.:- QUESTION 14 Why hasn't the NRC required Edison to complete the facility that is necessary to effectively implement emergency planning-and evacuation procedures (the Emergency Operations Center)?

ANSWER The Emergency Operations Facility (EOF) for-the San Onofre site is complete in all respects.

l 1

1 8907110231 890616 M

PDR COMMS NRCC i

l-CORRESPONDENCE PDC l

w,-

mumum y

.@c w.

O'.

c..

.s-

' JIM SATES 4..

c,,m, r....

u,u.,,n go

'1.

u.r. ceuumee

. i s.... nm.

....... o, m.

enenn.;,

...a...

..,e..m.. w

......e<.

, 7.......

"'*"'.',."ht et"

'tiouse of $cpresentattura

~

-.,oEC.',.~+

.... v...o"l*07. o,.

,vd,

May.11, 1989.

a 4..r....e.-

Lando W.

Zech, Jr.

Chairman Nuclear Regulatory Commission l1717 H' Street, NW Washington, D.C.

20555 o.c

.8 Daar Chairman Zech:

y...

m a 3.-

.the subcommittee on Energy and Power.Thank you for responding g

j,g.,

-written response to the following questions:I would appreciate your

' $.e.

e.

- 1.

E (Maddam Neck, CN)Why was the connecticut Yankee (Northeast Utilities)

'" J thermal heat shield in late 1987 required by the NRC to make repairs to its reactor E" %

E'* di 5. Calif. Edison to restart San Onofre 1 witho s

  • y g-repairs to be made?.

j ee'.8 g u 8 o 2. NRC staff has raised ~e number of other issues and problems

.g.E " w related to San Onofra 1 that they want settled before allowing s '" J " Edison to restart the reactor.

  • 8 g concerns; and will NRC make the. list availableSpecifically, what are those o": < 3., o 8.; $ 5 3. When exactly is NRC proposing to allow Edison to restart the a w San Onofre,.17 4.

3 < y long will the repairs take.How much will repairs to the thermal heat shield cos and how y 3 $the shareholders pay part of the cost?Will ratepayers pay the bill or will 5.

thermal heat shield, how specifically and how frequen Edinon perform monitoring of the problem during the time the plant is allowed to operate?

Edison has said there is no safety 6.

shield came lose and fell, because a " problem even if the heat it would fall only 11' inches.

shelf" would catch it, and ton steel cylinder fell 11 inches that other bolts, supports orIsn't the other material might cause blockage of coolant and possible cause uneven or inhibited cooling?

7. When was the most recent NRC " Systems Assessment of Licensee Performance" (SALPS) onofra I?

evaluation procedure conducted for San

8. What was the NRC's opinion of the assessment?

IDO---00H 60 N 2od 2 6 vv Z 79 g go

[

,3

_05/11/89'-

21:55% O '

-- --- - -- --.. c.-.: u-- --- ;7 ' ;

~R I

ap L. '

4.?

Chairman Lando Zech MayL11, 1989 y

page 2 San Onofre' Units 1, 2& 3

9. Why has not the NRC demanded that the modifications be.made and the deadline he met regarding the modifications required by the NRC as an urgency measure 10 yoars ago as a result of.the Three Mile Island accident?
10. Why hasn't Edison been required (under the.TMI Action Plan) to' complete the contrcl room design review or the safety Parameter Display System for San Onofre 1?

11.. San onofra 1 has also not been required to install pro i

instrumentation to detect inadequate reactor core cooling,per has NRC_ demanded that Edison complete testing and analysis for nor several safety-related valves and pipes associated with cooling.

~

Why?

12. How can it be assumed that this reactor can operate safely with a damaged thermal heat shield since Edison has not yet installed the proper equipment to facilitate monitoring of adequate reactor core cooling?
13. NRC has allowed Edison to escapa deadlines for San onofra's revisions in its accident prevention and response procedures plan. Why?
14. Why hasn't the NRC required Edison to complete the facility that is necessary to effectively implement emergency planning and evacuation procedures (the Emergency operations Center)?

I look forward to receiving your answers to each of the questions.

Sincerely,

/

J EM TES 3

Member of Congrese cc: Mayor Maureen o*Connor San Diego city council I