Rev 1 to QAI-2, Diablo Canyon Nuclear Power Plant Quality Administrative Instruction for Documentation Turnover (File Inventory)ML20237K595 |
Person / Time |
---|
Site: |
Diablo Canyon |
---|
Issue date: |
12/21/1983 |
---|
From: |
Wilson L HOWARD P. FOLEY CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20237K209 |
List: |
---|
References |
---|
FOIA-84-743 QAI-2, NUDOCS 8708190327 |
Download: ML20237K595 (8) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20155C0701998-10-23023 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Converting to ITS ML20154A4001998-09-25025 September 1998 Proposed Tech Specs Pages Re Sections 3.4 & 5.0 on RCS & Administrative Controls ML20249C4221998-06-25025 June 1998 Proposed Tech Specs Pages Re 980522 RAI on LAR 97-09 for Section 3.6 Conversion to Improved TS ML20217P5921998-05-0101 May 1998 Proposed Tech Specs,Eliminating Requirement for Operations Manager to Hold SRO License ML20216G5961998-04-15015 April 1998 Proposed Tech Specs,Changing Surveillance Frequency from at Least Once Every 18 Months to at Least Once Per Refueling Interval ML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML16342A1671993-07-0707 July 1993 Proposed TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents. ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20044D8061993-05-0707 May 1993 Proposed TS 3/4.3.3.5, Remote Shutdown Instrumentation. ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20058E7741990-10-18018 October 1990 Proposed Tech Specs Revising Section 3/4.2.4, Quandrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20012C5981990-03-14014 March 1990 Cycle 4 Startup Rept. W/900314 Ltr ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237K6951987-08-14014 August 1987 Revised Procedure 8833XR-1, Diablo Canyon Rupture Restraint General Repair Procedure. Related Info Encl ML20237L2481987-08-14014 August 1987 Spec 8833XR-001 Re Procedure for Preparing,Testing & Repair of 10% of All Full Penetration Welds Installed Per Spec 8833XR.Related Info Encl.W/Copyrighted Matl ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20211A2651986-10-0606 October 1986 Proposed Tech Specs,Revising Reporting Requirements Per 10CFR50.72 & 50.73 & Correcting Typos ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20155B1031986-03-31031 March 1986 Nonproprietary Natural Circulation,Boron Mixing & Cooldown Test,Final Post-Test Rept ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-174, Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 19851985-04-29029 April 1985 Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 1985 DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown 1998-09-25
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237K6951987-08-14014 August 1987 Revised Procedure 8833XR-1, Diablo Canyon Rupture Restraint General Repair Procedure. Related Info Encl ML20237L2481987-08-14014 August 1987 Spec 8833XR-001 Re Procedure for Preparing,Testing & Repair of 10% of All Full Penetration Welds Installed Per Spec 8833XR.Related Info Encl.W/Copyrighted Matl ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20132E8441985-04-0101 April 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.1 Re Activation of Corporate Emergency Response Organization Emergency Radio Pager Instructions ML20116C1381985-03-26026 March 1985 Public Version of Updates to Sops,Vol III of San Luis Obispo County Nuclear Power Plant Emergency Response Plan, Including Rev to SOP III.10, Dept of General Svcs. W/850419 Release Memo DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo1985-03-14014 March 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo DCL-85-196, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence1985-02-25025 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence ML20125A6531985-02-0404 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations ML20209J1691985-01-31031 January 1985 Public Version of Revised Emergency Response Plan Sops, Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence ML20215B2591984-11-0101 November 1984 Rev 4 to QC Procedure DCP-2, Silicone Room Installation. Partially Withheld Related Info Encl ML20101J2191984-10-31031 October 1984 Public Version of Revised SOPs for San Luis Obispo County Nuclear Power Plant Emergency Response plan.W/841219 Release Memo ML20100K1371984-10-30030 October 1984 Pg&E,Diablo Canyon Power Plant,1984 Emergency Preparedness Field Exercise DCL-84-336, Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence1984-10-25025 October 1984 Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence DCL-84-330, Rev 3 to, Repair/Replacement Program1984-10-19019 October 1984 Rev 3 to, Repair/Replacement Program ML20101B0721984-10-15015 October 1984 Public Version of Revised Emergency Plan Implementing Procedures,Including 1.1 Re Corporate Emergency response,3.2 Re Corporate Communications dept,4.1 Re Matls & 4.9 Re Qa. W/Jm Felton 841213 Memo 1996-10-11
[Table view] |
Text
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -.
