TENNESSEE VALLEY AUTHORITY s-SEQUCYAH NUCLEAR PLANT k
EMERGENCY CONTINGENCY INSTRUCTICJJ ECA-0.2 RECOVERY FROM LOSS OF ALL AC POWER WITH SI REQUIRED I
Revision 0 PREPARED BY:
G.
Strickland RESPONSIBLE SECTION: / Operations
/
REVISED BY:
N/A/j SUEMITTED BY:
jf((8/ /,4y Re'sponsible* Spdtion Supervisor PORC REVIEW DATE:
AUG 211985 APPROVED BY:
[ Egg %
Plant' Manager 2 1 1985 DATE APPROVED:
Reason for revision (include all Instruction Change Form :!os. ):
New instruction written per commitment to IUREG 0737.
The last page of this instruction is number:
9 I
8708170486 870811 PDR ADOCK 05000327 p
PDR t
SEQUOYAH NUCLEAR PLANT r
f i-PLANT INSTRUCTION REVISION LOG 1
EMERGENCY CONTINGENCY !:ISTRUCTION EC.'.- 0. 2
?2 VISION Date Pages
?IASON FOR REVISION (INCLUDE COM24IT-LEVEL ADoroved Affected MENTS AND ALL ICF FOFl4 NL'MBERS)
New instruction written per Octe nitten:
0 AUG 21 GM, ALL to 'TuREc 0737.
I.
I l
l l
t I
i l
i I
l 0350L/mbs i
w 9
1-J
u e,.s
SQNP 1
~
l0
C A - 0. " ' Unit '1 or "
if, Page 1 of 9
)
\\
Itev, O
- l r
r i
i
.(
'y
'3 EtECbi/ERY FRO 31 LOSS OF \\LL.\\C POWER WITil SI REQU'HED 4
1 A
\\.
'\\
s2 s
A.
PURPOSE 1.
Establish Compondnt' Cooling Water t
2.
Establish ECCS now 3.
Slowly i*estore RCP seal cooling ij
?
B.
SYT1PTOBIS -
None 4
C.
TR ANSI, TION PRO 31 OTIIER INSTRUCTIONS
['
1.
32CALO.0, Loss Of All AC Power 2.
EC A-0.1, Recovery F..vm' Loss of All AC Power tvithout dI Required d
u -
0 l
l
.i l
l l
s l
SQNP' EC A-0. 2 Unit 1 or 2.
.Page 2 of 3
.Rev. 0
,7 D
RECOVEP[Y FROM LOSS OF ALL AC POWER WITH SI REQUIRED STEP ACTION / EXPECTED IlESPONSE RESPONSE ':OT OBTAINED Note:
The purpose of this ECA should be reviewed prior to using this instruction CAUTION: ' The loads placed on the energized AC board should not exceed the capacity of the power supply i
Note:
Status Trees should be monitored for information only, 1-Establish RHR Valve Alignment Verify' RHR discharge f
a.
valves - OPEN -
- 1) FCV-74-16 and 28
- 2) FCV-63-93 and 94 b.
IF RWST level > 29%,
b.
IF RWST level < 29%,
TllEN verify suction TIIEN verify suction from RWST from entmt sump l
- 1) FCV-GJ-1 OPEN FCV-63-72 and 73 l
OPEN 2)
FCV-71-3 and 21 OPEN l
FCV-74-3 and 21 CLOSED
%. l l
.o SQNP EC A-0. 2 IInit 1 or 2 Page 3 of 9
{
Rev. 0 1
RECOVERY FROM LOSS OF ALL AC POWER WITH SI REQIIIRED l
STEP ACTION /ENPECTED RESPONSE RESPONSE NOT OBTAINED 2
Establish SI Pump Valve Alignmen t a.
Verify SI Pump discharge valves - OPEN
- 1) FCV 152
- 2) FCV-63-153
- 3) FCV-63-22 b.
IF RWST level > 29?,,
b.
IF RWST 'evel < 29%.
I THEN verify suction from THEN verify suction from RWST 1:11R
- 1) FCV-63-5 OPEN FCV-6",-3, 4, and f
2)
FCV-03-47 and 48
~
175 CLOSED OPEN FCV-63-6, 7, and 3 OPEN FCV-63-11 OPEN FCV-63-47 and 48 OPEN 3
Establish CCP Valve Alitinment a.
Verify BIT inlet and outlet
- OPEN
)
- 1) FCV-60-39 and 40
{
- 3) FCV-G3-25 and 26 b.
.l_F RWST level > 20%,
b.
!f RWST level e '"Jh,
i TilEN verify suction from THEN verify suction RWST from RHR 1)
FCV-62-135 and 136 FCV-63-0 and 7 OPEN OPEN FCV-63-8 OPEN 1
a'.
a
r S O N P.
EC A-0. 2 Unit 1 01 2 Page 4 of 9 Rev. 0
,/
RECOVERY FROM LOSS OF ALL AC POWER WITil SI REQUIRED STEP ACTION / EXPECTED RESPONSE.
RESPONSE '!OT OBTAINED 4
Close RCP Thermal Barrier Return a.
Close FCV-70-87 or 90 5
Manually Start Following l
Equipment a.
Componen t Cooling Water Pumps b.
