Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20155C0701998-10-23023 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Converting to ITS ML20154A4001998-09-25025 September 1998 Proposed Tech Specs Pages Re Sections 3.4 & 5.0 on RCS & Administrative Controls ML20249C4221998-06-25025 June 1998 Proposed Tech Specs Pages Re 980522 RAI on LAR 97-09 for Section 3.6 Conversion to Improved TS ML20217P5921998-05-0101 May 1998 Proposed Tech Specs,Eliminating Requirement for Operations Manager to Hold SRO License ML20216G5961998-04-15015 April 1998 Proposed Tech Specs,Changing Surveillance Frequency from at Least Once Every 18 Months to at Least Once Per Refueling Interval ML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML16342A1671993-07-0707 July 1993 Proposed TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents. ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20044D8061993-05-0707 May 1993 Proposed TS 3/4.3.3.5, Remote Shutdown Instrumentation. ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20058E7741990-10-18018 October 1990 Proposed Tech Specs Revising Section 3/4.2.4, Quandrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20012C5981990-03-14014 March 1990 Cycle 4 Startup Rept. W/900314 Ltr ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237K6951987-08-14014 August 1987 Revised Procedure 8833XR-1, Diablo Canyon Rupture Restraint General Repair Procedure. Related Info Encl ML20237L2481987-08-14014 August 1987 Spec 8833XR-001 Re Procedure for Preparing,Testing & Repair of 10% of All Full Penetration Welds Installed Per Spec 8833XR.Related Info Encl.W/Copyrighted Matl ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20211A2651986-10-0606 October 1986 Proposed Tech Specs,Revising Reporting Requirements Per 10CFR50.72 & 50.73 & Correcting Typos ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20155B1031986-03-31031 March 1986 Nonproprietary Natural Circulation,Boron Mixing & Cooldown Test,Final Post-Test Rept ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-174, Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 19851985-04-29029 April 1985 Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 1985 DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown 1998-09-25
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237K6951987-08-14014 August 1987 Revised Procedure 8833XR-1, Diablo Canyon Rupture Restraint General Repair Procedure. Related Info Encl ML20237L2481987-08-14014 August 1987 Spec 8833XR-001 Re Procedure for Preparing,Testing & Repair of 10% of All Full Penetration Welds Installed Per Spec 8833XR.Related Info Encl.W/Copyrighted Matl ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20132E8441985-04-0101 April 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.1 Re Activation of Corporate Emergency Response Organization Emergency Radio Pager Instructions ML20116C1381985-03-26026 March 1985 Public Version of Updates to Sops,Vol III of San Luis Obispo County Nuclear Power Plant Emergency Response Plan, Including Rev to SOP III.10, Dept of General Svcs. W/850419 Release Memo DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo1985-03-14014 March 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo DCL-85-196, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence1985-02-25025 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence ML20125A6531985-02-0404 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations ML20209J1691985-01-31031 January 1985 Public Version of Revised Emergency Response Plan Sops, Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence ML20215B2591984-11-0101 November 1984 Rev 4 to QC Procedure DCP-2, Silicone Room Installation. Partially Withheld Related Info Encl ML20101J2191984-10-31031 October 1984 Public Version of Revised SOPs for San Luis Obispo County Nuclear Power Plant Emergency Response plan.W/841219 Release Memo ML20100K1371984-10-30030 October 1984 Pg&E,Diablo Canyon Power Plant,1984 Emergency Preparedness Field Exercise DCL-84-336, Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence1984-10-25025 October 1984 Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence DCL-84-330, Rev 3 to, Repair/Replacement Program1984-10-19019 October 1984 Rev 3 to, Repair/Replacement Program ML20101B0721984-10-15015 October 1984 Public Version of Revised Emergency Plan Implementing Procedures,Including 1.1 Re Corporate Emergency response,3.2 Re Corporate Communications dept,4.1 Re Matls & 4.9 Re Qa. W/Jm Felton 841213 Memo 1996-10-11
[Table view] |
Text
.
C.:r,t I 5,I d
,.I
'I T S i I! 'J. K E f. t. 0 :i c C C '! P A !! Y ' ' ^
I
. 4......... r u u w e. v ;oaNaArco Sheet 1 of 4 lalP1*.C rADHICATIo%
w i lt.1 A u s r o R T. PA.
