Rev 0 to Quality Procedure QP-5422-1, Diablo Canyon Nuclear Power Plant Spec 5422,Quality Procedure for Procurement. Related Info EnclML20237K592 |
Person / Time |
---|
Site: |
Diablo Canyon |
---|
Issue date: |
09/21/1979 |
---|
From: |
HOWARD P. FOLEY CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20237K209 |
List: |
---|
References |
---|
FOIA-84-743 QP-5422-1, NUDOCS 8708190326 |
Download: ML20237K592 (21) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20155C0701998-10-23023 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Converting to ITS ML20154A4001998-09-25025 September 1998 Proposed Tech Specs Pages Re Sections 3.4 & 5.0 on RCS & Administrative Controls ML20249C4221998-06-25025 June 1998 Proposed Tech Specs Pages Re 980522 RAI on LAR 97-09 for Section 3.6 Conversion to Improved TS ML20217P5921998-05-0101 May 1998 Proposed Tech Specs,Eliminating Requirement for Operations Manager to Hold SRO License ML20216G5961998-04-15015 April 1998 Proposed Tech Specs,Changing Surveillance Frequency from at Least Once Every 18 Months to at Least Once Per Refueling Interval ML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML16342A1671993-07-0707 July 1993 Proposed TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents. ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20044D8061993-05-0707 May 1993 Proposed TS 3/4.3.3.5, Remote Shutdown Instrumentation. ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20058E7741990-10-18018 October 1990 Proposed Tech Specs Revising Section 3/4.2.4, Quandrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20012C5981990-03-14014 March 1990 Cycle 4 Startup Rept. W/900314 Ltr ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237K6951987-08-14014 August 1987 Revised Procedure 8833XR-1, Diablo Canyon Rupture Restraint General Repair Procedure. Related Info Encl ML20237L2481987-08-14014 August 1987 Spec 8833XR-001 Re Procedure for Preparing,Testing & Repair of 10% of All Full Penetration Welds Installed Per Spec 8833XR.Related Info Encl.W/Copyrighted Matl ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20211A2651986-10-0606 October 1986 Proposed Tech Specs,Revising Reporting Requirements Per 10CFR50.72 & 50.73 & Correcting Typos ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20155B1031986-03-31031 March 1986 Nonproprietary Natural Circulation,Boron Mixing & Cooldown Test,Final Post-Test Rept ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-174, Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 19851985-04-29029 April 1985 Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 1985 DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown 1998-09-25
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237K6951987-08-14014 August 1987 Revised Procedure 8833XR-1, Diablo Canyon Rupture Restraint General Repair Procedure. Related Info Encl ML20237L2481987-08-14014 August 1987 Spec 8833XR-001 Re Procedure for Preparing,Testing & Repair of 10% of All Full Penetration Welds Installed Per Spec 8833XR.Related Info Encl.W/Copyrighted Matl ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20132E8441985-04-0101 April 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.1 Re Activation of Corporate Emergency Response Organization Emergency Radio Pager Instructions ML20116C1381985-03-26026 March 1985 Public Version of Updates to Sops,Vol III of San Luis Obispo County Nuclear Power Plant Emergency Response Plan, Including Rev to SOP III.10, Dept of General Svcs. W/850419 Release Memo DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo1985-03-14014 March 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo DCL-85-196, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence1985-02-25025 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence ML20125A6531985-02-0404 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations ML20209J1691985-01-31031 January 1985 Public Version of Revised Emergency Response Plan Sops, Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence ML20215B2591984-11-0101 November 1984 Rev 4 to QC Procedure DCP-2, Silicone Room Installation. Partially Withheld Related Info Encl ML20101J2191984-10-31031 October 1984 Public Version of Revised SOPs for San Luis Obispo County Nuclear Power Plant Emergency Response plan.W/841219 Release Memo ML20100K1371984-10-30030 October 1984 Pg&E,Diablo Canyon Power Plant,1984 Emergency Preparedness Field Exercise DCL-84-336, Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence1984-10-25025 October 1984 Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence DCL-84-330, Rev 3 to, Repair/Replacement Program1984-10-19019 October 1984 Rev 3 to, Repair/Replacement Program ML20101B0721984-10-15015 October 1984 Public Version of Revised Emergency Plan Implementing Procedures,Including 1.1 Re Corporate Emergency response,3.2 Re Corporate Communications dept,4.1 Re Matls & 4.9 Re Qa. W/Jm Felton 841213 Memo 1996-10-11
[Table view] |
Text
- - _ -
s
. x.;
n..
