MONTHYEARML20004E4991981-06-0404 June 1981 Provides Assessment of Existing & Planned Procedures & Training for Station Blackout Events,In Response to Generic Ltr 81-04.Westinghouse Owners Group Has Program for Emergency Operating Guidelines Per NUREG-0737,Item I.C.1 Project stage: Other ML20023B3571983-04-15015 April 1983 Forwards Response to Generic Ltr 82-33, Suppl 1 to NUREG-0737,Requirements for Emergency Response Capability. Safety Parameter Display Sys Will Operate from Emergency Response Facilities Computer Sys.W/One Oversize Drawing Project stage: Request ML20154J3951983-05-0303 May 1983 Discusses Negotiations Re Util 830415 Response to Generic Ltr 82-33.Licensee Proposed Implementation Dates,Summarized in Encl,Acceptable.Record of 820806 Telcon Encl Project stage: Other ML20024D1091983-07-25025 July 1983 Clarifies Scheduled Completion of Tasks Identified in Suppl 1 to NUREG-0737,per 830502 Meeting Project stage: Meeting ML20087L4571984-03-14014 March 1984 Provides Followup to 840228 Telcon Re Suppl 1 to NUREG-0737, Development of Emergency Operating Procedures, from Generic Westinghouse Emergency Response Guidelines. Development Will Continue as Described Project stage: Other ML20091H9491984-05-30030 May 1984 Requests Rev to Procedures Generation Package Submittal Date to 840701 Due to Need for Addl Review of Revised Package Incorporating Addl Concerns Re Emergency Operating Procedure Task Analysis,Per Suppl 1 to NUREG-0737 Project stage: Other ML20092N5791984-06-28028 June 1984 Forwards Procedures Generation Package Re Methods for Developing & Implementing function-oriented Emergency Operating Procedures,Per Generic Ltr 82-33 Project stage: Other ML20198D2521986-05-0909 May 1986 Forwards Responses to Items 1 Through 3 from Generic Ltr 86-04, Policy Statement on Engineering Expertise on Shift. Util Currently Utilizes Dedicated Shift Technical Advisor (STA) at Unit 1 & Plans to Use STA at Unit 2 Project stage: Request ML20206H4931986-06-19019 June 1986 Safety Evaluation on Generic Ltr 83-28,Item 4.2.3 & 4.2.4, Preventive Maint Program for Reactor Trip Breakers/Life Testing. Licensee Position Unacceptable Project stage: Request ML20206G2351986-09-30030 September 1986 Rev 4 to ASME Code Baseline Document Project stage: Request ML20214C9841986-11-0303 November 1986 Provides Required Info & Describes Compensatory Measures Presently in Place to Ensure Easy Access Between Control Room & Emergency Response Facility Project stage: Other ML20214J6501987-05-12012 May 1987 Responds to NRC Re Interim Review Results on Abnormal Transient Guidelines Procedures Generation Package for Facility.Response Refs Util 870408 Submittal Re Unit 2 SER Confirmatory Item 47 Procedures Generation Package Project stage: Other ML16223A6531988-01-0606 January 1988 Confirms Planned Insp of Emergency Operating Procedures (Eops) on 880201,per 880104 Telcon.Requests Simulator Be Available for Evaluation of EOPs Effectiveness & Controlled Copy of EOPs Be Provided to NRC Prior to Insp Project stage: Other ML20235T2491989-02-21021 February 1989 Advises That Action Plan Schedule for Corrective Action Re Deviations Identified in Insp Rept 50-334/88-02 Revised. Tasks for Emergency Operating Procedures Will Be Completed by May 1989 Project stage: Other 1984-06-28
[Table View] |
Text
o y.
'Af Telephone (412) 4564000 Nuclear Division P.O. Box 4 Shippingport, PA 150M@04 May 30, 1984 pirector of Na lear Peactor Pegulation
/U. S. Nuclear Pegulatory Ccmnission Attn:
D. G. Eisenhut, Director Division of Licensing Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 r tter 82-33; EOP Procedures Generation Package Generic e
Gentlenen:
Our submittal dated April 15, 1983 provided a schedule for canpleting the tasks identified in Supplenent 1 to NUREG-0737.
Included in those tasks was a projected date of June 1,1984 for subnitting the Emergency Operating Procedures, Procedures Generation Package (PGP). Supplement 1 requested the PGP be subnitted at least three months prior to the date formal operator training on the upgraded procedures is to begin.
There has been recent NRC activity in the area of determining operator information and control needs as related to the development of energency operating procedures.
A clarification of the NBC's position on task analysis during the March 29 meeting between the HOG Procedures Subcamittee and mernbers of the NBC staff has resulted in revisions to our PGP. For this reason, additional time is needed prior to subnitting the Beaver Valley Unit 1 PGP. Therefore, we requc3t that you revise the subnittal date of our PGP to July 1, 1984. 'Ihis change is necessary to permit additional reviews of the PGP which was recently revised to incorporate additional NRC concerns involving EOP task analysis.
Formal operator training on the upgraded EOPs is not scheduled to begin until 1985 following simulator validation which is to occur in the spring of that year and therefore is not affected by this schedule change.
Additionally, this schedule change has been discussed with our NBC Project Manager and has been determined to be acceptable.
Should you have any questions concerning this subnittal, please contact me or merters of my staff.
Ve y yours, hSN4 $h4 Vice Pre dent, Nuclear o
F PDR
{
Beaver Vdley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Generic Ietter 82-33; EOP Procedures Generation Package 1Page 2 cc: Mr. Peter Tam, Project Manager U. S. NuclearTegulatory Comnission Phillips Building Washington, DC 20555
- Mail Stcp 438 -
i-U. S. Nuclear Regulatory Ccunission c/o Document Management Branch Washington, DC 20555-Mr. W.~ M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Otninission Beaver Valley Power Station Shippingport, PA 15077 I
i s-s I
i l
l I
I I
f i.
l 1
?
l 3.-
t i
,~.. _,., _. _. _., _ _... _ _ _,, _., _.,
m,-.
.., -, _,, ~
-