177c0 pg(l7g g,.,3 3 ((g7,y( (Q,
,. ?
l'
[
, 4EsOVb) EObpe{. No. P3-03 CT.'J/-FS-5::.'A'-6C
,1 I
('F "a "i h u b s. M., Da t f :
9/2'2/71 Stim w Ji v
i
.. C0!.'!!UI."G D~2NII.'.'.Ci("Ievi Date-
I j
l C'l/[Ul!
CAIE(0ltll7(*
i
'.71,T L E: Sl' EDIFICATION FOR WELDING OF Austenitic Stainleos Steel' l
l SCO PM: Thi3* specification covers preparation, welding, wcld finish, inspection I
and heat t reatrnent oft Stainless. steel pipe, n12:eles, socket fittings.
l fi11e: s, et c.
\\
I',AS!: M ETA L: ADIE Section IX - PS Base Maicrial t
g.
3 Fri.!.MR.Q RTA !.: A*JS A 5.9 - ER308-- A'45 A 5.4 - E 308 Ferrit e Control' Per customer
~
.s p e c i f i c a t ion. 4, St'B AltC FLdX:
(
None II 4
p; t
INSM!tT MMTAL: None n f*:
Y k
- c. e, t..J % A i t V' 5
.m
,T,i]'G.g#degNhT Th Qht) fi&-k V W h oriaLed TuliCl N
sAS Shall be Argon, 20 CFH, Purity' 99.9957. Minimum.
l
. e.
BACKING:
Argon r,as purge per chart K IC3P to have oxygen content below 0.57 prior LO Uc l d I D 7,.
f POSITION:
Welding shall be done.in the fixed ang,ular position (6C).
l.
s P:t OC ESS:
The wehling shall be'donc by the CTAW &.S Md.
l'
?:t**tRl:NT: The cu rrent used shall be shown on Sheet.43.
I
.I
_l'!Wi.lM.\\ TING AN D INT El(PASS TEM P. : 60 F. minimu a int e rpass comp. 300F. ru.s tmu.a.
l'O:iT !! MAT-T TGATM ENT: h'on c i
l
- Sc1then ustne, thic procedure for fillet welds,backing purge may be omitted bd-7f fee ap,xe ul i
1 t
B708200191 870814 ~
i PDR FOIA DEVINE84-743 PDR
i foop t,f O 3
. ~.
s.
T HE ' g. r., K E LL O C G C O M P A N Y Sh'ect 2 of 4 j
q
......... et,s.t w. :.ec o m it t, l
{
s i r t '.6 6' 4 '. 6 4 ' A s i 0 8 i
. Spec. No. r8.or..cm-r5-s tc-6c g.,g avscony, es, 3770t Date:
9/29/71 Rev, Date: w a is n.>
!.;..u e..'.l t.a..l. l.'.re na ra t ion:.The edgea or rurfaces of the parts to.,bc joined by wn*1 ding
)
t hr,1 1,e ;.repa red hv flame cutting, plasma arc, grin < ling, machining or any combin.
.ignm et methuds to form the geometry of the weld shown on Sheet # 3.
Surfaces for j
.0.:i..ng shall !>e etc.s n anel f roc from paint, scale, rust or othei foreign materials
.j
!.St s rc dett ism iital to quality welding. (Tlame cutting does not apply for S.S.)
C: vin.in :: 1 All stav or ih:x remiaining on any bead of weld metal or on adjacent base mete.i uhail b.
retni,ved before depositing the next sucec8sive bund.
i wr:r:.ne Techmque: Welding technique shall substantially be performed as shown on
[
be.ev s u.s.
4
~'
I'n l..r_s i.l.
G rmve Prcpa r;.tton:
_ All defects in welds requiring re;N[alts,s.ha)1 ire r'er rin in'
- arc, Dofects:
fla m 4 '
dTfg.?,. epair' wsib 'is M be" nYllshdl.toa
~
enipp:E', couging, at(og sham t%c same as for the ori-j an[ t t pt!' i l(
cptslined fv.
s dMe., i t apply for S.S.)
piin t we nt ( l emo e
j.
Enuinment: The.machinc souree of cur rent shall have a good regulation over the ent i r. r.' nge ni eur re nt r ecpii red. For GTAW a remote foot control shall be used to,i it.ittst.: his;h f requency, a re > tarting, current decay, to eluninate crate r in<lications.
- 4. c,.re! :
Itecorih. shall Iru kept of weld.ers, ' operators qualifications dates, proce-l i.
eh.r.;i.. lifications date r, ' 8vmbola and all pertinent information as to proces s and -
rin!.