QP-5422-1 3
I l
h*
_ O s
g-M,M Y DATE: 10-9-79 REV.
-y VOID DIABLO CANYON NUCLEAR POWER PLANT SPECIFICATION 5422 l
l QUALITY PROCEDURE FOR f
PROCUREMENT b
APPROVf.D FOR CONSTRUCTION i
THE l
HOWARD P. FOLEY PRODUCTION SUPERVISOR l
f f C O f,'. P/.f J Y NN l
" ' ffATE [
- r. c L 'n n;"
REVIEC.
,rar-ti A Avu et :,4 cat.r.
l I
9:c c.:.w:n2 QUALITY MANAGUR P apfp APPRO\\E mo
~
D.fE j
f
~/
on4..:
I Aut n.w atsa.m w,^
PROJECT MANAGMR onwent enav.>.o j
oA.usTcus APPROVE C
/C-9 e/ 7 i
c s :Ac o w.:.s r
HA AR.$f:JSO PC'*\\'iYLV A". A DATE 1
HOV5?ON. TE rf.S
)
tes tsants cAurenu vAnn.cz c4uronw THE HOWARD P. FOLEY COMPANY Mf.VPM $ TE*.NES$[E NE s' C SLI ANS LCM 51AN A
^" W *5
"tE7 putt.OCtrD' A P[f >NSvLg Agi A CA
" 85 t o $.. r t ' a. a PF0E ti' A, ACb2Of. A PiriS6VP3" PENNSvivAr.:A C sistj*?t to Not a t.* 6 s 'A. =
ruCwv3'.D vma s A g,,,,
acy,,,,,
m.1 L A
F"*
U "C' "**'"*a f
- f,.# A F A CPC A Tucs
- s A.t.o.:
8708190326 870814 C ru
.sa a.c e-s..
- !" NGTON o c PDR FOIA d m.co ro, 7 oi,,
Asc> onAGE.AtAt*'^
DEVINEB4-743 PDR LA-
,,,, f t, r r,
.mn
.......,A...
com.,seeu
,,, ggf.g -
- !',.f j ;j l r
c:v: ac. Amu,
>y.
t '
jrl
~~~
l l' '
Faura casatu.m a e.u.
w,...,
Tile HOWARD P. FOLEY COMPANY l
QUALITY PROCEDURE CHANGE NOTICE h.ProcedureNumber 0p-5422-1,
PCN Number 1
Revision Number 0
Effective Date 11-1-79 PAGE PARAGRAPH PAGE PARAGRAP 3-4.5.2..... rewritten per P.G.
(x E Quality Assurance Depart-ment direction.
ATTACHMENT A..... deleted i
O. n!30 b h
D REVIEW:
CUSTOMER APPROVAL:
fe 4AAF#9
., _m.s.mm e, PRODUCT 1gN SUPERVISOR DATE C *sc m a n to sa r <=*
m APPP.0 VAL:
{,5,t i a i e.:tc m si :.a -
c ar....
- 3. ~,,c: ame A/)M
/d f)/p
[
F.,f aish R c p N d.i
___QDALTf'CJ1ANAGER
'DATE ceder..o w l
g, g,$/.7Q' I'ROJECT MANAGEk -
DATE-es ca" ##M
_._ _z en:nt,c sas e, nu:n,: c a.
Tile HOWARD P. FOLEY CO. APPROVAL i
StrMCtdOn file of this change notice shall be maintained in the QC Files.
l
/w r tr n( (ii F, S)e L
\\
0 '6 f.
liPF/PCN
__________________________Q
,(})
1.
SCOPE 6
This procedure establishes the methods and requirements for initiation, control and review of all procurement documents.
The review shall assure the applicable requirements, specifications, standards and codes,which j
are necessary to assure adequate quality have been QP-5422-1 included or referenced in the procurement documents.
REV. 0 2.
REFERENCES I
Part 21 of Title 10 of the Code of Federal Regulations-(10CFR21')
1 ANSI N45.2.13-1976 " Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants" Pacific Gas and Electric Company Specifications as applicable The Howard P. Foley Co.npany Quality Assurance Manual 3.