S QSf I _.
VI: M I.
J,QAI-2
["
auna y
J.
u
REV.1 5
".'..'v_b; ' -4
~ els-T.;a....-
6 NWS=...+I!!Ol8dMESE[ND DATE: 12-21-8' i
DIABLO CANYON NUCLEAR POWER PLANT QUALITY. ADMINISTRATIVE INSTRUCTION t
FOR l
DOCUMENTATION TURNOVER (FILE INVENTORY) l l
l THE l.
HOWARD P. FOLEY r
COMPANY l
P. O. BCX 2 7.
. AV;LA GEACH, CALIF.
9 34 4 835 595 737' Cmess:
ALLENTC'AN PENNSRYAN'A B ALTMO AE. MA AYLAND V fg
/
l CHICAGO tLLINO S 7
4 DATE: /0 J '/ / 2 C AL_A S. T EXA s APPROVED: c5 f
/
DAM $8U 3. PENNSYLVAN' A sousics.u xas Quality Director
. LOS 2.GELES. CAL?OAN A l
UAM NEZ CAtlFCAN:A MIVD*S. TENNESSEE Ne','. C c.e_ANS. LCU'S. A N 4
~*
~.*n'fLi*,
_.N'? ~ PENNSYLV AN'A~
~~~ ~
~
~~
- - - - - - - - - - - ~ ~ - - -
-~4~--
F OENIX. A=:*C'. A l
P'TTSBUAG-PENNS'iL\\ AN:A R.CnVOND viA$N-A SALT '.AKE CITY. UTA-4 Ta v= A. ric A : A THE HOWARD P.
FOLEY COMPANY l
Tees:N An :.*
v,As,r.27:N o :.
i
- .m a s
- sca c 8708190327 870814 PDR FOIA
.. :y 4.e==
a DEVINE84-743 PDR
. _,,k
s I
1'. i i
i
)
.1 l
1
'i 1
1 i
f QAI !
~
r REV.1, Changes Made to QAI-2 l1 Documentation. Turnover (File Inve1 tory) l l
e Revision 1 1
This instruction has been completely revised:
1)
Deleted Data Input / Checklist j
2).
Deleted Records Sealing 3)
Deleted File Follower I
4)
Added File Inventory 1
AA A._
m T-
,1 I
d i
THE HOWARD P. FOLEY COMPANY l
1
, - -. ~.., -..,.
... ~ ~.. -..
.. _ - - ~. _..... ~ - -... _.. _. _.. _
l i
i i
I_-~ -,... - -. - - -,, - ~.. -. -,,...,.
[
j i
~
H l
l.
SCOPE This instruction describes the method to be used to inventory and document the review of Quality 1
Assurance Records in preparation for turnover to the customer.
-QAI _
j REV.1 2.
PURPOSE 1
.The purpose of the instruction is to assure that Quality Assurance Records within each file have been identified and signed-off as being reviewec.
I 3.
RESPONSIBILITIES 3.1 The Document Review Supervisor is responsible for the implementation of this instruction.
l 3.2 The Document Review Analyst is responsible for the review of records in preparation for vaulting in the Records Management System and/or subsequent turnover to the Customer.
4.
