Proposed Tech Specs Revising Reactivity Control Sys & Removal of cycle-specific Parameter Limits
ML20245G565
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/22/1989
From:
Public Service Enterprise Group
To:
Shared Package
ML20245G563 List:
References
NUDOCS 8906290180
Download: ML20245G565 (55)


Text

- _ _ _ _ _ _ _

ENCLOSURE 3 PLANT HATCH - UNIT 1 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 REQUEST TO REVISE TECHNICAL SPECIFICATIONS REACTIVITY CONTROL SYSTEMS AND REMOVAL OF CYCLE-SPECIFIC PARAMETER LIMITS PAGE CHANGE INSTRUCTIONS Removed Paae Insert Paae iii iii x x xi --

1.0-7 1.0-7 ,

1.1-6 1.1-6 1.1-7 1.1-7 1.1-8 1.1-8 3.3-5 3.3-5 3.3-6 3.3-6 3.3-7 3.3-7 3.3-9 3.3-9 3.3-15 3.3-15 3.3-16 3.3-16 3.3-18 3.3-18 3.6-22 3.6-22 3.11-1 3.11-1 3.11-la --

3.11-2 3.11-2 3.11-2a --

3.11-3 3.11-3 3.11-4 3.11-4 3.11-4a --

Figure 3.11-1, --

Sheets i through 8 Figure 3.11-3 --

Figure 3.11-4 --

Figure 3.11-6 --

6-15d 6-15d e9062901so s90622 Page 1 of 1 gDR ADOCK0500g1

s Section' Section Page LIMITING CONDITIONS F0k_0PERATION SURVEILLANCE REQUIREMENTS 3.3. REACTIVITY CONTROL (CONT') 4.3. REACTIVITY CONTROL (CONT')

G. Limiting the Worth of a G. Limiting the Worth of a Control Rod Below 10% l Control Rod Below 10%

Rated Thermal Power Rated Thermal Power 3.3-5l H.- Shutdown Requirements 3.3-7 3.4. STANDBY LIQUID CONTROL SYSTEM 4.4. STANDBY LIQUID CONTROL SYSTEM 3.4-1 A. Normal System Availability A. Normal Operational Tests 3.4-1 B. Operating with Inoperable Components D. Surveillance with Inoperable 3.4-2 Components C. Sodium Pentaborate Solution C. Sodium Pentaborate Solution 3.4-2 D. Shut down Requirements 3.4-3 3.5. CORE AND CONTAINMENT COOLING 4.5.

SYSTEMS CORE AND CONTAINMENT COOLING 3.5-1 SYSTEMS A. Core Spray (CS) System A. Core Spray (CS) System 3.5-1 B.

Residual Heat Removal (RHR) B.

System (LPCI and Containment Residual Heat Removal (RHR) 3.5-2 Cooling Mode) System (LPCI and Containment Cooling Mode)

C. RHR Service Water System C. AHR Service Water System. 3.5-5 D. High Pressure Coolant Injection (HPCI) System D. High Pressure Coolant In- 3.5-6 jection (HPCI) System E. Reactor Core Isolation Cooling (RCIC) System

t. Reactor Core Isolation 3.5-7 Cooling (RCIC) System F. Automatic Depressurization F. Automatic Depressurization System (ADS) 3.5-9 System (ADS)

G. Minimum Core and Containment Cooling Systems Availability G. Surveillance of Core and 3.5-10 Containment Cooling Systems H. Maintenance of Filled Discherge H. Maintenance of Filled Pipes 3.5-10 Discharge Pipes

1. Minimum River Flow I. Minimum River Flow 3.5-11 J. Plant Service Water System J. Plant Service Water System 3.5-12 K. Engineered Safety Features Compartment Cooling K. Engineered Safety Features 3.5-13 Compartment Cooling HATCH - UNIl 1 iii Proposed 15/02590/006 -0 l

LIST OF FIGURES Fioure Title 1.1 -1 (Deleted)-

2.1 -1 Reactor Vessel Water levels 4.1-1 Graphical Aid for the Selection of an Adequate Interval Between Tests 4 . 2 -1 System Unavailability 3 . 4 -1 Sodium Pentaborate Solution Volume Versus Concentration Requirements 3.4-2 Sodium Pentaborate Solution Temperature Versus Concentration Requirements 3.6-1 ' Pressure versus Minimum Temperature for Pressure Tests Based on Surveillance Test Results 3.6-2 Pressure 'versus Minimum Temperature for Non-nuclear Heatup/Cooldown and Low-Power Physics Test 3.6-3 Pressure versus Minimum Temperature for Core Critical Operation other than Low-Power Physics Test (Includes 40*F Margin Required by 10 CFR 50 Appendix G) 3.6-4 Deleted 3.6-5 Power-Flow Operating Map with One Reactor Coolant System Recirculation loop in Operation l

3.15-1 Unrestricted Area Boundary 6.2.1-1 Offsite Organization

6. 2. 2 -1 Unit Organization HATCH - UNIT.1 x Proposed TS/0259q/006-157

MM. Minimum Critical Power Ratio (MCPR) - Minimum Critical Power Ratio 1 (MCPR) is the value of the critical power ratio associated with the

{

most limiting assembly in the reactor core. Critical Power Ratio (CPR) d is the ratio of that power in a fuel assembly, which is calculated to cause some point in the assembly to experience boiling transition, to the. actual assembly operation power.

NN. Trip System - A trip system means an arrangement of instrument channel trip signals and auxiliary equipment required to initiate action to accomplish a protective function. A trip system may require one or more instrument channel trip signals related to one or more plant parameters in order to initiate trip system action. Initiation of protective action may require the tripping of a single trip system or the coincident tripping of. two trip systems.

00. (Deleted)

PP. Core Operating Limits Report - The Core Operating Limits Report is the unit-specific document that provides core operating limits for the current operating reload cycle. These cycle-specific core operating limits shall be determined for each reload cycle in accordance with Specification 6.9.1.11. Plant operation within these operating limits is addressed in individual specifications.

0Q. Channel Calibration - A Channel Calibration is the adjustment, as necessary, of the channel output such that it responds with the necessary range and accuracy to known values of the parameter which the channel monitors. The Channel Calibration shall encompass the entire channel including the sensor and alarm and/or trip functions, and shall include the Channel Functional Test. The Channel Calibration may be performed by any series of sequential, overlapping or total channel steps'such -that the entire channel is calibrated.

RR. Channel Functional Test - A Channel Functional Test shall be:

a. Analog channels - the injection of a simulated signal into the channel as close to the primary sensor as practicable to verify operability including alarm and/or trip functions.
b. Bistable Channels - the injection of a simulated signal into the channel sensor to verify operability including alarm and/or trip functions.

SS. Fraction of Limiting Power Density (FLPD) - the ratio of the linear heat generation rate (LHGR) existing at a given location to the design LHGR for the bundle type. Design LHGRs are 18.5 KW/f t for 7x7 bundles and 13.4 KW/ft for 8x8 bundles.

1T. Core Maximum Fraction of Limiting Power Density (CMFLPD) - the CMFLPD is the highest value existing in the core of the FLPD.

HATCH - UN11 1 1.0-7 Proposed TS/0257q/006-133

---____=__-___-____________ i

BASES FOR SAFETY LIMITS 1.1 FUEL CLA0 DING-INTEGRITY A. FuelCladbinoIntegritylimitatReactorPressure>800psiaandCore .i Flow > 10% of Rated  !

The fuel cladding integrity Safety Limit is set such that no fuel damage is calculated to occur if the limit is not violated. Since the parameters which result in fuel damage are not directly observable during reactor operation the thermal and hydraulic conditions resulting in a departure from nucleate boiling have been used to mark the beginning of the region where fuel damage could occur. Although it is. recognized that a departure from nucleate Loiling would not necessarily result in damage to BWR fuel rods, the critical power at which boiling transition is calculated to occur has been adopted as a convenient limit. However, the uncertainties in monitoring the core operating state and in the procedures used to calculate the critical power result in an uncertainty in the value of the

' critical power. Therefore the fuel cladding integrity safety limit is defined as the critical power ratio in the limiting fuel assembly for which more than 99.9% of the fuel rods in the core are expected to avoid boiling transition considering the power distribution within the core and all uncertainties.

The MCPR Safety Limit is determined using a model that combines all of the uncertainties in operating parameters and the procedures used to calculate critical power. The probability of the occurrenr.e of boiling transition is determined using an NRC-approved critical power correlation.

This MCPR Safety Limit is increased for single-loop operation over the comparable two-loop value (Reference 2). Details of the fuel cladding integrity Safety Limit calculation are presented in Reference 1.