,rt.pmc ina p.:etion.
i 8
Ams...rn ne e ot' Weleh ne B..a<la:
Each welding bead shall show complete fusion to
..... c. n t w elsi e'c;a.Ait anel to base metal. The finished surface o( the wuld shall rge arm,othly into the component surfac.c.
l e.
l,r.,.m t,. 3: Int.pection hall c uiform to applicable job code.
- i. :....t ro b Co n ro t i.n: All 1.m hydroecn electrodes and thtx shall be kept in a dry rod e.. en cit i. npe r.ititre s recononentied by electrode manu facture rs to minimize mot >ture d....-;.in.
... _...S....,.i..e n..
The re., hall be a minimum amount of.inte rruptions du ring wehl-
. '. - r.as hn. vi.h h o f a we ld !.wt i.ha l l 'e. hree t ime s the electroite core it eiei i.h
. '. s i *" t
. 8 5 ( ruic h h O[ OG\\ IOVVT hhall 1/6".
't
CoOG I L(O i
1
~.
L'-'
T.iiE.U. 'J., K I L L O C C C O M P A X Y 8
......... evu.vas escuaroaarco Sheet 3 of 4 ll
,.}
. p g P N G : F A b fi l C A T I O N -
'WILLIAW5 PORT, PA. 17706 l:
Spec.* No. P8 08-CrNJ-F,-S"A.!-6C i
~
J Date:
9/29/7i Rev. Date:
+
t l
1 t
" CR OVE DETAILS. WELDING TECliNIQUES s.
i i
..:.y 3 r (-
c i
g
.M e
g b
f 7, +.
i'l 1*
O*' a-t l - 6+
i 1
f T
-- 4s*y, e
h y*
{
e T-2 i
.g I..[6
~ '
i
- A
+-
g i
y put.s ljt Bu1* N0*f
\\
.. u n r w?e ar s A ~
ii
'C o M T h W f. Y, $- Q'1 9 vtpos K n t.
, g. r. p-r.s
'3 Q
[$
9 $ f.'s (
$3
\\.\\ h. : y h l
f-f '
"'I t
g\\'N{(9.i[IL f
h I:
in f
'Faar s-j g.
o g.
j I
A s wts oro A T1/A W a***
non perix W J'L D /Mo i !b s s No.
Filler Filler Torch Tiiin.: s t e n l,'#rCCC85 L
Metal Metal AM Ps Volts Polarity
, Cas
' Size &
i S t e.c Type Flo-ra t e l'o la rit v I
e.
,sr m a
),'.,-
,,.a.,
i
.: - *j:, /.l ' M.s i t I/tr.-3/n yrt 309 go-130 1 1 1 - ! !.
Si ra ic.ht 20's Pil lStra1.;ht i
I s ' ::'...' 2 5 h/32-1/8 l E 308 70-110 l21-23 l Reverse l
l l
l' l
l l
l l
l l
I I
l l
l f.,._.
I 13y: j,.e./ '
s.. I..... :,*,
O
Title:
Wei<ii nu ' n u. n. c r
(*0 0 6 140 s,'-
I ShCCC 4 of 4 f, :.E *d. '.J. /. E L L O G G C G:! P A N Y l
f;
.......... imus i s o n e e s sin a 3
, tipsiec FAcatcATsom HECHANICAL TESTlWG LABORATORY PROCEDURE DOCUMENTATION REPORT
\\
o 9/29/7t t
~
Specification No..P8*0B..CT AW-F.5-SM>s*J-6G p..,
i '
Manua I CTNi 6 SMKJ M u l es m chine reldias Peocese
_ ],,, s.
we ri.: spe'<lticasio. A312-7304,. A312-1304.tp.s.,
8
,,p.y, TMcLeess (if pipe. dismeses and mall skicksie..:
2"_x_._I 54" Mi n.
Thickakes R4 age shas sese qualifien 1/16, M/W thru 3" dia,_pj,g e, ma,ty, jp,,,g,c_,y ej d e d,,,,,
e
' fillev Mesal Geowc No. Fa. 7..$ I_5 l
1 Teld W1al Analysis No.' A.
7
=
E'LL ICD.CD: SCCTICN TENSit.E TEST (r tcs.o e A.so cN.4) Q 6 (d)
Sub Size as wttoco Specimens j
uc.
vitto esist-l i t ee s i t t sintic,t..{ g ct oso !
)
[
, g,g 3, o g "f""5 tWu,i t ;
N l.",' " J.W, ; '," h. c., c. r. i.!
