ML20247C488

From kanterella
Jump to navigation Jump to search
Partially Withheld Rept of Activities W/Snm at Santa Susana Hot Lab Under License SNM-21.Physical Security of Matl Provided Per ESG-80-17, Physical Security Plan for Protection.... Necessary Rev to Plan Made
ML20247C488
Person / Time
Site: 07000025
Issue date: 06/30/1983
From: Remley M
ROCKWELL INTERNATIONAL CORP.
To: Brown W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19325C150 List:
References
FOIA-89-193 83ESG-4097, NUDOCS 8907240357
Download: ML20247C488 (2)


Text

-

f g

34 4

Q F

Q[

Sy i4 Energy Systems Group Rockwell lnter nationa! Corporation ROCkWell 8930 De Soto Avenue ca,oga Park, Cauornia 91304 InternaMOnal h

Telephone: (213) 700 8200 Telex: 181017 June 30, 1983 In reply refer to 83ESG-4097 Dr..Willard B. Brown, Chief Fuel Facility Safeguards Licensing Branch Division of Safeguards U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Dr. Brown:

Subject:

Physical Security of Special Nuclear Materials, Docket 70-25 The Energy ' Systems Group is currently conducting activities with special nuclear materials at the Hot Laboratory at Santa Susana under Special Nuclear Material License No.. SNM-21 with physical security of the material provided as described in ESG-80-17,

" Physical Security Plan for the Protection of Moderate Strategic Quantities of Special Nuclear Material at the Hot Laboratories of the Energy Systems Group of Rockwell International."

During the recent decladding of the SEFOR fuel, it has become necessary to. increase the Health Phygjrs. support capability for i

those activities.

This required ther I

N6 i

These changes in the facility result in changes in the security plan which are described on revised paaes 6 and 7 of ESG-80-17. The revisic<n on page 6 is indicated by a vertical black bar on the right-hand g.ks / 'g < L "

l

[A,/(["9

[ [ (f

' nformation in this record was deleted a accordance with the Freedom of Inictmation

} set, exemptions __

'f(/

0ggd g'

Om.

52-4 2 MR["$?ff 8'

  • POR 2

Rockwell 83ESG-4097 International June 30, 1983 Page 2 1

I I

margin, while the revision of Figure 1.4 on page 7 shows the location of the recently installed door C-53.

Ten copies of the two revised i

pages are enclosed for your information.

l Since' the revisions to the security plan described here do not include changes which result in a decrease in the effectiveness.of our special nuclear material security plan, we are reporting them in this letter and in the revised pages, as required in Section 70.32(e) of 10 CFR 70.

o I should also point out that the information included here is of a type specified in 10 CFR 2.790(d) and, therefore, pursuant to Section 2.790(d)(1), such information is deemed to be commercial or financial i

1 information within the meaning of 10 CFR 9.5(a)(4) and should be withheld from disclosure.

Sincerel

!).

~

M. E. Remley, Dire or Health, Safety & Radiation Services cgb

Enclosure:

. Ten copies of revised pages to ESG-80-17 cc w/ enclosure:

Mr. LeRoy Norderhaug, Region V Office, U.S. Nuclear Regulatory Commission

_ - _ - - - - _ _.