' QUESTION 10 Why hasn't Edison been required (under the :TMI Action Plan)- to complete the control room ~ design review or the Safety Parameter 1

Display System for San Onofre 17

- ' ANSWER The Detailed Control. Room Design Review (DCRDR) has been completed by the

- licensee, and the NRC staff has recently been discussing with SCE improvements in the implementation schedule for modifications to correct human engineering deficiencies.

I SCE installed a Safety Parameter Display. System (SPDS) in 1981 but is reviewing four options for improving it in response to later NRC guidance. The licensee

. has. proposed a'date of June 1993 for completion of the SPDS upgrade activity.

The DCRDR and SPDS are two of the open items that are discussed in the answer I

t to Question 9.

4 i

I 4

8907110223 890616 I

PDR COMMS NRCC CORRESPONDENCE PDC L_____________