RESPONSIBILITIES 3.1 The Project Manager has the responsibility for employing all measures necessary to accomplish the e.
work in accordance with the contract documents and i
this procedure, rfaur 3.2 The Production Supervisor shall be responsible
_# }
Sm3r for assuring specified technical design requirement.s l
7_;
have been' furnished to the Purchasing Department for inclusion on procurement documents.
THE HOWARD P. FOLEY 3.3 The Quality Manager shall be responsible for COMPANY providing review of procurement documents to assure applicable requirements for certification, test reports, analysis, qualification, identification markings and traceability have been included.
3.4 The Purchasing Agent shall be responsible for the technical and administrative direction of purchasing to provide an interface between the Howard 4
P. Foley Company and the suppliers of equipment, component's, materials and services purchased for this contract and to maintain historical and current records of items purchased.
1 r( $" N'~ i U !i%
U 2,;i u ;l k
- !s m
n -s
= -
i lf 5Y 4.-
METHOD
~
4.1 Material or services requested by the Production Field crews shall be made on the Field Requisition Form.
This form shall be sent to the warehouse Cor processing.
QP-5422-l' 4.2 The Material Requisition Form shall'be gene ated
~
REV. O by the responsible warehouseman from.the Field Requisi-tion Form when items are not in stock.
4.3 The responsible Production Supervisor or hiy designee shall research the Material Requisition. Form and furnish technical. design, specification, quality and cost accounting requirements on the requisirton form as necessary.
i 4.3.1 When this review has been completed, the i
responsible Production Supervisor or his denignee
~
shall sign and date the Material Requisition Form on the appropriate space.
i i
4.3.2 Material or services may be requeste,l by the responsible Production Supervisor or hi4 l
designee on a Material Requisition Form in lieu of the Field Requisition Form.
IBI 4.4 Quality Engineering shall review the Materi.11 Re-quisition Form to verify and furnish, as necessary, the requirements for Quality related items.
5555
"* "F'1
~
db 1 4.4.l' T7 hen verified correct, the Material Requisi-h-* ' 'd tion Form shall be initialed and dated by :he responsible Quality Engineer.
THE HOWARD P. FOLEY 4.5 After Quality Review, the Purchasing Agent 4 hall COMPANY process the Material Requisition and initiate a serialized Purchase Order. (Exhibit 1)
The Purchase Order shall include, but not be limited to the f ollowing,-
a)
Purchase Order Number b)
Item numbers c)
Technical design requirements 1
i d)
Any special process requirements shall he clearly defined e)
Any inspection test requirements shall be clearly defined lh f)
Legible, understandable and complete deucrip-tions of equipment, components, materials or services El'
%.* Ip$ N *
~ 1
Q fl[I O
y U h)
- 4. 5.1.
Each purchase of quality related items l
shall have the applicable Procurement Quality Notes-
- d, >
(Exhibit 2) typed onto the Purchase Order as deemed'
~
necessary.
i L
4.5.2 Each Purchase Order for design Class I items I
(as specified by Pacific Gas'and Electric Company)
PCN-1 shall specify if the supplier is subject to the provisions ot Title 10, Code of Federal Regulations, Part 21.
The supplier shall be exempt from this QP-5422-1 provision if items are ordered from the supplier
.REV. O on the basis of tia suppliel's specifications or catalogs.
4.6 Quality control shall review all Purchase Orders.
4.6.1 When verified correct, the Purchase Order shall be signed by Quality Control.
4.6.2 Quality Control shall retain a gold receiving copy of the Purchase Order for receival inspection and documentation purposes.
~
4.7 The Purchasing Agent shall purchase Class I material, components and equipment from suppliers found on the approved suppliers / vendors list.
Q 4.7.1 Supplier approvals shall be made on Form HPF/SAR (Exhibit 3) and. submitted to Pacific Gas and Electric Company for review and approval.
~.xr., inqr 4.7.2 Preliminary source inspection shall be made
- 1
- ! ' g_.
l;;;m/g by'the Howard P. Foley Company unless otherwise directed by Pacific Gas and Electric Company in writing.
g HOWARD P. FOLEY 4.7.3 Periodic supplier inspection or wdits COMPANY may be conducted by The Howard P. Foley Compoy as deemed necessary by the Quality Manager.
