MONTHYEARML20004E4991981-06-0404 June 1981 Provides Assessment of Existing & Planned Procedures & Training for Station Blackout Events,In Response to Generic Ltr 81-04.Westinghouse Owners Group Has Program for Emergency Operating Guidelines Per NUREG-0737,Item I.C.1 Project stage: Other ML20023B3571983-04-15015 April 1983 Forwards Response to Generic Ltr 82-33, Suppl 1 to NUREG-0737,Requirements for Emergency Response Capability. Safety Parameter Display Sys Will Operate from Emergency Response Facilities Computer Sys.W/One Oversize Drawing Project stage: Request ML20154J3951983-05-0303 May 1983 Discusses Negotiations Re Util 830415 Response to Generic Ltr 82-33.Licensee Proposed Implementation Dates,Summarized in Encl,Acceptable.Record of 820806 Telcon Encl Project stage: Other ML20024D1091983-07-25025 July 1983 Clarifies Scheduled Completion of Tasks Identified in Suppl 1 to NUREG-0737,per 830502 Meeting Project stage: Meeting ML20087L4571984-03-14014 March 1984 Provides Followup to 840228 Telcon Re Suppl 1 to NUREG-0737, Development of Emergency Operating Procedures, from Generic Westinghouse Emergency Response Guidelines. Development Will Continue as Described Project stage: Other ML20091H9491984-05-30030 May 1984 Requests Rev to Procedures Generation Package Submittal Date to 840701 Due to Need for Addl Review of Revised Package Incorporating Addl Concerns Re Emergency Operating Procedure Task Analysis,Per Suppl 1 to NUREG-0737 Project stage: Other ML20092N5791984-06-28028 June 1984 Forwards Procedures Generation Package Re Methods for Developing & Implementing function-oriented Emergency Operating Procedures,Per Generic Ltr 82-33 Project stage: Other ML20198D2521986-05-0909 May 1986 Forwards Responses to Items 1 Through 3 from Generic Ltr 86-04, Policy Statement on Engineering Expertise on Shift. Util Currently Utilizes Dedicated Shift Technical Advisor (STA) at Unit 1 & Plans to Use STA at Unit 2 Project stage: Request ML20206H4931986-06-19019 June 1986 Safety Evaluation on Generic Ltr 83-28,Item 4.2.3 & 4.2.4, Preventive Maint Program for Reactor Trip Breakers/Life Testing. Licensee Position Unacceptable Project stage: Request ML20206G2351986-09-30030 September 1986 Rev 4 to ASME Code Baseline Document Project stage: Request ML20214C9841986-11-0303 November 1986 Provides Required Info & Describes Compensatory Measures Presently in Place to Ensure Easy Access Between Control Room & Emergency Response Facility Project stage: Other ML20214J6501987-05-12012 May 1987 Responds to NRC Re Interim Review Results on Abnormal Transient Guidelines Procedures Generation Package for Facility.Response Refs Util 870408 Submittal Re Unit 2 SER Confirmatory Item 47 Procedures Generation Package Project stage: Other ML16223A6531988-01-0606 January 1988 Confirms Planned Insp of Emergency Operating Procedures (Eops) on 880201,per 880104 Telcon.Requests Simulator Be Available for Evaluation of EOPs Effectiveness & Controlled Copy of EOPs Be Provided to NRC Prior to Insp Project stage: Other ML20235T2491989-02-21021 February 1989 Advises That Action Plan Schedule for Corrective Action Re Deviations Identified in Insp Rept 50-334/88-02 Revised. Tasks for Emergency Operating Procedures Will Be Completed by May 1989 Project stage: Other 1984-06-28
[Table View] |
Text
r~n--
.s.
o Ve s:
4 I
r Wiley Power Station Shippingport, PA 15077-0004 Nuclear Group (41216 0 6255 February 21, 1989 1
U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Inspection Report 50-334/88-02 Gentlemen:
By. letter dated May 13, 1988, Duquesne Light Company provided a
reply to address the Notice of Deviation which was included with NRC Inspection Report 50-334/88-02.
The Notice of Deviation stated that when the Beaver Valley Unit 1 Emergency Operating
. Procedures (EOPs) were upgraded per Generic Letter 82-33 requirements, many of the EOPs did not adhere to-the guidelines of the'NRC approved Procedures Generation Package (PGP).
In our reply, we committed to address the identified concerns in accordance with our existing schedule for the revision of_the Unit 1 EOPs.
An action plan was provided, along with target dates for addressing specific problem areas.
All tasks were expected to be completed by March 31, 1989.
This effort has taken longer than originally anticipated, therefore, our action plan schedule has been revised.
All action plan tasks are now scheduled to be completed for both Unit 1 and Unit 2
EOPs prior to the return to service of Unit 2 from its first refueling outage.
This is expected to occur during May, 1989.
The revised EOPs for both units will be in use at that time.
Our need for additional time to complete our actions has previously been discussed with our Senior Resident Inspector.
This submittal provides formal notification of our revised completion date.
8903080208 890221
][ 0 PDR ADOCK 05000334 O
PDC g
4 S.
l,l_
' B02vQr Valley Powcr Station, Unit No. : 1
~.,g
',)
L Docket No. 50-334, License No. DPR-66 L. '
. Page 2 1.
J.
' If ' there are any questions concerning1this response, please
- contact my. office..
Very truly yours, kI_*.
J.
D.
Sieber Vice President l
Nuclear Group Attachment cc:-
Mr.
J.
Beall, Sr. Resident Inspector Mr. W.
T.' Russell, NRC Region I Administrator Mr.
P. Tam,;Sr. Project Manager Director, Safety Evaluation & Control (VEPCO)