Individuauy start RHR Pumps and SI Pumps, as required, to estabush following:
C
- 1) RCS subcooling > 40 F
- 2) Par level > 20%
[50% FOR ADVERSE CNTMT]
l o_ ___ - __ _
0
SQNP ECA-0.2 Unit 1 or 2 Page 5 of 9 Rev. O f
b\\
RECOVEI'.'Y FROM LOSS OF ALL AC POWER WITII SI REQUIRED STEP ACTION /ENPECTED RESPONSE RESPONSE 'OT OBTAINED 6
Establish CCP Operation
.IF NO_ CCP running, a.
IF CCP running, a.
THEN isolate RCP seal THEN maintain CCP injection using reach rods oper:. tion and continue outside seal water irdection with next step filter cubicles - iux Bldg 090
- 1)62-546 seal water injection filter bypass isolation
- 2)02-549 seal water injection filter A outle:t I,
isolation f.
- 3)62-550 seal water injection filter B outlet isolation b) AFTEhl verifying RCP seal injection isolated, THEN individually start CCPs, as required, to establish following:
- 1) RCS subcooling > 40 F
- 2) Par level > 201
[50% FOR ADVERSE CNTNT]
h e
J
3QNP.
EC A-0. 2.
Unit' 1 or 2 Page G of 9 Rev. O N
RECOVERY FROM LOSS OF ALL AC. POWER WIT 11 SI REOU11tED STEP ACTION / EXPECTED RESPONSE RESPONSE !OT OfsTAINED 7
Check' Cntmt Spray System a.
Place Catmt Spray Pumps in' A-Auto
.b.
IF cntmt press > 2.81 puig.
-THEN:
1)
Start Cntmt' Spray Pumps 2)
Start air return fans 3
Check CST Level a.
CST level > 3 ft a.
IF_ CST leve!
3 f t, j
T!iEN verify ERCW
- tiignett to AFW b.
CST lt: vel > 17 f t b.
IF CST level <.17 f t, fi!EN attempt to refill UST vhile continuing with this instruction
'{-
J
SQNP EC A-0. 2 Unit i or 2 Page 7 of 9 Rev. 0
(
RECOVERY FROM LOSS OF ALL AC POWER WITII SI REQUIRED STEP Ar' TION /ENPECTED RESPONSE RESPO'ISE ':OT OBTAINED CAUTION:
If S/G narrow range level decreases to less than 25%,
then the Motor-driven AFW Pumps should be manually started to supply water to the S/Gs.
Note:
If Motor-driven AFW Pump operation is not required, then f
pump should be maintained in PULL-TO-LOCK to prevent automatic start.
l 9
Check Intact S/G Levels Narrow range S/G levels a.
a.
Manually start Mo to r-
> 25%
>Jriven AFW Pump and j
cerify AFW flaw to intact S/G b.
Control S/G levels between 25% and 50%
10 Place IIvdrogen Analyzers In Service a.
Refer to SOI-43. I 11 Check If Ilydrotren !;nnors Should Be i' laced in Service a.
IF cntmt hydrogen
!F entmt hydrogen a.
concentration < 0%,
3Iincon tra tian 6%,
I THEN:
"'!!EN ilo not. nergine hydrogen 1 tnitors and
- 1) Open ice condenser not tiy ;'SC AIIU ACBs on Rx Vent Bd A-A Compt GE and 7D and Rx Vent Bd B-B Compt lD and GE
- 2) Energize hydrogen ignitors
', i L-
____.______s SQNP f#'
ECA -0. 2 l' nit I or 2 li Page 8 of 9 6
Rev. O 7
!r l
(, N' '
A RECOVERY FROM LOSS -OF AI.L AC POWER WITH SI REQUIRED _.
i STEP ACTION / EXPECTED RESPONSE
!iESPONSE NOT OBTAINED 1
i i
Note:
FRCs may now be implemented as necessary.
J CAUTION:
As part of subsequent recovery actions. RCPs f'
should not be started prior to a status evaluation, CAUTION:
RCP seal injection and thermal barrier should be established slowly to minimize RCP thermal stresses and potential seal failures.
Lj l
12 Establish RCP Thermal Barrier Cooling a.
Slowly establish Component s
Cooling Water to thermal barrier to reduce RCP bearing temp at' maximum rate of 1 F/ minute i
i
% __--______________-_-_____-_--_-]
O SQNP EC A-0. 2 Unit i "r 2 Page 9 of 9 Rev. 0
- {;
k, RECOVERY FROM LOSS OF ALL AC POWER WITH SI REQUIRED j
i STEP ACTION / EXPECTED RESPONSE
[tESPONSF ' OT OBTAINED 13 Establish RCP Seal Injection AFTER establishing Component a.
Cooling Water to thermal barrier, THEN slowly establish seal injection flow to reduce RCP bearing temp at a maximum rate of 1 F/ minute
- 1) Open seal water return FCV-62-61 and 63
- 2) Open RCP number i seal leakoff FCV-62-9, 22, 35, and 18
- 3) Slowly open 62-642, seat water filter inlet, using reach rod outside seal water filter cubicle Aux Bldg 690
- 4) Fully open FCV-62-89
- 5) Slowly open 62-549 or 550, seal water injection filter outlet, using reach rod outside seal water
~
injection filter cubicle Aux Bldg G90 14 Go To E-1. Loss Of P.eactor
'l Or Secondary Coolant
-END-l l
b {
_ _ _ _ _ -