5.
DOCUMENTATION 5.1 The Howard P. Foley Company form, Field Requisition is used by Production to request materials or services required for construction.
Field Requisition forms are not required to be maintained as a part of the Quality Record System, 5.2 The Howard P. Foley Company form, Material Requisi-tion, is used by The Howard P. Foley Company Warehouse to request materials or services which are not in stock.
Material Requisition Forms are not required to be main-tained as a part of the Quality Record System.
g
, c.%fIl l
! f;u-e
! i 1
i[bij k }
~
I y Utu jA.c 5.3 The Howard P. Foley Company form, Purchase Order I
$_);
(Exhibit 1), is used to procure materials and servicen from manufacturers, suppliers and subcontractors.
The QP-5422-1 Purchase Order shall contain instructions regarding REV. O support documents required of the manufacturer, riupplier or subcontractor and shall be maintained as part of the Quality Record System.
5.4 The Howard P. Foley Company form, Supplier-Approval Request is used to have suppliers approved for Class I items.
This form shall be maintained as part of the Quality Record System.
i O
"E=rL z za, 9351 x
THE HOWARD P. FOLEY COMPANY l
I y e. a nin k.
c b
- ~~
\\
1
9 0?-5422-1 EXHIBIT 3 THE HOWARD P. FOLEY COMPANY SUPPLIER APPROVAL IEQUEST l
TO:
DATE:
i l
ATTENTION:
i l
FROM:
l i
SPECIFICATION:
l l
I SUPPLIER:
l l
- D SUPPLIER'S PRODUCTS:
I CLASS I NON-CLASS I ENCLOSURES:
i i
l i
Project Manager 1
NOTED EXCEPTIONS OR CO.ND4ESTS 4
l i
PERIODIC AUDITS TO
.">E PERFORMED BY H.P. FOLEY.
YES
!0 i
t
(%
L)
P.G.& E. 'S APPROVAL WITH NOTED EXCEL"i iDSS
'!!f%;7-
-,J
'HPF/SAR k,,.)'
liuj t + j I
o.,omeo.
- 9.um,y fE HOWARD P. FOLEY COMPANY DATE V010 m
I 20
)
i f
1 JOB 0 A EXPRESS T
~ FREIGHT TERMS F.O.B.
REC C. DELivElity C A? L NE*T issiP 3&7veny
!c'Cv'c gazy p
fy:A wawctions
% OF THE MATEllAL'S PURCH ASE ORDER PtiCE,
> Lit VflLL ACCtP1 M AlltlAL tifURNLD Bf THE BUYtt IN t! ASON ABLE CONDITION, Af PRICE 6
OESCRiP7 ION I
sM No.
QU ANTITY o
i d
i I
W e
mw D
THE litM5 AND COHolflONS PRINilD ON THE REvilst SIDE OF THIS ORDER Att AN INTIGRAL PAff M(ttOf.
TOU Att TO NOflFY US AT ONCE if TOU CANNOT COMPLY WitH ALL THE ffRMS OF THIS ORCit CH ARGE TO THE HOW AkD P. FOLif COMP AHf 60.
pg, EGli PURCH All 08088 NO, Ault APPt At ON TQut INvotCtk ORIGIN AL PURCHASE ORDER
.e THE HOWARD P FOLEY COMPANY PROCUREMENT QUALITY NOTES The following notes are to be typed onto the Purchase order as may be deemed necessary:
Note No.
- 1. This Purchase Order contains Class I material, items i
Note No.
2 A Letter of Compliance is required for acceptance of items Note No.
3 A Certification of Material is required for acceptance of items
'(Physical & Chemical Test Report Required)
Note No.
4 The Howard P. Foley Company and/or The Pacific Gas and Electric Company shall have the.right to conduct Quality i
Assurance and/or control audits and inspections at any time during production and testing as may be deemed
'l Q
necessary.
Note No.
5 DO NOT SHIP MATERIAL without compliance to these notes!
Note No.
6 All material must' be domestic unless otherwise specified.
TEST Documentation is required on all tests and must be signed by a responsible representative of the testing laboratory.