I i

1 HATCH - UNIT 1 1.1-6 Proposed TS/02584/128-141 l

l

BASES FOR SAFETY LIMITS 1.1.B. Core Thermal Power Limit (Reactor Pressure < 800 osia)

At pressures below B00 psia, the core elevation pressure drop (0 power, i 0 flow) is greater than 4.56 psi. At low powers and flows this pressure differential is maintained in the bypass region of the core. Since the pressure drop in the bypass region is essentially all elevation head, the core pressure drop at low powers and flows will always be greater than 4.56 psi. Analyses show that with a flow of 28x108 lbs/hr bundle flow, bundle pressure drop is nearly independent of bundle power and has a value of 3.5 psi. Thus, the bundle flow with a 4.50 psi driving head will be greater than 28x10s lbs/hr. Full scale ATLAS test data taken at pressures from 14.7 psia to 800 psia indicate that the fuel assembly critical power at this flow is approximately 3.35 MWt. . With the design peaking factors this corresponds to a core thermal power of more than 50%. Thus, a core thermal power limit of 25% for reactor pressures

-below 800 nsia'is conservative.

C. Power ransient Plant safety analyses have shown that the scrams caused by exceeding any safety system setting will assure that the Safety Limit of 1.1. A or 1.1.8 will not be exceeded. Scram times are checked periodically to assure the insertion times are adequate. The thermal power transient resulting when a scram is accomplished other than by the expected scram signal.(e.g., scram from neutron flux following closure of the main turbine stop valves) does not necessarily cause fuel damage. However, for this specification a Safety Limit violation will be assumed when a scram is only accomplished by means of a backup feature of the plant design. The concept of not approaching a Safety Limit provided scram signals are operable is supported by the extensive plant safety analysis.

l' HAlCH - UNil 1 1.1 -7 Proposed 15/0258q/006-141

_ - - _ _ - _ _ _ = _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

BASES FOR SAFETY LIMITS D. Reactor Water Level (Hot or Cold Shut'down Condition)

For the fuel in the core during periods when the reactor is shutdown,-consi-deration must be given to water level requirements due to the ef fect of decay heat. If the water. level should drop below the top of the fuel during .

this time,-the ability to remove decay heat is reduced. This reduction in cooling capability could lead to elevated cladding temperatures and clad perforation in the event that the water level became less than two-thirds of the core height. The Safety Limit has been established at 378 inches above vessel invert to provide a point which can be monitored and also provide adequate margin.

E. References

1. " General Electric Standard Application for Reactor Fuel (Supplement'for l United States)," NEDE-240ll-P-A.
2. "Edwin I. Hatch Nuclear Plant Units 1 and 2 Single-Loop Operation,"

NE00-24205,- August 1979.

i i

l l

l HATCH - UNil 1 1.1-8 Proposed IS/0258q/006-141

____1______________._______._._.._ _ -.___ _

_ _ _ . _ _ _ _ _ _ _. . _ . - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - ~ ~ - ~ - ~ ~

l

'LIQlTING CONDITIONS FOR OPERATION SURVEILLANCE RE0VIREMENTS L 3.3.F. Operation with a Limitina Control 4.3.F.

t. Operation with a Limitina Control Rod Pattern (for Rod Withdrawal Rod Pattern (for Rod Withdrawal Error. RWE)

_ Error. RWE)

.... A Limiting Rod Pattern for RWE exists During operation when a Limiting when the MCPR is less than the value Control Rod Pattern for RWE exists provided in the Core Operating Limits and only one RBM channel is Report.

operable, an instrument functional test of the RBM shall be performed ]

j prior to withdrawal of the control <

rod (s). A Limiting Rod Pattern for During operation with a Limiting RWE is defined by Specification f Control Rod Pattern for RWE and 3.3.F.

when core thermal power is > 30%,

either:

1. Both rod block monitor (RBM) l j channels shall be operable, or
2. If only one RBM channel is oper-able, control rod withdrawal shall be blocked within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or
3. If neither RBM channel is oper-able, control rod withdrawal shall be blocked.

G. Limitina the Worth of a Control Rod Below 10% Rated Thermal Power lG. Limiting the Worth of a Control Rod Below 10% Rated Thermal Power l

1. Rod Worth Minimizer (RWM) 1. Rod Worth Minimizer (RWM) k.1enever the reactor is in the Start Prior to the start of control

& Hot Standby or Run Mode below 10% rod withdrawal at startup, and rated thermal power, the RWM shall be operable or a second licensed as soon as automatic initiation of the RWM occurs during rod operator shall verify that the insertion while shutting down, operator at the reactor console is the capability of the RWM to f ollowing the control rod program, properly fulfill its function shall be verified by the following checks.

a. The correctness of the Banked Position Withdrawal Sequence input to the RWM g computer shall be verified. -
b. The RWM computer on line diagnostic test shall be successfully performed.
c. Proper annunciation of the selection error of at least one out-of-sequence control rod in each fully inserted group shall be verified.
d. The rod block function of the PWM shall be verified by withdrawing or inserting an out-of-sequence control rod no more than to the block point. I HATCH - UNIT 1 3.3-5 Proposed TS/0260g/129-132

LIMIT [NG CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.3.G.2. Rod Secuence Control System (RSCS) 2. Rod Seauence Control System (RSCS1

a. Ope rebility a. Operability When the reactor is in the Start As soon as the group notch and Hot Standby or Run Mode below mode is entered during each 10% rated thermal power and control l reactor startup and as soon rod movement is within the group as automatic initiation of notch mode after 50% of the the RSCS occurs during rod control rods have been withdrawn, insertion while shutting the Rod Sequence Control System down, the capability of the shall be operable except when Rod Sequence Control System performing the RWM surveillance to properly fulfill its tests, function shall be verified by attempting to select and move an inhibited control rod.

When the control rod movement is within the group notch mode and as soon as automatic initiation of the RSCS occurs during rod insertion while shutting down, the operability of the notching restriction shall be demonstrated by attempting to move a control rod more than one notch in the first programmed rod group.

b. Failed Position Switch b. Failed Position Switch Control rods with a failed " Full- A second licensed operator in" or " Full-out" position switch shall verify the conformance may be bypassed in the Rod to Specification 3.3.G.2.b Sequence Control System if the ac- before a rod may be bypassed tual rod position is known. These in the Rod Sequence Control rods shall be moved in sequence to System, their correct positions (full in on insertion or full out on withdrawal).

I I

~

l 1

l I

l HATCH - UNIT 1 3.3-6 Proposed TS/0260g/129-132 l i L__ - 1

l LIMITING CONDITIONS FOR OPERATION SURVEILLANCE RE0UIREMENTS 3.3.G.2.c. Shutdown Marcin/Sc' ram 4.3.G.2.c. Shutdown Marcin/ Scram Time Time Testing Testina 3t. or[er to perform the Prior to control rod with-required shutdown margin drawal for startup, verify demonstrations subsequent the conformance to Spect-to any fuel loajing opera- fication 3.3.G.2.b. before tions, or to perform con- a rod may be bypassed in trol rod drive scram and/or. the RSCS. The requirements friction testing as specified to allow use'of the indi-in Surveillance Requirement vidual rod position bypass 4.3.C.2 and the initial start- switches within rod groups up test program, the relaxa- A12, A34, B12, or B34 Of tion of the following RSCS the RSCS during shutdown

. restraints is permitted. The margin, scram time or f ric-sequence restraints imposed tion testing are:

on control rod groups Ajp, A34, B 12, or 8 34 after 50% (1) RWM operable as'per Speci-of the control rods have been fication 3.3.G.l.

withdrawn may be removed for the test period by means of the (2) After the bypassing of individual rod position bypass the rods in the RSCS groups switches. A12, A34 B12, or B34 for test purposes, it shall be demonstrated that movement of the rods in the 50% dens-ity to 10% of rated thermal power range is blocked or  ;

limited to the single notch mode of withdrawal.

(3) A second licensed operator shall verify the conformance to trocedures and this Specification.

H. Shutdown Requirements If Specifications 3.3.A through 3.3.G are not met, an orderly shutdown shall be initiated and the reactor placed in the Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

I HATCH - UNIT 1 3.3-7 Proposed TS/02600/006-132 j

BASES FOR LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS B. Control Rods Limiting tonditions for Operation:

Specification 3.3.B.1 requires that a rod which cannot be moved with drive pressure be taken out of service by being disarmed electrically. To disarm the drive electrically, four amphenol type plug connectors are removed f rom the drive insert and withdrawal solenoids rendering the rod incapable of withdrawal. This procedure is equivalent to valving out the drive and is preferred because, in this condition, drive water cools and minimizes crud accumulation in the drive. Electrical disarming does not eliminate position indication. If the rod is f ully inserted and dis, armed electrically, it is in a safe position of maximum contribution to shutdown reactivity.

If it is disarmed electrically in a non-fully inserted position, that position shall be consistent with the shutdown reactivity.limitatior, stated in Specification 3.3.A. This assures that the core can be shutdown at all times with the remaining control rods, assuming the highest worth operable- l control rod does not inw-t. An allowable pattern for control rods disarmed  ;

electrically, which shall meet this Specification, will be determined and l made available to the operator. Also if damage within the control rod drive i mechanism and in particular, cracks in drive internal housing, cannot be i ruled out, then a generic problem affecting a number of drives cannot be ruled out. Circumferential cracks resulting from stress assisted intergranular corrosion have occurred in the collet housing of drives at several BWRs.

This type of. cracking could occur in a number of drives and if the cracks propagated until severance of the collet housing occurred, scram could be -

prevented in the affected rods. Limiting the period of operation with a potentially severed collet housing will assure that the reactor will not be operated with a large number of rods with failed collet housings.