METHOD 4.1 Quality Assurance Records from September of 1981 forward shall be reviewed for completeness
=~(ez
,and correctness prior to turnover to the Customer, p Il This review shall be indicated through the use of
_r a File Inventory Record (Exhibit 1).
j xx 4.2 Turnover documents shall be listed on the THE File Inventory record which will be placed in i
HOWARD P. FOLEY each file.
f COMPANY l'
4.3 A Document Review Analyst will indicate final acceptance of the conterits of' the' file ~ by signature and date in the appropriate space on the File Inventory form.
4.3.1 A Phase I review will be conducted first to verify inspection documentation supports the appropriate drawings and As-Builts.
i 4.3.2 A Phase II review will then be conducted
~
l to verify compliance to QAI-1 and/or individual checklists established for the purpose.
Phase i
m._.__.__.---
+- -II-s ha ll-be~ an-a dmi n i s tr a tive-revi ew.---- -
i 4.4 Deficiencies which are noted during the review
+
l and are not readily corrected shall be idencified l
by a Document Deficiency Notice (DDN) in accordance L
with QAI-1.
r:esolved DDN's will be included behind the File Inventory Record.
l l
l 4.,
-.m e
,-. w.,
my %
~,,,9.y.
,. ~.
,..,..... ~, _..,,,.. _., _...... - _....
y..
bl.n k u k's 1 THE Hoh'ARD Po FOLEY C.MPA',T t
4 QUALITY ASSUPE CE RECO?DS y
F I, c.
I.,.,. n..
. R,.,,
s.....
9 ei.
L'ork Initiation Document Package I.D.
i 9
DISCFIFTION S0. SHEETS P
J s
4 y
a n
l l
-. ~. - - - - - -.. - - -. - -. - - - - -
- - - -^--
G
.C..'J..", ?
.s
...L
.I **.i..;, g
?., 8.m. E
.I. na. )
T*
ge,=., e
a p
- 9. 4.;,
9 1 m ' *.*
- *4 g.*==. =.. 3 e. ;.
,*5 mL a. -
4=
.e.,m g
.n.
,e
.3
=
7
?
- 1.. f g*, e
.a=
g..
6--e
..-v
.+==b=g
.4
,y.,
u.
gux,.*,.
..~y.-.~-------
- + ' - ' '
"' " ' - * * ~ ' ' * ' ' ~ ' ' ' " ' ~"'
~ *
' ' ~ ' ~ ~ ' ~ ~ '~
THE-HOWARD P. FOLEY COMPANY.
I/JL/O' l
QUALITY ASSURANCE RECORDS V/;4 FILE INVENTORY
~
\\,/ A d
1 1.
Work Initiation Document
. Package I;.D.
DESCRIPTION
.NO. SHEETS:
i As-Built Drawing Work Process Traveler /EDR's, DR's DCN's HPF/WIS -' Weld Inspection Sheets j
.HPF/SSWIS - Sheet Steel Weld Inspection Sheets HPF/ABIR - Anchor Bolt Inspection Report
?
HPF/MSIR - MacW"1 Support Inspection Report j
HPF/DIR - Duct Inspection Report HFP/GIR -'Rev. 2 - GR N r Inspection Report i
1 1
m E
1*.V
%,m
'4 3
An 5p~ -['
f "f[ ht,,N ff ' $\\ [
'~
s
\\)
- 4..
'... O
_e_.,-
TOTAL SHEETS Phase I and Phase II review of this package is complete and acceptable.
Phase I Review Date Phase II - Review Date M % 9.W t*T' '* 1 %W IW *' A M"%f NkT WM-'45'P'""P WP*P'P r$'% S P ' '92*Tf f i+**''*%.^F # BS
WP h MN* g88*'e* B N *t **'*P*** *W8F*W *1p#eqUtsi"P " + 19 8*w p e. 9 - wo w y*
g-
-um ', noe s - g. d ag%ww-ge g es, yepie e
4 e es i
l THE HOWARD P. FOLEY COMPANY CIVIL DOCUMENTATION
~
REVIEW C-6lSI Work Initiating Document Package I.D.