BECAUSE THIS PURCHASE ORDER CONSISTS OF CLASS I MATERIAL, IT MUST CONFORM TO TITLE 10 0F THE CODE OF FEDERAL REGULATION PART 21 (TITLE 42 U.S.C.A. SEC. 5846) AS OUTLINED IN THE ENCLOSED ATTACHMENT A.
Examples of various special notes are attached for reference.
Notes may be modified by Quality Engineering when necessary.
l O
L VGe ~,W IL.
1 PV A copy of the Mill Test Report is required for each heat number of bolts or steel supplied.
Tests by independent laboratories are not acceptable for Mill Test Reports unless-specifically indicated otherwise.
Where possible, each f
1 size and length of bolt or size of material should be supplied from one heat number.
The heat number shall be reflected in the Mill Test Report, the Letter of Compliance (see bel.ow), the Charpy "V" Notch Impact Test (see below),
and the material itself shall be identified by heat numbers by either tagging the individual bolts or steel, or by identifying the packing containers.
The Mill Test Report shall indicate the chemical and physical properties of the j
ordered material and shall verify that those' properties meet the requirements specified on the Purchase Order.
J O
l e
hfOlh NI $IhY$
l
a+
VOID In addition, Charpy "V" Notch Impact Tests as required by ASTM A-370 must be performed on this material.: The a
Test Temperature must be F.
One test (3 samples each).to be performed on each heat of material.
For acceptance, the average value for each Impact Test shall be a minimum of foot-pounds, with not more than one specimen value.below foot-pounds, but in no case below foot-pounds.
Test documents must reflect the heat number of the material tested.
4 0
l-
?
I Vf '.b y v n; 1
[ -_
____________.__._____________.__w
O A letter of compliance is required'and shall consist of a document, signed by a responsible person, which states that the aaterial delivered to The Howard P. Foley, Company meets the ASTM requirements specified on the Purchase Order.- It shall also. reflect the heat number of the i
material and The Howard P. Foley Purchase Order Number.
O 7
3
. i.-)
u t
1
l O-TaE nowiRD P. rotEr COMPAxY SUPPLIER APPROVAL REQUEST TO:
DATE:
ATTENTION:
l FROM:
SPECIFICATION:
SUPPLIER:
I J
SUPPLIER'S PRODUCTS:
I NON-CLASS I I
CLASS I ENCLOSURES:
)
)
l 1
Project Manager NOTED EXCEPTIONS OR COMMENTS PERIODIC AUDITS TO BE PERFORMED BY H.P. FOLEY, YES NO
<?
Y 1
P.G.& E.'S APPROVAL WITa NOTED EXCl.PTIONS HPF/SAR l
1
_,/ f)l. ' '.k h,# ' D ch0 THE HOWARD P. FOLEY COMPANY M gn '
i
- MhlN9 7
PRODUCTION ENGINEERING DEPT.
2 0 ;973 g 3
U ENGINEERING DISPOSITION REQUEST 4
W/
MM Subject
//- n **
e s
Fram W
n!NVD L A
Problem A,b_ _'3_9FM S/1:VM M
C 1A E_ #
6/A//d j
SM Sp Df.'
.Aj,b4 ?
?
M AX>'2 5. f '
QAn #1 t
,A A M.
fkN Al A.
.A / w
/I n
A t-0/ncAwuw fx//f_M
,Ak n/Jer-A, m,sh_ n_ss).
sash _
/}wA uneCs g~r-2/u s A,nnrx 4 L-Ad *7~
//m m2%
/AJgzm e
-or,num,&,n_w c m _ +-
- e..ra w.
,nas1/e s u_ m.ih smz Au ie i 1is-na-n 1/mims
/S nn r2e u'ii
'rA4'c s'c mih % C(4%f Date 7//a
//46 et e /e,
Signed m
v y
Reply bAA/ufM YtA#
.S APPAntA4L A5" DOV/AEED RA R4 Vsvoox ngrayn
/s smwsu ouw w&v
/rw.
agh onm,
nn
/rm seawas sown sm&ca A
2
///
Si9 Date f-E-T e5 e
4 e
e 0
e 4
e e
0 a
e 4
e e
p v.
t.
/
.n.,
't C'
~N>
e.-
.......r...._.....
S...
k.,
/
_M... _... _.
I m....
._. _.... y' '
.......__...A.
. $ 6c7.. 7c....
Y
. -; t v e s 7..