Surveillance Requirements:

The weekly control rod exercise test serves as a periodic check against deterioration of the control rod system and also verifies the ability of the control rod drive to scram, since, if a rod can'be moved with drive pressure, it will scram because of higher pressure applied during scram.

The frequency of exercising the control rods under the conditions of three or more inoperable rods provides even further assurance of the reliability of the remaining control rods. l l

1.

f l

HATCH - UNIT 1 3.3-9 Proposed TS/0260g/006-28 l

I

~~~

BASES FOR LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3.3.F. Operation with a Limitina Control Rod Patter') (for Rod Withdrawal Error. RWEl Surveillance Requirements:

A limiting control rod pattern for RWE is a pattern which, due to unrestricted withdrawal of any single control rod, could result in violation of the MCPR Safety Limit. Specification 3.3.F. defines a limiting control rod pattern for RWE. During use of such patterns when both RBM channels are not operable, it is judged that testing of the RBM system prior to withdrawal of control rods to assure its operability will-assure that improper withdrawal does not occur. Reference NEDC-30474-P (Ref.17) for more information.

G. Limitina the Worth of a Control Rod Below 10% Rated Thermal Power l

1. Rod Worth Minimizer (RWM)

Limiting Conditions for Operation:

The RWM and the Rod Sequence Control System (RSCS) restrict withdrawals l and insertions of control rods to prespecified sequences. All patterns associated with these sequences have the characteristics that, assuming the worst single deviation f rom the sequence, the drop of any control rod from the fully inserted position to the position of the control rod drive would not cause the reactor to sustain a power excursion resulting in any .)

pellet averaga enthalpy in excess of 280 calories per gram. An enthalpy i of 280 calories per gram is well below the level at which rapid fuel i dispersal could occur (i.e., 425. calories per gram). Primary system damage in this accident is not possible unless a significant amount of fuel is rapidly dispersed. Reference Sections 3.6.5.4, 3.6.6, 7.14.5.3, l and 14.4.2, and Appendix P of the FSAR, and NED0-24040. i i

1 l

HATCH - UNIT 1 3.3-15 Proposed TS/0260g/006-105 1

'i BASES FOR LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS i

3.3.G.I. Rod Worttr Minimizer (RWM) (Continued)

In performing the function described above, the RWM and RSCS are not re-quired to impose any restrictions at core power levels in excess of 10% l of rated. Material in the cited references shows that it is impossible to reach 280 calories per gram in the event of a control rod drop occur-ring at power greater than 10%, regardless of the rod pattern. This is l true for all normal and abnormal patterns including those which maximize the individual control rod worth.

At power levels below 10% of rated, abnormal control rod patterns could l ,

produce rod worths high enough to be of concern relative to the 280 cal-  !

orie per gram rod drop limit. In this range of RWM and the RSCS con-strain the control rod sequences and patterns to those which involve only acceptable rod worths.

The RWM and the RSCS provide automatic supervision to assure that out l l of sequence control rods will not be withdrawn or inserted; i.e., it limits operator deviations from planned withdrawal sequences. They serve as a backup to procedural control of control rod sequences, which limit the maximum reactivity worth of control rods. In the event that the RWM is out of service, when required, a second licensed operator or l_

other qualified technical plant employee whose qualifications have been reviewed by the AEC can manually fulfill the control rod pattern conformance functions of this system.

The functions of the RWM and RSCS make it unnecessary to specify a license limit on rod worth to preclude unacceptable consequences in the event of a control rod drop. At low powers, below 10%, these devices force ad-herence to acceptable rod patterns. Above 10% of rated power, the con- ,

sequences of a rod drop event without RWM or RSCS are acceptable.

Power level for automatic cutout of the RSCS function is sensed by first stage turbine pressure. Power level for automatic cutout of the RWM function is sensed by feedwater and steam flow and is set to be consistent with the RSCS setting.

Surveillance Requirements:

Functional testing of the RWM prior to the start of control rod withdrawal at startup,-and prior to attaining 10% of rated thermal power during rod in-l sertion while shutting down, will ensure reliable operation and minimize the probability of the rod drop accident.

2. Rod Secuence Control System (RSCS)
a. Operability Limiting Conditions for Operation:

See bases for Technical Specification 3.3.G.I. Rod Worth Minimizer.

l l

HATCH - UNIT 1 3.3-16 Proposed TS/02604/006-132

L. '

BASES FOR LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3.3.G.2.c. Shutdown Marcin/Stram Time Testino (Continued) tion simulation switches provided in the RSCS.for such purposes. i During the scram time testing, reactor. conditions will be such that the reactor rod pattern will be in RSCS 8. group. All A12 and

'A34 rods will be fully withdrawn, alternatively the rod pattern will be in RSCS group A and all B12 and B34 rods will be fully l withd rawn. To test A34 rods, it will be necessary to simulate l all withdrawn B rods as being at the full-in position, and for testing A 34 and all withdrawn B rods as being at the full 12 rods, all The in position. A simulation of already withdrawn control rods in the-100% to 50% rod density range (A12 and A34 0F I alternatively B12 and B34) as being full-in to perform the

~

individual rod test does not violate the intent of the RSCS since; (a) the single notch mode of rod withdrawal for rods in the 50%

density to 10% of rated thermal power range will remain in effect until that power level has been achieved and the test procedure will require that this be verified; (b) no B group rods can be selected either for withdrawal or insertion during the time that an A12 or A34 rod is fully inserted or is simulated as being .;

in the fully inserted position (similarly for the A group rods j when.the B sequence is chosen for startup and (c) all rod position i simulation switch operations will be verified by a second  !

independent check.

H. Shutdown Requirements

. Should circumstances be 'such that the Limiting Conditions for Operation as stated in Specifications 3.3.A. through 3.3.G. cannot be met, an orderly shutdown shall be initiated and the reactor placed in '

the Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. j I. Scram Discharae Volume Vent and Drain Valves The scram discharge volume vent and drain valves are required to be OPERABLE, so that the scram discharge volume will be available when needed to accept discharge water from the control rods during a reactor scram and will isolate the reactor coolant system from the containment when required.

J. References

1. FSAR Section 3.4, Reactivity Control Mechanical Design
2. FSAR Section 3.5.2, Safety Design Bases
3. FSAR Section 3.5.4, Safety Evaluation
4. FSAR Section 3.5, Control Rod Drive Housing Supports l

HATCH - UNIT 1 3.3-18 Proposed TS/0260g/006-97

_j

BASES FOR LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE0VIREMENTS 3.6.1. Jet Pumps (Continued)

A nozzle-riser system failure could also generate the coincident failure of a jet pump body; however, the converse is not true. The lack of any substantial stress in the jet pump body makes f ailure impossible without an initial nozzle riser system failure.

One of the acceptable procedures for jet pump surveillance, identified in NUREG/CR-3025, Reference 2, was adopted for Hatch Unit 1. The surveillance is performed to verify that neither of the following conditions occur:

(a) The Recirculation Pump Flow / Speed Ratio deviates by more than 5% from the normal range, or (b) The Jet Pump Loop Flow / Speed Ratio deviates by more than 5% from the normal range.

If either criterion is f ailed, then the procedure calls for comparing either the individual jet pump flow or individual jet pump dif fuser to lower plenum differential pressures to the criteria of the Limiting

) Conditions for Operation (LCO). If the LCO criteria are not satisfied

[ and pump speed is less than 60% of rated, it may be necessary to increase pump speed to above 60% of rated and repeat the measurements

{ before declaring a jet pump inoperable. In this case, it is

) recommended that close monitoring and increased recirculation pump

~

speed should be performed only if the criteria are exceeded by an amount to be determined from previous plant operating experience.

3.6.J. Recirculation System Operation with a single reactor coolant system recirculation pump.is allowed, provided that adjustments to the flow referenced scram and APRM rod block setpoints, MCPR cladding integrity Safety Limit, MCPR Operating Limit, and MAPLHGR limit are made. An evaluation of the performance of the ECCS with single-loop operation has been performed and determined to be acceptable, Reference 4. Based on this Reference, a f actor is applied to reduce the APLHGR limits during single-loop operation. To account for increased uncertainties in the total core flow and TIP readings when operating with a single recirculation loop, an increase is applied to the l MCPR cladding integrity Safety Limit and MCPR Operating Limit over the comparable two-loop values. The flow referenced simulated thermal power scram and rod block setpoints for single-recirculation-loop operation is reduced by the amount of maw, where m is the flow reference slope for the >

