during refueling outage 21.
Diablo Canyon, Unit 2 has four Westinghouse Model D54 SGs, each of which contains 4,444 thermally-treated Alloy 690 tubes. Each tube has a nominal outside diameter of 0.750 inches and nominal thickness of 0.043 inch, except for Row 1 and Row 2, which have a nominal thickness of 0.044 inch. During SG fabrication, the tubes were hydraulically expanded over the full depth of the tubesheet. The ends of each tube were tack-expanded using a urethane plug expansion process prior to making an autogenous seal weld on the primary side of the tubesheet. The tubes are arranged on a triangular pitch with 1.144-inch spacing. The tubes in Rows 1 through 16 received full-length thermal stress relief following bending. Eight Type 405 stainless steel support plates, which have broached trefoil-shaped holes, support the vertical section of the tubes. In the U-bend section, the tubes are supported by three sets of "V" shaped, rectangular stainless steel Type 405 anti-vibration bars.
The licensee provided the scope, extent, methods, and results of its SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) if any were taken in response to the inspection findings. The licensee also stated its intention to request a license amendment to allow operation of the SGs until plant retirement at the end of cycle 25 without additional tube inspections (four operating cycles). The plant technical specifications currently limit the plant to no more than three operating cycles between inspections. To support these plans, the licensee performed its forward-looking operational assessment for four operating cycles.
Based on the review of the information provided, the U.S. Nuclear Regulatory Commission (NRC) staff has the following observations:
The licensees October 16, 2020, letter responded to NRC staff questions about assessment of foreign objects and a secondary-side inspection during the remaining refueling outages. Foreign objects have been found in the Diablo Canyon, Unit 2 SGs, but no degradation has been detected. The response described the results of foreign object search and retrieval operations, and some of the inputs and assumptions used to perform the operational assessment in order to meet the tube integrity requirements in the technical specification. Based on its assessment, the licensee concluded no additional secondary-side inspections are required before plant retirement at the end of cycle 25.
With respect to the licensees plans to request a change to the SG inspection interval, the NRC staff will review the licensees technical justification at that time, including supporting documents such as the operational assessment described above.
Based on the review of the information provided, the NRC staff concludes that the licensee provided the information required by its technical specifications. In addition, the NRC staff concludes that there are no technical issues that warrant followup action currently, since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
ML20338A292 *via e-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DNRL/NCSG/BC*
NAME SLee PBlechman SBloom (PKlein for)
DATE 12/08/2020 12/08/2020 11/25/2020 OFFICE NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME JDixon-Herrity SLee DATE 12/08/2020 12/08/2020