/./
.... _.. __. _.... pm _ %.._. _.
/0....... _..
2.
_._.- _. /. f......... /.
....... hsheep. &.. btAst.'._..UH csx.
qpr+4- _..
.._...ese m R9n c7zvn m _...... y p A & Mod.
.. _.... u......
l (Q e..._.. / gun /
3 7 a p - A 4 4. _.... 3 /// p g... & !,
.. ~.. _... _....
. ydm
. A /2s....s-c r-... _ _
....__._...._._..._.__1 i
=.
. a 22 w._._.. a....._. i S..._. d... & '..._ __ x..._._.
...7b_......0y......._,o h s' d :.... _. 6 's 5 1 @
....... _. ~.
h
.........,... &,, 4 4.......
... de_.. _
1
..p. _, ro.
)
t M A /....M 8~//t' t.
. 4..;
p..
r, e l s, J3
..f M
" a. c.. _..,7 v.
e.,
t it/.
,..j.
f 'f
-'/
' "..J 's ]. (,} :..,,
. 1
,j..,... g.,
t e <y'l.
h j
/
.i
(.
(. J
~'~m
, _. - - _,., _ _.. -, - -, - - - - - - ~ ~ -
b.
- 9 62 THE HOWARD P. FOLEY COMPANY O
-/
g4
,y
,,L m (e
sy, jn en eRoouenoN EmiNEEniNG oErr.
er 2
~
g
~
ENGINEERING DISPOSITION REQUEST T
I878 N 9
$cbk
-m
-//>wmn s M.
l*
subject
~
M M
$M J
Frem Proble
./.7
M./>
PM, e MAJ'O WAT un ~,-
s,,om.,n t su. n sea
,s, n/ awn
$ WJ
. APE //7)he b.
44+9 A Y TN/.'T
,/I) / G kt A $ 4 DlFr N
.b4n /_./j).rr 3.,
ondA,L f)C ),;"~
M.
T S 722k/
$a h > 1.
AS A
J/k nd
/= hip A6-wLA S TML divc 5 //Gr/7" ( A L kit m nux Cuti Mfhan /_-rew S,/Ne c/S, 0m s le n m-sm m,n nok d<<r A.,ce C6/f A
7 Signed M
Date 7//,/3 x a
RepW. J,ef f 4 2.
JKe
/
/\\
/7 SignW Date.Z.7'O '#
e e
e 6
8 9
6 j
\\
1
. ) ]L-h j
Qf q
E Uh R
NfD
'THE HOWARD P. FOLEY COMPANY 71' lbc % #
UI PRODUCTION ENGINEERING DEFT.
4 6 1 ENGINEERING DISPOSITION REQUEST gc1 AY c.
Subject ALA Af to To Frsm LC u.>>G r
/
S s
Problem AJ
/wl11 Shm M>
sm PL W-i
,6
. /n. E, n.
fa,
,n /
A%cwn c n b.
, L& t_-
b%, 6A
,Ym d,D L
]'
A,$ m,,
l I
Signed Date Reply 'i &A '44 A'UY Of Ala buh4 lb Yb $ IAln'll 2%'a 'IN d 'TAl<2.
C_ gdd v
A.
/
- h(7(24.-t L tl 9 tr.4 Cd Et H b fi G*
$) v Yt.1 A A/L/ f-A 1ts C f Yb't]Y I
0 t
1.
4kh.h w Dv m> wand /uisM A,f,awod Win l4A.
2, 1,,n p
At/n $ b. pil M u'A' f f S L*(Wdt' JYbM$
,4 A$)$non o /Afl4 s9 v' 9-y 3
.t>tr n b i) r> lAh 7~nmaiev*Ml
. s q
Date M /b 7 Signed
/
e t
S i
e a
a
\\ p
cc: y y C
(.
W
" ^ '
7744 6
THE HOWARD P. FOLEY COMPANY
@' ' 9
~'
Ni x
l
/p s.
PRODUCT 10N ENGINEERING DEFT.
Opefgiiff \\
UNU ll9 l
C
- >iO G, '1 gefi ENGINEERING DISPOSITION REQUEST
,f.
OCT fd 3919
~
- /
D. Rdc ell / Attn: F. Russell Subject Purchase Order Reg ements
- ,s T.