~
i c.i.e s 3i..
[5)_-1 l d23 x.473
.0582 2.230 1 38.300 4.630 79.600l 48
! 14roke In Weld 1
.0577 p,430 { 42,100l 4,490 i77,800l 48 l Broke in Wcld
[55-2].122 x.473 l
i
.i SUB SIZE AS. WELDED SPECIMEh*S l'
I scc.
vitto ros%T ivrssitt statsotulf. ctoss
)
MW8d h
,ma o m ssions AA[A j.,..
..c.,s.s,,s.. u,, g,, g. i g, g -} g
,,g,.
m
<,.,.u
_m 2n !aseMetti Q;V&ielL3)ia$Itictil '
l 155-3
.i25 x 468
.0585 12.490 n42.600 4.690 53 42 M.200 80 i
[ h5 4 I.123 x 472 l.0580D.380 (41.000. 4,SJW 56 Gqopf h
/(
.t. c
.. o i.3)Q-8.2 Sub Size 55-5l It%[ULOh
$P't M \\./ I '
~55-8 l Sent 180 Passed I 'ssed l 55-9 l Bent 180 Passed bi BMIM k 0
Pa i
! 55-7i r,AtIT00 Passed i 55-101 Bony 1800 Pa's s e d i
! ', I I
l l
l i
~
IMPACT BARS BROKLt. AT (Not Required)
CH 9PY F-.
T PE #k0 TYPE As0 RESULT 8CSULT s,
i eIOvat NO.
Fic4RE
'4 0.
I y
I i
i l
j j
t I
t i
j II. Snook
_, cioc k so; 75 si.., s..,
KH s etJe,'s s,,
u, t,, i,....,, s e,e, c.. -e,... c u e, m.,_...,, e s.i.e e n,.
ML 71-55 t
Tesi rvaJn ac t by.....O l.'O.$#[._.
1.alasaaoey-Teee No.
1 pe e
% e i rruly shat she teetrmens t an ehe t ecco J ere curses s and shes the te s t welJ a weer pserarcJ. melded and i
icised si as cvs.lanc e sith the segestemens e al Setiive IX of the AWF Lw.lc.
i v.1 a v l
Signed.
'the M. W.,Kello;; Co.
iv..s.,.....
nr,.c.a :end.>/,. -v:., s. w w J
/)
f
.9 s
t'
A Division of Pullman Incorporated Waid Procedure Cede No. 88/83
~
i l
. Piping Fabrication Spse. No #1 F4-SMAV-2G r, SG I-11111amsport, Pennsylvania 17701 Date See Pace l' o
EACKINC CAS PURCE This procedure is te be followed to assure that the oxygen content has been reduced to
- ; a desired decree of inertness (1% oxye.,en or less).
(1) Oxygen content of backing gas purge may be checked by any acceptable type of oxygen analyzer.
r l :
(2) In lieu of an oxygen analyzer the following chart may be used:
1,.
e l:
, 36 y
34
,r 1
/
32 j
/
j 30 f
f
. i'
/
/
28 f
A j
l
}/
GGf
\\
l-26 gr y,y
)
it/'
\\/
24 7
/
i/
/
n h i l
, g 22 7
7
,.n n m g \\ g y i lwE
/
-.4 n R 3 Ih I
l W b
-~
g 20 f_
gggJ q g ( y q,wg[
T V
id NMJ Mu iU 1 1 II I
!d 18 l
i At i L j lA /t u i'
-f g
Purge times were derived by testing w
g y
g; w iD 16 full size test specimens with daes spaced I
,e I g
't i
12" apart using Argon, with a 1/8" Bleed l
[I I l
/II II y4 Hole and a Beckman Oxygen Analyzer. Time
/ l li/l l I I I recorded is that required to reduce 0 2
12.750
/
I l /l l l l
!I level belou 0.5% on the 02 analyzer.
i V
l/
I I l
l 1
'10.750
/l V!
ll l l Where distance between daes exceeds c
jg Al l l,
l l 12". times shall be increased proportion-8.623 3i / iLiii ately.
/
F#11I I
I l
6.625 A IO l I I II I
~
i 5.569
/ l/l*
I I
4.500.__/ /
I I
I 3.500
'i '
i l
l l
l l l
l l
l I
l O
10 20 30 40 50 60 70 PURGE TIME - MINUTES By:
E. F. C T.0!!T N T4 tie:
Utitla "-
f