Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys
ML20210G297
Person / Time
Site: Hatch  
Issue date: 07/29/1999
From:
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20210G292 List:
References
NUDOCS 9908030051
Download: ML20210G297 (9)


Text

r Edwin I. Hatch Nuclear Plant Request to Revise Technical Specifications:

l Standby Liquid Control Technical Specifications Page Change Instructions Unit i Eiiss Instruction 3.1-21 Replace Unit 2 fagg Instruction 3.1-21 Replace i

1 9908030051 990729 PDR ADOCK 05000321 p

PM HL-5811 E3-1

i-SLC System 3.1.7 3.l REACTIVITY CONTROL SYSTEMS I

3.1.7 Standby Liquid Cont'ol (SLC) System r

LCO 3.1.7 Two SLC subsystems shall be OPERABLE.

)

I

\\

APPLICABILITY:

MODES 1 and 2.

l ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Sodium pentaborate A.1 Restore sodium 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> solution not within pentabori',e solution Region A limits of to withii, Region A M

Figure 3.1.7-1 or limits.

3.1.7-2, but within 10 days from l

the Region B limits, discovery of failure to meet the LC0 B..One SLC subsystem B.1 Restore SLC subsystem 7 days inoperable for reasons to OPERABLE status, other than M

Condition A.

10 days from discovery of i

failure to

{

meet the LC0 C.

Two SLC subsystems C.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable'for reasons subsystem to OPERABLE other than status.

Condition A.

D.

Required Action and D.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

HATCH UNIT 1 3.1-21 SLCS/3.1.7 i

i SLC System' 3.1.7 3'.1'~ REACTIVITY CONTROL SYSTEMS

3.1.7>. Standby Liquid Control.(SLC) System LCO.3.I'7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Sodium pentaborate A.1 Restore sodium 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> solution not within pentaborate solution Region A limits of to within Region A E

Figure 3.1.7-1 or limits.

3.1.7-2, but within 10 days from l

'the Region B limits.

discovery of failure to meet the LC0 B.

One SLC subsystem.

B.1 Restore SLC subsystem 7 days inoperable for reasons to OPERABLE status, other than M-Condition A..

10 days from discovery of' failure to meet the LC0 C.

Two SLC subsystems C.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for reasons subsystem to OPERABLE other than status.

Condition-A'.

D.

Required. Action and D.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated' Completion Time not met.-

-HATCH UNIT 2-3.1-21 SLCS/3.1.7

r-Edwin 1. Hatch Nuclear Plant l

Request to Revise Technical Specifications:

Standby Liquid Control Hand-Marked Pages 11L-5811 E4-1

SLC System 3.1.7 3..'1 REACTIVITY CONTROL SYSTEMS 3.1.7. Standby Liquid Control (SLC) System LCO 3.1.7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY:

MODES I and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Sodium pentaborate A.1 Restore sodium 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> solution not within pentaborate. solution Region A limits of to within Region A ANj}

N Figure 3.1.7-1 or limits.

3.1.7-2, but 1;r:Wr 10 days from g,%h

-een the Region B discovery of limits.

failure to meet the LCO

- t B.

One SLC subsystem B.1 Restore SLC subsystem 7 days inoperable for reasons to OPERABLE status, other than 8NQ Condition A.

10 days from discovery of failure to meet the LCO C.

Two SLC subsystems C.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for reasons subsystem to OPERABLE other-than status.

Condition A.

I D.

Required Action and D.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

4 HATCH UNIT 1 3.1-21

'...ne..nt.t. ! ?5_

SLc5

SLC System 3.1.7 3.1. REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1.7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Sodium pentaborate A.1 Restore sodium 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> solution not within pentaborate solution Region A limits of to within Region A ANQ Figure 3.1.7-1 or limits.

3.1.7-2, but gr::t:r co - 4tc, g dbben the Region B 10 days from

limits, discovery of failure to meet the LC0 B.

One SLC subsystem B.1 Restore SLC subsystem 7 days inoperable for reasons to OPERABLE status, other than Condition A.