rod block monitor and aW is the largest dif f erence between two-loop an(

single-loop ef fective drive flow when the active loop indicated flow is the same. This adjustment is necessary to preserve the original relationship between the rod block and actual ef fective drive flow.

When restarting an idle pump, the discharge valve of the idle. loop is required to remain closed until the speed of the faster pump is below 50% of its rated speed to provide assurance that when going f rom one- to two-loop operations, excessive vibration of the jet pump risers will not occur.

l The possibility of experiencing limit cycle oscillations during single-loop l

operation is precluded by restricting the core flow to greater than or equal to 45% of rated core flow when core power is greater than the 80% rod line.

l This requirement is based on General Electric's recommendations contained in SIL 380, Revision 1, which defines the region where the limit cycle oscillations are more like!! to occur.

HATCH - UNil 1 3.6-22 Proposed IS/0261g/006-n;i l-

_ _ _ _ _ _ -_ ________ __-__ - - __ _ _ _ - _ a

p.

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.11. FUEL RODS 4.11. FUEL RODS Applicability Applicability The Limiting Conditions for Operation The Surveillance Requirements apply associated with the fuel rods apply to to the parameters which monitor the those parameters which monitor the fuel rod operating conditions, fuel rod operating conditions.

Objective Objective The Objective of the Limiting Condi- The Objective of the Surveillance tions for Operation is to assure the Requirements is to specify the type performance of the fuel rods, and frequency of surveillance to be applied to the fuel rods.

Specifications Specifications A. Averaae Planar Linear Heat Genera- A. Averace Planar linear Heat Genera-tion Rate (APLHGR) tion Rate (APLHGR)

During power operation, the APLHGR The APLHGR'for each type of fuel as for all core locations shall not a function of average planar exceed the appropriate APLHGR limit. exposure shall be determined daily provided in the Core Operating Limits during reactor operation at 125%

Report. If at any time during oper- rated therchi power.

ation it is determined by normal surveillance that the limiting value for.APLHGR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits.

If the ALPHGR is not returned to within the prescribed limits within two (2) hours, then reduce reactor power to less than 25% of rated thermal power within the next four (4). hours. If the limiting condi-tion for operation is restored prior to expiration of the specified time interval, then further progression to less than 25% of rated thermal power is not required.

B. Linear Heat Generation Rate (LHGR)

The LHGR as function of core height shall be checked daily dur-ing reactor operation at 125%

rated thermal power.

i i

HATCH UNil 1 3.11-1 Proposed 15/0262q/006 141

_ - - _ - - _ . - _ - _ =

LIMITING CONDIVIONS FOR OPE M 10N SURVEILLANCE Rt00lREMENTS 3.ll.B. Linear Hest Generation Rate (LHGR) 4.ll.B. Linear Heat Generation Rate (LHGRI During power operation,-the LHGR The LHGR shall be checked daily

.e shall not exceed the limiting during reactor operation at 3 25%

value of 14.4 KW/ft for GE8x8EB rated thermal power.

fuel or the limiting value of 13.4 KW/f t for any other 8x8' fuel. ' If at any time during operation it is determined by Aormal surveillance that the limiting value for LHGR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the LHGR is not returned to within the prescribed limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, :j i

then reduce reactor power to '

less than 25% of rated thermal l Power within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

If the limiting condition for operation is restored prior to .i expiration of the specified time interval, then further progression to less than 25% of rated thermal l power is not required.

C. Minimum Critical Power Ratio (MCPR) C.l. Minimum Critical Power Ratly (MCPR)f  !

MCPR shall be equal to or greater l- MCPR shall be determined to be

' than the operating limit MCPR equal to or greater than the (OLMCPR) provided in the Core . applicable limit, daily during Operating Limits Report, reactor power operation at 1 25%

rated thermal power and following If at any time during operation it any change in power level or

-is determined by normal surveillance distribution that would cause that the limiting value for MCPR operation with a limiting control is being exceeded, action shall be rod pattern as described in the

-initiated within 15 minutes to bases for Specification 3.3.F.

restore operation to within the prescribed limits. If the steady state MCPR is not returned to within 2.

the prescribed limits within two (2) Minimum Critical Power Ratio Limit f hours, then reduce reactor power to The MCPR limit at rated flow and s less than 25% of rated thermal power rated power shall be determined within the next four(4) hours. if as provided in the Core Oper--

the Limiting Condition for Operation ating Limits Report using:

is restored prior to expiration of the specified time interval, then a. Average scram insertion time f urther progression to less than to notch 36 = 1.096 s, prior 25% of rated thermal power'is not to the initial scram time required. measurements for the cycle performed in accordance with Specification 4.3.C.2.a. or

b. Scram insertion time measure-ments performed in accordance with Specification 4.3.C.2.

The determination of the limit must be completed within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the conclusion of each scram time surveillance test required by Specification 4.3.C.2.

HAICH - UNil 1 3.11-2 Proposed 15/0262q/128-157 j

_ _ _ _ _ _ _ - _ - _ _ _ _ _ _ ~

l BASES FOR LIMITING CONDITTONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3.11. FUEL R005 -

A. Average. Planar Linear Heat Generation Rate ( APLHGR)

This specification assures that the peak cladding temperature following the postulated design basis loss-of-coolant accident (LOCA) will not exceed the limit specified in 10 CFR 50.46 even considering the postulated ef fects of fuel pellet densification.

The peak cladding temperature following a postulated loss-of-coolant acci-dent is primarily a f unction of the average heat generation rate of all the rods of a fuel assembly at any axial location and is only dependent second-arily on the rod to rod power distribution within an assembly. Since ex-pected local variations in power distribution within a fuel assembly af fect the calculated peak clad temperature by less than i 20'F relative to the peak temperature for a typical fuel design, the limit on the average linear heat generation rate is sufficient to assure that calculated temperatures. ,

conform to 10 CFR 50.46. The limiting value for APLHGR is provided in the Core Operating Limits Report.

The calculational procedure used to establish the APLHGR limits is based on a LOCA analysis. The analysis was performed using General Electric (GE) 1 calculational models which are consistent with the requirements of Appendix K to 10 CFR 50. The LOCA analysis was performed utilizing the new improved calculational model, SAFER /GESTR-LOCA. The analysis demonstrated that loss-of-coolant concerns do not limit the operation of the fuel since margin to the 2200*F limit was demonstrated (Reference 9). Therefore, the ,

APLHGR limits are derixed to assure that the fuel thermal-mechanical l <

design criteria are met.

A flow dependent correction f actor is applied to the rated conditions APLHGR to assure that the 2200'F PCT limit is complied with during LOCA initiated from less than rated core flow. In addition, other power and flow dependent corrections are applied to the rated conditions APLHGR l limits to assure that the fuel thermal-mechanical design criteria are met during abnormal transients initiated f rom of f-rated conditions for two-loop and single-loop operation 3, References 2 and 8. For single-loop operation, a multiplicative factor is applied to the rated conditions A'/LHGR ',imit for all fuel bundles when core power exceeds a specified vaiue. The power and flow-dependent correction factors, and the limiting values for APLHGR for each fuel type used in a particular cycle are specified in the Core Operating Limits Report.

HATCH - UNIT 1 3.11-3 Proposed TS/0262q/006-157

i BASES FOR LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS y 3.11. B . Linrar Heat Generation Rate (LHGR)

This specification assures that the LHGR in any rod is less than the design linear heat generation if fuel pellet densification is postulated. For LHGR to be a limiting value below 25-percent rated thernal power, the ratio of peak LHGR to core average LHGR would have to be greater than 9.6, which is precluded by a considerable margin when employing any permissible control rod pattern.

C. Minimum Critical Power Ratio (MCPR)

'The required operating limit MCPR as specified in Specification 3.11.C is derived from the established fuel cladding integrity Safety Limit MCPR and an analysis of abnormal operational transients presented in Reference 1.

Various transient events will reduce the MCPR below the operating MCPR.