YES NO N/A
~
I.
PRELIMINARY REVIEW A.
Are documents listed on the index in the package?
B.
Has the index been signed for' Phase I review?
C.
Is the Work Initiating Document referenced or attached and complete?
D.
Is the latest Work Process Traveler attached and complace?
l E.
Are supplements attached to the Traveler and complete (where applicable)?
II.
INTERIM REVIEW A.
Is the as-built or drawing included and Phase I reviewed?
B.
Were the required inspections completed and documented?
l i$ k,,f',(Dr m p ;k
)
III.
FINAL
/.7 "
.g
~7
'(.. ',{:. M..
p ;,.
'p rj q jf u
A.
Have discrepancies noted on Inspect on
'y
,i,'
Reports been resolved?
-L U
~~
I B.
Have discrepancies noted on this worksheet been resolved?
C.
Remarks:
Reviewed By Date
~;
C -,
b----.-..---.--------~.-----~--
m_....,.~._m.,-.~,
- - - - ~ ~ ~ - - - - - -
1 THE HOWARD P.
FO ZY CCMPANY g-
,, 4 QUA~aITY ASSURANCE RECORDS FILE INVENTORY i.
Wor.i~Inititation Document Fsckage I.3.
]
1 DESCRIPTION NO.EMIETS l
l As-Suilt Drawinz i
Werk Process Travaler/Cennect4-FL=--a M" 4 - m HPF/ MIS - Meld Inspection Sheet NCE Report colt F1 tup & Tigntening HFF/ EFT - Insrection Report i
HFT/TR - Torcue Report HPF/GIR - Rev.2 - Grout Insrection Reecrt i
Grout Arounc Thru Bolts MPF/T5G1R - Inscection Perort HPF/ESIR - Reinforcing Steel Insrection Rotort HPF/ESNR - Reinforcing Steel Neld Report PG & E Authorization to Drill
.e:/C31 -
or p(n en, c,.g g,
l/ABIP - Ancher Bolt Inspcction Rerer:
1 1
1..
f' ih g rA Ah n2
\\/
d l N f -' Q L / l M L If I
lw
......~ -.-~-.- - -. - - -- -.-
TOTAL SHEETS Ph:se I and Phase II review of this package is complete and acceptable.
Phar,e I-Review Dat Phase II -Review Dr.te r,emson.e te, - rw c-n ~~, en~.~. w-r--., n-,- +
-,r-.=.m
~r
~
e,*.
-~-v-r---
~~ ~ e
-*--w-e..
v,-~~~-~+.-
= ~. ~. ~.
l
y.: a.,,,,,
1 HE IGMFD P. FOIrl 024PANY temmca Immnum REVIEW i
a.
~')
i Work Initiating Document Package I.D.
~
YES NO N/A i
-I.
PRELIMINARY REVIEW-A.
Are documents listed on the index in the package?
B.
Has the index been signed for Phase I
)
review?
l C.
Is the Work Initiating Document referenced or attached and complete?
D.
-Is the latest Work Process Traveler I
attached and complace?
E.
Are supplements attached to the Traveler and complete (where applicable)?
l II.
INTERIM REVIEW
~
A.
Is the as-built or drawing included and
' Phase I reviewed?
J B.
Were the required inspections complaced and documented?
III. _ FINAL A.
Have discrepancies noted on Inspection Reports been resolved?
Havediscrepanciesnotedocheks I B.
f
'.. h l lfi
/
been resolved?
.j i
., g g Pj l
- .' b % a w b
]
~
C.
Remarks:
(_
- -. -~--
- ' - ~ ' ~
P t
l.
i l
t Revisued By Date
,.__,.,_.m,._.,,-.
' ~ ' ~ ' ~ ~ ~ ~ ~ ~ "
L
- - - - - - -