AND 10 days from discovery of failure to meet the LC0 C.

Two SLC subsystems C.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for reasons subsystem to OPERABLE other than status.

Condition A.

D.

Required Action and D.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion

. Time not met.

HATCH UNIT 2 3.1-21 Amendment No. 135

r..

Attachment 1

Sodium Pentaborate Concentration Technical Specifications Figures 3.1.7-1 and 3.1.7-2 Provided for information only.

No changes are proposed to these figures.

i

)

i

SLC System 3.1.7 (1681 gal,13%)

13

~.p

  1. g@gek@c y-

., : e.,

e w

y m m<

/,1 $.o7 En $$m!b.c%D18%T

$,,mk L

P8

?:-w&

A e.

nye wu nn s

Q; ; %Q gyj Qe X..

?g f:Q PR Mf; T,Q.

g

@R.oA M@e.

ML w@%

utm@*

.ww m 4

@biatwe a

if m$e Ed R 6 ny$ 4h:f' u:Ep3 Rt;.- M:

w m-34

&m&? &W ur n NW s+ m ve s:

NM W6 ME pM iM 12

%. w.+ eM m2

.wwgq::

.>.a m

,s w

>w>..v:hn y wp.n:rpmg s

a m

my w e.

n hi?g mlW:e hje% Wi MSW 0;$$. NWO QNi m

>@ce..

L k

er w

es

& C- -

w. a. ~.

vm e^g..: -av. pp-do en w

c..~y M $v,u.,%

M4 M 8$' iM$$ f$$ kiMI y<en

nT 4

h.;4..

pw

.m wy n

8:.

v~

w.

7 Mt?$ Wes ME nsi W^' ^ %%$ M 11 wa #m

, w r<.

ga sw aa.y w-w r -

n Ac wu

+, c;.

A.+ u s.,>

w w i m:

O b:6 no!'

j

@b Si Region A y

3

  1. l Permissible Region of Continuous Operation y o

% i&h yks sw w QF a4 m% @,

ASt n

u)

- mi gs: Mrs -

%t e Je s; w w

.E 10 m.

w

w. : w. g

%m,*,@%E.

rg$y. y, sAs.,.s em e4 a w-s e e.? 'In,k qn mu y :

=

di

$tM[

% 41 1f

%w/

4

$d7 WW pfM., 4Ah W5+. 9 54 y

A E. $em M6 S!fW.

n a

,* p m.

+ m o i ij k Ib l~& ('I n

Edh.

[

kh y :k h&,

g w

=E sf &

x

~% yj;v %L n.

r ':

W

%w %-; V;n WW %24

&e

&& w

%u

- n. 9 v

ww M

~

e*E y

ww

,as.c s
e 42 g.:m set E

Mm f.52E 6Ee i w.

Mtk WM W.; g# f$ a

@s.s;,'

d - e ee@..

~v zgm 7

N saw n!al 3;w m
w 8(g?tT,;T m

.syw ~ OA W@. - CiF y

o GE M4FW; M &$E MP NfR

@g@h ti W

wy T

qJ pn f

W pg p ?!#% W

$4&9 Wi^r ant @!W*

w

w.. pp.

ngnw ek n Mm v~n o

e

+

y m::u ai w w; e

. m m

<~

e" O

Q.

.. us n&:.w'.:w'.vf:Q.gr, p;.q y k

M'.;;

.%n'l y&d Tu}$f.

yf4

,.:4 m-i y

ww w en g:.e<-

%g!. e -

%m,

%g.,.% qy

'Osw g CR ns +. wwy.- ew x

n h%yn N g m:

-gn VW Wsw:g. hi.C &qp '

W h.. r Q:-

%w. Cyx me w w 4.%

gj w; e wa.;:a.

w s.e.sy;,,Ge@c, h

m.;;.

r ana f.

~4 I6.7 -;VJTOEfj RR MN-Th

w
:

agy

$$h.