To assure that the fuel cladding integrity Safety Limit is not violated during anticipated abnormal operational transients, the'most limiting transients have been analyzed to determine which one results in the largest reduction in critical power ratio (A MCPR). Addition of the largest A MCPR to the Safety Limit MCPR gives the minimum operating limit MCPR to avoid violation of the Safety Limit should the most limiting transient occur.

The type of transients evaluated were loss of flow, increase in pressure and power, positive reactivity insertion, and coolant temperature decrease.

Details of how MCPR evaluations are performed, the methods used, and how the MCPR limit is adjusted for operation at less than rated power and flow conditions used for single-loop operation are given in Reference 1 and in the Core Operating Limits Report.

l i

l i

i HATCH - UNIT 1 3.11-4 Proposed TS/0262q/006-157 m______.________.__________

_ _ _ _ _ _ _ i

ADMINISTRATIVE CONTROLS

e. Type of container, e.g., LSA, type A, type B, large quantity.

I f. Solidification agent, e.g., cement.

The Radioactive Effluent Release Report shall include (on a quarterly basis) unplanned releases from the site to unrestricted areas of radioactive materials in gaseous and liquid effluents that were in excess of 1 Ci, excluding dissolved and entrained gases and tritium for liquid effluents, or those in excess of 150 Ci of noble gases or 0.02 Ci of radioiodines for gaseous releases.

The Radioactive Ef fluent Release Report shall include any changes to the PROFESS CONTROL PROGRAM and to the OFFSITE DOSE CALCULATION MANUAL made during the reporting period.

MONTHLY OPERATING REPORT 6.9.1.10. Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Director, Office of Management and Program Analysis, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, with a copy to the Regional Office of Inspection and Enforcement no later than the 15th of each month following the calendar month covered by the report.

CORE OPERATING LIMITS REPORT 6.9.1.11 Core operating limits shall be established and documented in the Core Operating Limits Report before each reload cycle or any remaining part of a reload cycle. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC in NEDE-240ll-P-A, " General Electric Standard Application for Reactor Fuel,"

(Applicable Amendment specified in the Core Operating Limits Report) and in the " Safety Evaluation by the Office of Nuclear Reactor Regulation Supporting Amendment No.157 to Facility Operating License DPR-57," dated September 12, 1988. The core operating limits shall be determined so that all applicable limits (e.g., f uel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met. The Core Operating Limits Report, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

HATCH - UNIl I 6 -15d Proposed TS/0264q/006 -149

ENCLOSURE 3 PLANT HATCH - UNIT 2 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 RE00EST TO REVISE TECHNICAL SPECIFICATIONS REACTIVITY CONTROL SYSTEMS AND REMOVAL OF CYCLE-SPECIFIC PARAMETER LIMITS PAGE CHANGE INSTRUCTIONS Removed Paae Insert Paae I I XVI XVI 1-2 1-2 82-1 B2-1 B2-2 B2-2 82-3 B2-3 B2-4 B2-4 B2-5 B2-5 B2-13 B2-13 3/4 1-4 3/4 1-4 3/4 1-14 3/4 1-14 3/4 1-15 3/4 1-15 3/4 1-16 3/4 1-16 l 3/4 1-17 3/4 1-17  !

3/4 2-1 3/4 2-1 3/4 2-2 3/4 2-2 3/4 2-3 3/4 2-3 3/4 2-4 3/4 2-4  !

3/4 2-4a ---

i 3/4 2-4b ---

3/4 2-4c ---

3/4 2-4d ---

3/4 2-4e - 3/4 2-4i ---

i 3/4 2-4j ---

3/4 2-4k ---

3/4 2-6 3/4 2-6 3/4 2-7 3/4 2-7 3/4 2-7a 3/4 2-7a i 3/4 2-7b 3/4 2-7b 3/4 2-7d 3/4 2-7c ---

3/4 2-7d ---

3/4 3-39 3/4 3-39 3/4 3-42 3/4 3-42 3/4 10-2 3/4 10-2 q l B 3/4 1-3 B 3/4 1-3 i l

B 3/4 2-1 B 3/4 2-1 B 3/4 2-2 B 3/4 2-2 I Page 1 of 2 4

ENCLOSURE 3 PLANT HATCH - UNIT 2 i NRC DOCKET 50-366 i OPERATING LICENSE NPF-5 l RE0 VEST TO REVISE TECHNICAL SPECIFICATIONS l REACTIVITY CONTROL SYSTEMS AND l REMOVAL OF CYCLE-SPECIFIC PARAMETER LIMITS l I

PAGE CHANGE INSTRUCTIONS Removed Paae Insert Pace B 3/4 2-3 B 3/4 2-3 j B 3/4 2-4 B 3/4 2-4 1' B 3/4 2-6 B 3/4 2-6 B 3/4 4-1 B 3/4 4-1 6-14d 6 - le'd Page 2 of 2

INDEX DEFINITIONS  !

1

-SECTION -

1.0 DEFINITIONS PAGE i

.' ACTION 1-1.

l AVERAGE PLANAR EXPOSURE 1-1 l

AVERAGE PLANAR LINEAR HEAT GENERATION RATE 1-1 l CHANNEL CALIBRATION 1-l' l

CHANNEL CHECK 1-1 CHANNEL FUNCTIONAL TEST 1-1  !

CORE ALTERATION 1-2 l 1

CORE MAXIMUM FRACTION OF LIMITING POWER DENSITY 1-2  !

CORE OPERATING. LIMITS REPORT 1-2 l CRITICAL POWER RATIO '1-2  !

E-AVERAGE DISINTEGRATION ENERGY 1-2 i EMERGENCY CORE COOLING SYSTEM (ECCS) RESPONSE TIME 1-2a FRACTION OF LIMITING POWER DENSITY 1-3  !

FREQUENCY NOTATION 1-3 l 1

IDENTIFIED LEAKAGE 1-3 ISOLATION SYSTEM RESPONSE TIME 1-3 i

LIMITING CONTROL R0D PATTERN 1-3 l l

LINEAR HEAT GENERATION RATE 1-3 ,

t LOGIC SYSTEM FUNCTIONAL TEST 1-3 MINIMUP' CRITICAL POWER RATIO 1-4 OPERABLE - OPERABILITY 1-4 l OPERATIONAL CONDITION 1-4 PHYSICS TESTS 1-4 HATCH-UNIT 2 I Proposed TS/0263q/006-48

n:

1

' i INDEX .

ADMINISTRATIVE CONTROLS SECTION PAGE.

SAFETY REVIEW BOARD (Continued)

Audits. 6-10 1 Authority .6-11 Records 6-11 6.6 REPORTABLE EVENT ACTION 6-11 6.7 SAFETY LIMIT VIOLATION 6-11 6.8' PROCEDURES 6-12:

6.9 REPORTING REQUIREMENTS ROUTINE. REPORTS 6-13  ;

'STARTUP. REPORT 6-13 l ANNUAL REPORTS 6-13 ANNUAL RADIOLOGICAL ENVIRONMENTAL SURVEILLANCE REPORT 6-14  :

SEMI-ANNUAL RADI0 ACTIVE EFFLUENT RELEASE REPORT 6-14a  ;

MONTHLY OPERATING REPORT 6-14d CORE OPERATING LIMITS REPORT 6-14d l l

SPECIAL REPORTS 6-17 6.10 RECORD RETENTION 6-17 6.11 RADIATION PROTECTION PROGRAM 6-18 .

6.12 HIGH RADIATION AREA 6-18 HATCH-UNIT 2 XVI Proposed TS/0263q/006-86

1.0 - DEFIN!TIONS (Continued) i CHANNEL FUNCTIONAL TEST A CHANNEL FUNCTIONAL TEST shall be:

1 I a. Analog channels - the injection of a simulated signal into the channel as close to the primary sensor as practicable to verify OPERABILITY including alarm and/or trip functions and channel failure trips.

b. Bistable channels - the injection of a simulated signal into the channel sensor to verify OPERABILITY including alarm and/or trip functions.

CORE ALTERATION CORE ALTERATION shall be the addition, removal, relocation or movement of fuel, sources, incore instruments or reactivity controls within the reactor pressure vessel with the vessel head removed and fuel in the vessel, Suspension of CORE ALTERATIONS shall not preclude completion of the movement of a component to a safe conservative position.

CORE MAXIMUM FRACTION OF LIMITING POWER DENSITY  !

The CORE MAXIMUM FRACTION'0F LIMITING POWER DENSITY (CMFLPD) shall be the largest FLPD which exists in the core for a given operating condition.

CORE OPERATING LIMITS REPORT The CORE OPERATING LIMITS REPORT shall be the unit-specific document that provides core operating limits for the current operating reload cycle. These cycle-specific core operating limits shall be determined for each reload cycle in accordance with Specification 6.9.1.11. Plant operation within these  !

operating limits is _ addressed in individual specifications.

CRITICAL POWER RATIO The CRITICAL POWER RATIO (CPR) shall be the ratio of that power in the assembly.which is calculated by application of an NRC-approved critical power correlation to cause some point in the assembly to experience boiling transition, divided by the actual j assembly operating power.

E-AVERAGE DISINTEGRATION ENERGY 5shallbetheaverage,weightedinproportiontothe concentration of each radionuclides in the reactor coolant at the time of sampling, of the sum of the average beta and gamma energies per disintegration, in MeV, for isotopes with half lives greater than 15 minutes, making up at least 95% of the total non-iodine activity in the coolant.

HATCH - UNIT 2 1-2 Proposed TS/0267q/006-48

L i

1 2.1 SAFETY LIMITS BASES I

J 2.0 The fuel cladding, reactor pressure vessel and primary system piping are the principal barriers to the release of radioactive materials to the environs. Safety Limits are established to protect the integrity of these barriers during normal plant operations and anticipated tran-sients. The fuel cladding integrity Safety Limit is set such that no fuel damage is calculated to occur if the 11init is not violated. Because fuel damage is not directly observable, a step-back approach is used to establish a Safety Limit such that the MCpR is not less than 1.07 for two-loop operation and 1.08 for single-loop operation. These limits represent a conservative margin relative to the conditions required to maintain fuel cladding integrity. The fuel cladding is one of the physical barriers which separate the radioactive materials from the environs. The integrity of this cladding barrier is related to its relative freedom from perforations or cracking. Although some corrosion or use related cracking may occur during the life of the cladding, fission product migration from this source is incrementally cumulative and continuously measurable. Fuel cladding perforations, however, can result from thermal stresses which occur from reactor operation significantly above design conditions and the Limiting Safety System Settings. While fission product migration from cladding perforation is just as measurable as that from use related cracking, the thermally caused cladding perforations signal a threshold beyond which still ,

greater thermal stresses may cause gross rather than incremental cladding  !

deterioration. Therefore, the fuel cladding Safety Limit is defined with a margin to the conditions which would produce onset of transition  !

