ML20246D024
| ML20246D024 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/11/1989 |
| From: | Zech L NRC COMMISSION (OCM) |
| To: | Bates J HOUSE OF REP. |
| Shared Package | |
| ML20246C933 | List: |
| References | |
| BATES-890511, CCS, NUDOCS 8907110217 | |
| Download: ML20246D024 (1) | |
Text
__-__- __ - _
I.
QUESTION 8 What was the NRC's op' inion of the assessment?
ANSWER l'
4s' l
The cover letter and summary section of the SALP Board Report, which are i
attar'1ed to the response to Question 7, contain the NRC's evaluation of the assess.aent.
In general, the NRC staff found the performance of the licensee to be acceptable and directed toward safe facility operation, although weaknesses were noted in several areas, including control of maintenance activities, compliance with maintenance procedures and instructions, in the performance of certain engineering and technical functions, and in implementing the quality assurance program. The summary section of the SALP Board Report also' includes the ratings for the last two SALP periods and the criteria upon which those ratings are based.
8907110217 890616 FDR COMMS NRCC CORRESPONDENCE PDC l
_J