7 C ^

~~

~

'"'^

~

(3800 gal,6.9%)

(205 gal, 6.9%)

7 y

//

AA

' Region B '

//////b l

'l

/

(3400 9a1,n%)

/

5 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 Gross Volume of Salution in Tank (gal)

Figure 3.1.7-1 (page 1 of 1)

Sodium Pentaborate Sclution Volume Versus Concentration Requirements i

HATCH Ori1T 2 3.1-25 Amendment No. 135

r i

SLC System 3.1.7 p(5%,120*F) 120 enq;eg a p p y g g gy yppyg; q wy +

$rf5A$ H.. Midh@ YndMS&sn M.:s:2ei, -

19. s.;+ pew pytu.rtw:gz. n~nnww

%:nn k:

7

, s,..a.w > gy m

v. rm-a u

9~ 7:q,. M;.s.s;w;gyg[e g$ gyp;.95%a@ $$$D76 k ~;n.~ 2 8(25%,114'F) 5 Sis $IEA.

I3* NdA$@

2 h

110 w

IM Region A 6.9%

IM Permissible Region of Continuous Operation I;&

N M."g#s;4%:,, - -

,;s i g.g..

"n> Nn%d.:w.-

v

71Py&?;wAf:yb l['A-W:.! m@;;y' :

. A r

\\

y >dd:.g^ h 7.4.:.d e +

n. 2

':,.W.

' y -?

i

. e r.. y:wg* - -

e' 100 6

Ih;;$ D$< :{!.[ INY #2 d jdk.;y a--

1

,d${khsfM4/.~

(.,

w;;6.;:

n.

1 M (g'w,c. 20.y ::%

w-zv s,. ^ ;, uEM'ah,;;n w:c.y: U.

g?.g%. s.3y A <v' ';f;>>y f*

g

- m w.:

x -
.

v a

50 l u g

.s..

.. 4 i; o,y(.N7

~- ?$gff.53;.

!::W;>;.N::p$Ni Yh.4-$$$'5 ON.?f::

-$s yWii ? k:9 Et

.:s;,-

P 'O;fd;b'$b.w.y M%

O

?, SY:

&M ;.K k

I %%Mt?l. &Mk%uw

  • a a"9 x"

90 yy,,-.. m m

. c m.

s I

(

+

% l' $h!

'?? /

r k-(6 i

h'nW [w

'5 e

g

%'% p;g.4,t.

f fast 9'e f M' S'%?'h?AY

u," Y$o &{g ?

a.4 %

^2^

W 4 w:..lp

\\

TM

%g Mb#%

  1. 92c?".flCGLW
  1. w w-

_w N '. 7.?*"Cf:b.g' h7.s4w-

=

M. G'X

.4

F rl.v MV.w %&re ( i: i l

g

-T;f6 k.

l r..p^t,s %ew&N.)M:.?i.k? *M:#,. -

kivf*

Mg#fP%)SfiWc6.ivWf N ";e.g.e ~-

W h

?.5i??S g

i 1 h!;MWQ%WQQWh,$

2c;:QUfK 2 5%Qum[j

%i l%L%%

??.

  • ?it.. e sw+m w::e am Cr%;;T lDME'Nf~ 7NI'MMKI#

iil ssM@[PMs ~tf

%db

%m%

hn/M*fSC' W W'AQ?

l ;W#id & & [?;'

\\N h kl$g$h?

./g T ju; 4.; jd

4.

b5l.%:$'^

60 g?b5N$pg kf

.g.

p.,

l '-

N,

( b@%.> [.4.,M 9

w. g (n.mQN.D"ji.

7#:.%Q 4?;

-s 5

N m*4:.W

~ m

cp 1 W@

[M.Il@s

[ et (8J5%,40*F) 40 k(6.9%,4C*F) 30 0

5 10 15 20 25 Concentration (Weight Percent Sodium Pentaborate in Solution)

Figure 3.1.7-2 (page 1 of 1)

Sodium Pentaborate Solution Temperature Versus Concentration Requirements HATCH UNIT 2 3.1-26 Amendment No. 135 i