boiling, MCPR of 1.0. These conditions represent a significant departure from the condition intended by design for planned operation.

The evaluations which justify normal operation, abnormal transient, and

, accident analyses for two-loop operation are discussed in detail in Reference 1

1. Evaluation for single-loop operation demonstrates that two-loop transient and accident analyses are more limiting than single-loop, Reference 2.

2.1.1 THERMAL POWER (Low Pressure or Low Flow)

The use of the NRC-approved transition boiling correlation is not valid- l for all critical power calculations at pressures below 785 psig or core flows less than 10% of rated flow. Therefore, the fuel cladding integrity Safety Limit is established by other means. This is_done by establishing a limiting condition on core THERMAL POWER with the following basis. Since the pressure drop in the bypass region is essentially all elevation head, the core pressure drop at low power and flows will always be greater than 4.5 psi. Analyses show that with a bundle flow of 28 x 10' lbs/hr, bundle pressure drop is nearly independent of bundle power and has a value of 3.5 psi. Thus, the bundle flow with a 4.5 psi driving head will be greater than 28 x 10' lbs/hr. Full scale ATLAS test data taken at pressures from 14.7 psia to 800 psia indicate that the fuel assembly critical power at this flow is approximately 3.35 MWt. With the design peaking factors, this corresponds to ,

HATCH - UNIT 2 B 2-1 Proposed TS/0266q/006-77

li i

l SAFETY LIMITS BASES (Continued) a THERMAL POWER of more than 50% of RATED THERMAL POWER. Thus, a THERMAL POWER limit of 25% of RATED THERMAL POWER for reactor pressure below 785 psig is conservative.

I 2.1.2 THERMAL POWER (High Pressure and High Flow) i

.The fuel cladding integrity Safety Limit is set such that no fuel damage is calculated to occur if the limit is not violated. Since the parameters which result in fuel damage are not directly observable dur-ing reactor operation, the thermal and hydraulic conditions resulting in a departure from nucleate boiling have been used to mark the beginning of the region where fuel damage could occur. Although it is recognized that a departure from nucleate boiling would not necessarily result in damage to BWR fuel. rods, the critical power at which boiling transition is calculated to occur has been adopted as a convenient limit.. However, the uncertainties in monitoring the core operating state and in the procedures used to calculate the critical power result in an uncertainty in the value of the critical power. Therefore, the fuel cladding integrity Safety Limit .is defined as the CPR in the limiting fuel assembly for which more than 99.9% of the fuel rods in the core are expected to avoid boiling transition considering the power distribution within the core and all uncertainties.

The'MCPR Safety Limit is determined using a model that combines all of l the uncertainties in operating parameters and the procedures used to calculate- i critical power. The probability of the occurrence of boiling transition is determined using an NRC-approved critical power correlation. Details of the fuel cladding integrity Safety Limit calculation are. presented in Reference 1.  ;

i l

HATCH - UNIT 2 8 2-2 Proposed TS/0266q/006-77

(This page intentionally blank) 2 I

HATCH - UNIT 2 B 2-3 Proposed TS/0266q/006-77

l. -

(This page intentionally blank)

HATCH - UNIT 2 B 2-4 Proposed TS/0266q/006-21

(This page intentionally blank)

I l

HATCH - UNIT 2 B 2-5 Proposed TS/0266q/006-0 i

r j LIMITING SAFETY SYSTEM SETTING BASES (Continued)

REACTOR PROTECTION SYSTEM INSTRUMENTATION SETPOINTS (Continued)

Turbine Control' Valve Fast Closure, Trip Oil Pressure-Low (Continued) pressure switches whose contacts form the one-out-of-two-twice logic input to the Reactor Protection System. This trip setting, a nominally 50% greater closure time and a different valve characteristic from that of the turbine stop valve, combine to produce transients very similar to that for the stop valve. No significant change in MCPR occurs. Relevant transient' analyses are discussed in Section 15 of the Final Safety Analysis Report. This scram is bypassed when turbine steam flow is below that corresponding to 30% of RATED THERMAL POWER, as measured by turbine first stage pressure.

11. Reactor Mode Switch In Shutdown Position The reactor mode switch Shutdown position trip is a redundant channel to the automatic protective instrumentation channels and provides additional manual reactor trip capability.
12. Manual Scram The Manual Scram is a redundant channel to the automatic protective instrumentation channels and provides manual reactor trip capability.

2.3 REFERENCES

1. "GeneralElectricStandardApplicationforReactorFuel(Supplementfor]

United States)," NEDO-24011-P-A.

2. "Edwin I. Hatch Nuclear Plant Units 1 and 2 Single-Loop Operation," l NEDO-24205, August 1979.

i HATCH-UNIT 2 B 2-13 Proposed TS/02C6q/006-77

REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.3.1 All withdrawn control rods that do not have their directional control valves electrically disarmed or their withdraw isolation valve closed shall be demonstrated OPERABLE by moving each control rod at least one notch;

a. At least once per 7 days when above 30% of RATED THERMAL POWER, or
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when above 30% of RATED THERMAL POWER and three or more control rods are immovable.

t i

l l

HATCH - UNIT 2 3/4 1-4 . Proposed TS/0263q/006-0 1

i

i REACTIVITY CONTROL SYSTEMS . l 3/4.1.4 CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER l

LIMITING CONDITION FOR OPERATION 3.1.4.1 The Rod Worth Minimizer (RWM) shall be OPERABLE.

APPLICABILITY: CONDITIONS I and 2*, when THERMAL POWER is less than 10%

of RATED THERMAL POWER.

1 ACTION-i With the RWM inoperable, the provisions of. Specification 3.0.4 are not '

E applicable, operation may continue and control rod movement is permitted . i l provided that a second licensed operator or other qualified member of l l the technical staff is present at the reactor control console and verifies compliance with the prescribed control rod pattern, j l

SURVEILLANCE REQUIREMENTS 4.1.4.1 The RWM shall be demonstrated OPERABLE:

a. In CONDITION 2 prior to withdrawal of control rods for the purpose ,

of. making the reactor critical, and in CONDITION 1 when the RWM is  !

initiated during _ control rod insertion when reducing THERMAL POWER,  !

by:

1. Verifying proper annunciation of the selection error of at least one out-of-sequence control rod, and 2.. Verifying the rod block function of the RWM by moving an out- l of-sequence control rod, j i
b. By verifying that the Banked Position Withdrawal Sequence input to the l RWM computer is correct following cny loading of the sequence program  !

into the computer. l i

  • Entry into OPERATIONAL CONDITION 2 and withdrawal of selectec control  :

rods is permitted for the purpose of determining the OPERABILITY of the )

RWM prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

HATCH - UNIT 2 3/4 1-14 Proposed TS/0268q/006-66

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ . _. - _---_ _ - - ___ __ _ - _ - - - - - - - - - - - - - - -- - _ - - - - - - _----_----_--_J

REACTIVITY CONTROL SYSTEMS ,

ROD SEQUENCE CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.1.4.2 The Rod Sequence Control System (RSCS) shall be OPERABLE.

APPLICABILITY: CONDITIONS 1* and 2*#, when THERMAL POWER is less than'10% }

of RATED THERMAL POWER and control rod movement is within the group notch mode after 50% of.the control rods have been withdrawn.

ACTION:

With the RSCS inoperable control rod movement shall not be permitted, except by a scram.

SURVEILLANCE REQUIREMENTS 4.1.4.2 The RSCS shall be demonstrated OPERABLE by:

a. Selecting and attempting to move an inhibited control rod:
1. As soon as the group notch mode is entered during each reactor startup, and

'2. As soon as the red inhibit mode is automatically initiated during control rod insertion.

"See Special Test Exception 3.10.2.

  1. Entry into CONDITION 2 and withdrawal of selected control rods is permitted for the purpose of determining the OPERABILITY of the RSCS prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

HATCH.- UNIT 2 3/4 1-15 Proposed TS/0268q/006-66

REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b. Attempting to move a control rod more than one notch as soon as the group notch mode is automatically initiated during control rod:
1. Withdrawal each reactor startup, and
2. Insertion,
c. Performance of the comparator check of the group notch circuits pr;or to control rod;
1. Movement within the group notch mode during each reactor ,

startup, and '

2. Insertion to reduce THERMAL POWER to less than 10% of RATED THERMAL POWER.

l l

1 i l

HATCH - UNIT 2 3/4 1-16 Proposed TS/02684/006-66

/'

REACTIVITY CONTROL SYSTEMS- ,

R0D BLOCK MONITOR LIMITING CONDITION FOR OPERATION 3'.1. 4. 3 Both Rod' Block Monitor (RBM)~ channels shall be OPERABLE.

APPLICABILITY: CONDITION 1, when THERMAL POWER is greater than or equal to 30% of RATED THERMAL POWER'and when the MCPR is less than the value provided in the CORE OPERATING LIMITS REPORT.

' ACTION:

a. With one RBM channel inoperable, POWER OPERATION may continue provided that the inoperable RBM channel is restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; otherwise, trip at least one. rod block-monitor channel within the next hour. '
b. With both RBM channels inoperable, trip at least one rod block monitor channel within une hour.