4 V
yson p
\\N Problem The Howard P. Foley Company has been' verbally directed by l
1 Pnci fi c Can nnel F1 ncevi c Comnnnv tn dn19t p n11 vpfnvencoa and attachments regarding 10CFR21 from Class I Purchase Orders.
Any
.\\
future references to 10CFR21'on Class I Purchase Orders will be made by Pacific Gas and Electric Company direction for specific purchases, h Docs Pacific Gas and Electric Company concur with the'above?
l Signed Mh Date /g/3 S/79 Reply hO Sa ee-sh-1 i
i t
gs i
a
/
8 e
e 8
e e
4 e
e ep
)
4' meter. 9 3
G,4
/
y y,j 6
Test:
Allegation.or Concern No. 136 ATS No.: RV-844-40 BN No.:
' Characterization Foley audit findings were not properly handled.
(Two examples were provided by"the alleger.) b
^A
, 4 4.1% 4 hh
-Vu hW mp k
% n.4. s' w & u &
Assessment of Safety Significance MM
/M M
i The staff conducted a face value assessment of the two audit findings and concluded that part of the concern was the result of a misinterpretation of the resolutions provided by the QA Director and the allegers apparent distrust of the Foley QA Director's motivations nspector e uded thatmeesethetworesolutionswerewritten'inumget-terkfenoewasnot g[
g sufficient evidence to conclude that these were improperly handled.
The A
staff concludes that exhaustive examination of this issue is unlikely to result in any new management or quality performance issues and, thus, the additional expenditure of staff resources is not warranted.
Staff Position The staff concludes that an audit of the resolutions provided by Foley in response to QA audit findings would be in order to more fully evaluate the acceptability of resolutions provided. This action would provide the assurance needed to resolve this issue.
Action Required This item will be turned over to PGGE for accomplishment of the above action. The licensee will be required to provide written response of their findings and necessary corrective' action.
h Ma % k.
m\\\\sh M
sW5 7-
'i n%+
l T-r th n:as 1rw
<>e i n i.m w,a,,
p r 79 t-y <&i>' $/79 Y$?
' fl l I
3Ref&-p> x,-d /y?f hJ
/
5arsgs'?&ifn/d/79 hW
>,0 uni 80ea a a sa b
d si tis. [{p%
tfeS a L,y a gg c 39dySb 'f 3 p'79 fdfa) gg Da /e Go< - - n
%f07 2p4/10
/k
%Wb p/z7,lp yd)/6( ^'o*
( N P, j
4 din R/27/10 llte& Wo.
f'0W sM'fo gY f
.P iyus ojgn' V
us, vw 3pj'go fd&
35209
/>/294 w& mi
/
t4o.
si >/19 g
bid- (4f>c,)
b 35/9V son n/aN _g ' a
,i,4//7p
' No. ((c,n
.seits i
2n9/
is/w/i9 D & '
fib-
\\
J57f)
>(/'$/?/
!$htY
^#
gp+c s;/ir/79 t'6ddf I!o.
i w m i<
/-[0, 3 /k'/
//[//[7f YJ<%
/
$l l $ ff ws s/1/19 h ^ ;
., ^'# \\
6o 6/7 atti/p n/o
.________________--__0
I e
ase?
/J/9/7f Gb Ho.
x 9979 fg
/
f)M No.
ill7l)f 4+y Q s/o.
.s5/si re A y
m va iNri o.
3SDb i//f/79
$5Us/*
4o.
3f/26
/Y?/7f h
Nb
.isy2 ?
nf n g l,'
No.
// 4/7f M@
E2 0 No 392/
////19 Y N'
31, 1 g/si)79 No.
10/db2 Sh, No.
wn
'9khp @in ks}fk3 i4/c wo.
nn7
% ' '7
' 7 ;?
UtdWc,f p'b, 7
3Sr'
/.3/y79 No.
A//<df (Ay, &
M.
1n7 m@
it/2p9 fsay Aio,
j MD 4W/70 tik No.
G,ony ti/2//'t.y Wc1&
M6 332 s r
'/Y/79 gyh M6.
Anas s h Mr 3*52 4'2.
t/3/79 9,,pa y'C 3.
'/u/7f ##j'j;,.cyrn9 ey; w nyes.
nzer yt3 n zs" i
)
J
]