SURVEILLANCE REQUIREMENTS 4.1.4.3 a. With both RBM channels OPERABLE, surveillance requirements are given in Specification 4.3.5.

b. With one RBM channel INOPERABLE, the other channel shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST prior to withdrawal of control rods.

HATCH-UNIT 2 3/4 1-17 Proposed TS/0268q/006-39

3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GEOERATION RATE

_ LIMITING CONDITION FOR OPERATION l i

3.2.1 ALL AVERAGE PLANAR LINEAR HEAT GENERATION RATES (APLHGRs) shall be equal to or less than their applicable APLHGR limits provided in the CORE OPERATING LIMITS REPORT.

APPLICABILITY: CONDITION 1, when THERMAL POWER 2 25% of RATED THERMAL POWER.

ACTION-  !

With an APLHGR exceeding its applicable limit provided in the CORE OPERATING I LIMITS REPORT, initiate corrective action within 15 minutes and continue l corrective action so that the APLHGR meets 3.2.1 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.1 All APLHGRs shall be verified to be equal to or less than their applicable APLHGR limits provided in the CORE OPERATING LIMITS REPORT:

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b, Whenever THERMAL POWER has been increased by at least 15% of RATED THERMAL POWER and steady state operating conditions have been established, and
c. Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL R0D PATTERN for APLHGR.

i I

i l

l HATCH - UNIT 2 3/4 2-1 Proposed TS/0273q/006-77 i

I

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - - _ - . _ - - - . _ - J

A i

Figure 3.2.1-1 (Deleted)

Figure 3.2.1-2 (Deleted)

Figure 3.2.1-3 (Deleted)

Figure 3.2.1-4 (Deleted)

Figure 3.2.1-5 (Deleted)

Figure 3.2.1-6 (Deleted)

Figure 3.2.1-7 (Deleted)

Figure 3.2.1-8 (Deleted)

Figure 3.2.1-9 (Deleted)

Figure 3.2.1-10 (Deleted)

Figure 3.2.1-11 (Deleted)

Figure 3.2.1-12 (Deleted)

Figure 3.2.1-13 (Deleted)

HATCH - UNIT 2 3/4 2-2 Proposed TS/0273q/006-87 L - - - ____-_-_ _ _ _ _ _ _ _ _ . _

I (This page intentionally blank) i I

HATCH - UNIT 2 3/4 2-3 Proposed TS/0273q/006-89

i i

1 1

i i

l l

(This page intentionally blank) i i

I HATCH - UNIT 2 3/4 2-4 Proposed TS/0273q/006-87  ;

1

^ .

l I

l' POWER DISTRIBUTION LIMITS i

3/4.2.3 MINIMUM CRITICAL POWER RATIO I

LIMITING CONDITION FOR OPERATION 3.2.3 ALL MINIMUM CRITICAL POWER RATIOS (MCPRs) shall be equal to or greater than their applicable MCPR operating limits provided in the CORE OPERATING LIMITS REPORT.

APPLICABILITY: CONDITION 1, when THERMAL POWER 2 25% RATED THERMAL POWER '

i l

l I

I HATCH - UNIT 2 3/4 2-6 Proposed TS/0273q/006-89 l l

l

_ _ - _ _ _ _ _. _ _ - - . __ I

3/4.2.3 MINIMUM CRITICAL POWER RATIO (CONTINUED)

ACTION:

I With MCPR less than~the applicable operating limit provided in the CORE  !

OPERATING LIMITS REPORT, initiate corrective action within 15 minutes and continue corrective action so that MCPR is equal to or greater than the I applicable limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than or I

equal to 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. j i

SURVEILLANCE REQUIREMENTS 4.2.3.1 The MCPR operating limits'shall.be determined as provided in the CORE OPERATING LIMITS REPORT using:

a. Average scram insertion time to notch 36 = 1.096 s, prior to the initial scram time measurements for the cycle performed in i accordance with Specification 4.1.3.2.a, or  !
b. Scram insertion time measurements performed in accordance with Specification 4.1.3.2. The determination of the limit must be completed within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the conclusion of each scram time surveillance test required by Specification 4.1.3.2.

4.2.3.2 All MCPRs shall be determined to be equal to or greater than the applicable limits:

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
b. Whenever THERMAL POWER has been increased by at least 15% of RATED THERMAL POWER and steady state operating conditions have been established, and
c. Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL R00 PATTERN for MCPR.

I l

HATCH'- UNIT 2 3/4 2-7 Proposed TS/0273q/006-89 j i

r Figure 3.2.3-1 (Deleted)

Figure 3.2.3-2 (Deleted)

Figure 3.2.3-3 (Deleted)

Figure 3.2.3-4 (Deleted) i

(

HATCH - UNIT 2 3/4 2-7a Proposed TS/0273q/006-89 i

~ . . .

l I

i 1

i l

i I

(These pages intentionally blank) l i

i HATCH - UNIT 2 3/4 2 3/4 2-7d Proposed TS/02734/006-66 l

..i

I l

I i

TABLE 3.3.5-1 (Continued)

CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION t

NOTE

a. When the limiting condition defined in section 3.1.4.3 exists. l
b. This function is bypassed if detector is reading > 100 cps or the IRM channels are on range 3 or higher.
c. This function is bypassed when the associated IRM channels are on range 8 or higher.
d. A total of 6 IRM instruments must be OPERABLE.
e. This function is bypassed when the IRM channels are on range 1.
f. With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.11.1 or 3.9.11.2.

HATCH - UNIT 2 3/4 3-39 Proposed TS/0269q/006-39

p TABLE.4.3.5-1 (Continued) ,

CONTROL R00 WITHDRAWAL BLOCK INSTRUMENTATION SURVEILLANCE REQUIREMENTS NOTES:

a. Neutron detectors may be excluded from CHANNEL CALIBRATION.
b. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />' prior to startup, if not performed within the
f. previous 7 days.
c. When changing from CONDITION 1 to CONDITION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering CONDITION 2.
d. When THERMAL POWER exceeds 30% of RATED THERMAL POWER. The l  !

additional. surveillance defined in Specification 4.1.4.3 will be required when the Limiting Condition defined in

-Specification 3.1.4.3 exists.

i

e. With any control rod withdrawn. Not applicable to control rods '

removed per Specification 3.9.11.1 or 3.9.11.2.

I l

i i

1 l-L . HATCH - UNIT 2 3/4 3-42 Proposed TS/0269q/006-39

l SPECIAL1 TEST EXCEPTIONS. ,

3/4.10.2 ROD SEQUENCE CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.10.2 The sequence constraints imposed on control rod groups A12' 4 A3 34 by the Rod Sequence Control System per Specification 3.4. B12 1.4.2 mayand B be suspended by means of the individual rod position bypass switches, provided that at least the requirements of Specification 3.1.3.1 and 3.1.4.1 are satisfied, for the following tests:

a. Shutdown margin demonstrations, Specification 4.1.1,
b. Control rod scram, Specification 4.1.3.2a,
c. Control rod friction measurements, and .
d. Startup Test Program, with the. THERMAL POWER <'10% of l RATED THERMAL-POWER.

APPLICABILITY: CONDITIONS 1 and 2.

ACTION:

With the requirements of the above specification not satisfied, verify I that the RSCS is OPERABLE per Specification 3.1.4.2.

SURVEILLANCE REQUIREMENTS 4.10.2 When the sequence constraints of control red groups Al2, A34' l B12 and.B34 are bypassed, verify; j

a. That the RWM is OPERABLE per Specification 3.1.4.1,
b. That movement of the control rods from 50% ROD DENSITY to 10% of RATED THERMAL POWER is blocked or limited to the single l notch mode, and l

l .c. Conformance with this specification and procedures by a second l licensed operator or other qualified member of the technical i staff.

l j

HATCH - UNIT 2 3/4 10-2 Proposed TS/0272q/006-0 1 1

)

REACTIVITY CONTROL SYSTEMS.

BASES CONTROL RODS (Continued) than has been analyzed even though control rods with inoperable accumulators may still be inserted with normal drive water pressure. Operability of the accumulator ensures that there is a means available to insert the control rods even under the most unfavorable depressurization of the reactors.

Control rod coupling integrity is required to ensure compliance with the analysis of the rod drop accident in the FSAR. The overtravel position feature provides the only positive means of determining that a rod is properly coupled and therefore this check must be performed prior to achieving criticality after each refueling. The subsequent check is performed as a backup to the initial demonstration.

In order to ensure that the control rod patterns can be followed and therefore that other parameters are within their limits, the control rod-position indication system must be OPERABLE.

The control rod housing support restricts the outward movement of a control rod to less than 3 inches in the event of a housing failure.

The amount of rod reactivity which could be added by this small amount of rod withdrawal is less'than a normal withdrawal increment and will not contribute to any damage to the primary coolant system. The support is not required when there is no pressure to act as a driving force to rapidly eject a drive housing.

The required surveillance intervals are adequate to determine that the rods are OPERABLE and not so frequent as to cause excessive wear on the system components.

3/4.1.4 CONTROL R0D PROGRAM CONTROLS Control rod withdrawal and insertion sequences are established to assure that the maximum insequence individual control rod or control rod segments which are withdrawn at any time during the fuel cycle could not be worth enough to cause the peak fuel enthalpy for any postulated control rod-accident to exceed 280 cal /gm. The specified sequences are characterized by homogeneous, scattered patterns of control rod withdrawal. When  !

THERMAL POWER is 2 10?; of RATED THERMAL POWER, there is no possible rod l

worth which, if dropped at the design rate of the velocity limiter, could result in a peak enthalpy of 280 cal /gm. Thus, requiring the RWM to be OPERABLE below 10% of RATED THERMAL POWER and the RSCS to be OPERABLE from 50?; control rod density to 10% of RATED THERMAL POWER provides adequate control.

HATCH - UNIT 2 B 3/4 1-3 Proposed TS/0270q/006-66 t_ . _ _ . _- _ = - - -_ __ - - - __ _ __ _ _ - - _ _ _

W j

l

'3/4.2 POWER DISTRIBUTION LIMITS I

BASES  !

l The specifications of this section assure '. hat the peak cladding ~l temperature following the postulated design basis loss of-coolant accident will not exceed the 2200 F limit specified in the Final Acceptance Criteria (FAC) issued in June 1971 considering the postulated effects of fuel pellet densification. These specifications also assure that fuel design margins are maintained during abnormal transients. f 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE This specification assures that the peak cladding temperature following the postulated design basis loss-of-coolant accident will not exceed the limit specified in 10 CFR 50.46.

The. peak cladding temperature (PCT) fol'owing a postulated loss-of-coolant ,

accident is primarily a function of the average heat generation rate of all '

the rods of a fuel assembly at any axial location and is dependent only secondarily on the rod-to-rod power distribution within an assembly. The peak clad temperature'is calculated assuming an LHGR for the highest powered rod l which is equal to the design LHGR for that fuel type.

The calculational procedure used to establish the APLHGR limits for l l Technical Specification 3/4.2.1 is based on a ' loss-of-coolant accident analysis. The analysis was performed using General Electric (GE) calculational models which are consistent with the requirements of Appendix K to 10 CFR 50. The Loss-of-Coolant Accident (LOCA) analysis was performed utilizing the new improved calculational model, SAFER /GESTR-LOCA.

The analysis demonstrated that loss-of-coolant concerns do not limit the operation of the fuel since margin to the 2200 F limit was demonstrated for all of these

-fuel types (Reference 4). Therefore, the APLHGR limits for the fuel types shown in the CORE OPERATING LIMITS REPORT are based on the fuel thermal-mechanical design criteria.

A flow dependent correction factor is applied to the rated conditions l APLHGR to assure that the 2200 F PCT limit is complied with during a LOCA initiated from less than rated core flow. In addition, other power and flow dependent corrections are applied to the rated conditions APLHGR limit to l assure that the fuel thermal-mechanical design criteria are preserved during abnormal transients initiated from off-rated conditions. For single-loop operation, a multiplicative factor is applied to the rated conditions APLHGR limit for all fuel bundles ihen core power exceeds a specified value. The power and flow-dependent correction factors and the limiting values for APLHGR for each fuel type used in a particular cycle are specified in the CORE OPERATING LIMITS REPORT.

HATCH - UNIT 2 B 3/4 2-1 Proposed TS/02704/006-87

m-------- _ _ . _ _ _ . .

t

\

j 1 I:

l (This page intentionally blank) i i

HATCH - UNIT 2 8 3/4 2-2 Proposed TS/02704/006-89

, q r

l POWER DISTRIBUTION LIMITS

~

BASES 1

3/4.2.2 APRM SETPOINTS This section deleted.

3/4.2.3 MINIMUM CRITICAL POWER RATIO-The required operating limit MCPRs at' steady state operating conditions as specified in' Specification 3.2.3 are derived from the established fuel cladding integrity Safety Limit MCPR of 1.07 for two-loop operation and 1.08 for single-loop operation, and an analysis of abnormal operational trasients (Reference 1). 'For any abnormal operating transient analysis evaluation with l

- the' initial. condition of the reactor being at'the steady state operating limit (specified in the CORE OPERATING LIMITS REPORT), it is required that the  !

resulting MCPR does not decrease below the Safety Limit MCPR at any time during the transient assuming. instrument trip. setting as given in

. Specification 2.2'1. .

To assure that the fuel cladding integrity Safety Limits are not violated l during any anticipated abnormal operational transient, the~ trast limiting transients have been analyzed to determine which results in the largest reduction in CRITICAL POWER RATIO (CPR). The type.of transients evaluated were . loss of flow, increase in pressure and power, positive. reactivity insertion, and coolant temperature decrease.

Details of how evaluations are performed, the methods used,'and how the

' MCPR -limit is adjusted for operation at less than rated power and flow conditions are given in Reference 1 and in the CORE OPERATING LIMITS REPORTS.

l l

HATCH - UNIT 2 B 3/4 2-3 Proposed TS/0270q/006-77

& N.

i I

'j (This page intentionally blank) i 2

I i

I HATCH - UNIT 2 8 3/4 2-4 Proposed TS/0270q/006-89 j l


______m_ __ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ , _ _ _

POWER DISTRIBUTION LIMITS BASES

References:

1. " General Electric Standard Application for Reactor Fuel (Supplement for United States)," NEDE-24011-P-A, 1

i HATCH - UNIT 2 8 3/4 2-6 Proposed TS/02704/006-87 l

3/4.4 REACTOR COOLANT SYSTEM BASES 3/4.4.1.1 RECIRCULATION SYSTEM Operation with a rea. ;olant recirculation loop inoperable is allowed, provided that adjustments to the flow referenced scram and APRM rod block setpoints, MCPR cladding integrity Safety Limit, MCPR Operating Limit, and MAPLHGR limit are made. An evaluation of the performance of the ECCS with single-loop operation has been performed and determined to be acceptable, Reference 1. The adjustments to the APLHGR and the MCPR limits that are required for single-loop operation are provided in the CORE OPERATING LIMITS REPORT. The flow referenced simulated thermal power setpoint for single-loop operation is reduced by the amount of MAW, where m is the flow reference slope for the rod block monitor and AW is the 11rgest difference between two-loop and single-loop effective drive flow when the active loop indicated flow is the same. This adjustment is necessary to preserve the original relationship between the scram trip and actual drive flow.

The possibility of experiencing limit cycle oscillations during single-loop operation is precluded by restricting the core flow to greater than or equal to 45% of rated when core thermal power is greater than the 80%

rod line. This requirement is based on General Electric's recommendations contained in SIL-380, Revision 1, which defines the region where the limit cycle oscillations are more likely to occur.

3/4.4.1.2 JET PUMPS An inoperable jet pump is not, in itself, a sufficient reason to declare a recirculation loop inoperable, but it does present a hazard in case of a design basis loss-of-Coolant Accident by increasing the blowdown area and eliminating the capability of reflooding the core; thus, the requirement for shutdown of the facility with a jet pump inoperable is necessary.

One of the acceptable procedures for jet pump failure surveillance identified in NUREG/CR-3052, Reference 2, was adopted for Hatch Unit 2. The surveillance is performed to verify that neither of the following conditions occur:

(a) The recirculation pump flow / speed ra:'o neviates by more than 5%

from the normal range, or (b) The jet pump loop flow / speed ratio deviates by more than 5% from tne normal range.

^

If either criterion is failed, then the procedure calls for comparing either the individual jet pump flows or the individual jet pump diffuser to lower plenum differential pressures to the criteria of the Limiting Conditions for Operation (LCO). If the LCO is not satisfied and pump speed is less than HATCH - UNIT 2 B 3/4 4-1 Proposed TS/0270q/006-77

ADMINISTRATIVE CONTROLS

e. Type of container, e.g., LSA, type A, type B, large quantity
f. Solidification agent, e.g., cement.

The Radioactive Effluent Release Report shall inciude (on a quarterly basis) unplanned releases from the site to unrestricted areas of radioactive materials in gaseous and liquid effluents that were in excess of I C1, excluding dissolved and entrained gases and tritium for liquid effluents, or those in excess of 150 Ci of noble gases or 0.02 Ci of radiciodines for gaseous releases.

The Radioactive Effluent Release Report shall include any changes to the PROCESS CONTROL PROGRAM and to the OFFSITE DOSE CALCULATION MANUAL made during the reporting period.

MONTHLY OPERATING REPORT 6.9.1.10 Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Director, Office of Management and Program Analysis, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, with a copy to the Regional Of fice of Inspection and Enforcement no later than the 15th of each month following the calendar month covered by the report.

CORE OPERATING LIMITS REPORT 6.9.1.11 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT before each reload cycle or any remaining part of a reload cycle. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC in NEDE-24011-P-A, " General Electric Standard Application for Reactor Fuel," (Applicable Amendment specified in the CORE OPERATING LIMITS REPORT) and in the " Safety Evaluation by the Office of Nuclear Reactor Regulation 1 Supporting Amendments Nos.151 and 89 to Facility Operating Licenses DPR-57 j and NPF-5," dated January 22, 1988. The core operating limits shall be -

determined so that all applicable limits (e.g. , fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met. The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Regional i Administrator and Resident Inspector. l HATCH - UNIT 2 6-14d Proposed TS/0271q/006-86

_ _ _ _ _ _ - - -